Skip to content

Hackney · E9

Splashbacks and upstands in Hackney Wick

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Hackney Wick kitchens

What the kitchens here are actually like

former factory and warehouse conversionlive-work unitnew-build apartmentcanal-side development

Open plan means long uninterrupted runs and an island in the middle of the room with every edge on show. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. The wall decides, not the brochure.

Industrial conversions and new blocks, so the kitchen runs open-plan against one wall of the main space with a 3.5-4m run and an island or a long peninsula. Ceilings are high and services are surface-run, which changes where a splashback can sensibly stop.

Narrow lanes between the canal and the railway, gated yards, and buildings designed around goods vehicles rather than parking, a few still with loading doors and hoists. Walls in these converted units are rarely plumb and often bare brick, so an upstand shows every undulation and a separate stone splashback scribed to the wall works far better.

Original brickwork is uneven by ten millimetres or more across a bay, so the back edge is scribed to the actual face rather than to a line. Exposed brick is the defining issue: the face is uneven by 10mm or more across a bay, so a stone splashback either scribes to it, which means the back of the panel has to be relieved, or it is deliberately set proud on a subframe with a shadow reveal all round. Cut from the same slab run as the tops.

The mix here is former factory and warehouse conversion, live-work unit, new-build apartment and canal-side development. Which of those you have decides most of what follows.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our east London run. Fitted 3–7 working days from template.

warehouse and wharf conversions

What gets asked for here

The research on this patch does not put this among the three commonest jobs. Worktop fabrication, worktop installation and worktop design & quotation do. That changes how often we are here, not how the work is done.

warehouse and wharf conversions

Getting stone into the room

Newer blocks have booked service lifts while the older conversions can mean a long industrial stair.

A car that takes 2.4m on the diagonal will not take a three-metre worktop however it is stood, and there is no trimming it on the landing. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. That is agreed at template, not on fitting day.

Access

Getting stone into a Hackney Wick kitchen

Narrow lanes between the canal and the railway, gated yards, and buildings designed around goods vehicles rather than parking, a few still with loading doors and hoists. Newer blocks have booked service lifts while the older conversions can mean a long industrial stair.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

east London patch

Hackney Wick is covered on our east London run, along with the rest of Hackney.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Hackney Wick

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Hackney Wick?

Yes. Hackney Wick is on the patch, and the postcodes we work here are E9. It is worked on our east London run, along with the rest of Hackney. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Hackney Wick change how worktop splashbacks & upstands works?

Original brickwork is uneven by ten millimetres or more across a bay, so the back edge is scribed to the actual face rather than to a line. Exposed brick is the defining issue: the face is uneven by 10mm or more across a bay, so a stone splashback either scribes to it, which means the back of the panel has to be relieved, or it is deliberately set proud on a subframe with a shadow reveal all round. Decided before fabrication starts. Walls in these converted units are rarely plumb and often bare brick, so an upstand shows every undulation and a separate stone splashback scribed to the wall works far better.

How does the stone actually reach a kitchen in Hackney Wick?

Narrow lanes between the canal and the railway, gated yards, and buildings designed around goods vehicles rather than parking, a few still with loading doors and hoists. Newer blocks have booked service lifts while the older conversions can mean a long industrial stair. A car that takes 2.4m on the diagonal will not take a three-metre worktop however it is stood, and there is no trimming it on the landing. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. That is agreed at template, not on fitting day.

Do you get much worktop splashbacks & upstands work in Hackney Wick?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop fabrication, worktop installation and worktop design & quotation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Siliconed to the worktop, never grouted.

Why do two Hackney Wick kitchens the same size price differently?

Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. Make the wall good first, or accept the detail. Decide and build the backing method, scribe, subframe or board, before the template, because the templater is measuring to that face and not to the brick. Where the owner is not local, the decisions happen remotely, so photographs and a clear itemised drawing carry more weight than a showroom visit ever would. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. Same slab run as the tops.

Next step

Splashbacks and upstands in Hackney Wick, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489