
City of Westminster · SW1P
Splashbacks and upstands in Millbank
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Millbank kitchens
What the kitchens here are actually like
The room is square, the walls are plumb and the floor is flat, so almost every complication in the job belongs to the building rather than the kitchen. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Siliconed to the top, never grouted.
Riverside blocks with generous flats but old-fashioned kitchen rooms - typically a 3m run and a return with a serving hatch that clients want closed up.
Refurbishments here are about modernising an enclosed kitchen rather than opening it into the living room, because the walls are usually structural. Closing up a hatch leaves a patched wall that is never flush with the rest - template after the plastering, not before, or the upstand will not sit tight. Millbank itself is a red route so vehicles use the block's own forecourt or a booked bay.
Floor-to-ceiling glazing lights the worktop from one side all day, which shows every ripple in a polished surface and every gap at a scribe. The plasterboard is flat enough for a full-height panel; it is the socket positions that cause the trouble. Cut from the same slab run as the tops.
The stock behind these kitchens runs to 1930s riverside mansion block, 1990s riverside apartment and institutional conversion. They are not interchangeable, and a worktop finds the differences quickly.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our central London run. Fitted 3–7 working days from template.
mansion blocks and purpose-built flats
Getting stone into the room
Purpose-built blocks with porters, a residents' lift and a separate service lift, and most managing agents restrict works to weekday daytime with no weekend noise.
The lift has to be booked and blanketed before anything moves, and that booking needs to cover the old tops coming out as well as the new stone going in. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut.
mansion blocks and purpose-built flats
What gets asked for here
The research on this patch does not put this among the three commonest jobs. Worktop replacement, worktop templating and worktop installation do. That changes how often we are here, not how the work is done.
Access
Getting stone into a Millbank kitchen
Purpose-built blocks with porters, a residents' lift and a separate service lift, and most managing agents restrict works to weekday daytime with no weekend noise. Millbank itself is a red route so vehicles use the block's own forecourt or a booked bay.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
central London patch
Millbank is covered on our central London run, along with the rest of Westminster.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Millbank
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Millbank?
Yes. Millbank is on the patch, and the postcodes we work here are SW1P. It is worked on our central London run, along with the rest of Westminster. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Millbank change how worktop splashbacks & upstands works?
Floor-to-ceiling glazing lights the worktop from one side all day, which shows every ripple in a polished surface and every gap at a scribe. The plasterboard is flat enough for a full-height panel; it is the socket positions that cause the trouble. Cut from the same slab run as the tops. Closing up a hatch leaves a patched wall that is never flush with the rest - template after the plastering, not before, or the upstand will not sit tight.
How does the stone actually reach a kitchen in Millbank?
Purpose-built blocks with porters, a residents' lift and a separate service lift, and most managing agents restrict works to weekday daytime with no weekend noise. Millbank itself is a red route so vehicles use the block's own forecourt or a booked bay. The lift has to be booked and blanketed before anything moves, and that booking needs to cover the old tops coming out as well as the new stone going in. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut.
Do you get much worktop splashbacks & upstands work in Millbank?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop templating and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Developer-fitted kitchens come with thin cam-lock carcasses, which are fine under laminate and want bracing before stone goes on them. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day. Housings and integrated appliances are set out for a 38mm laminate top, so dropping to 20mm or 30mm stone changes the clearances and needs checking before anything is cut. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Siliconed to the worktop, never grouted.
Why do two Millbank kitchens the same size price differently?
A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. The wall has to be ready.
Related
More around Millbank
Other work we do in Millbank
Next step
Splashbacks and upstands in Millbank, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.