Skip to content

City of Westminster · SW1V

Splashbacks and upstands in Pimlico

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Pimlico kitchens

What the kitchens here are actually like

Cubitt stucco terrace conversion1950s Churchill Gardens block1970s Lillington Gardens brick estate

The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Same slab run, same day, same batch.

Conversion flats in the stucco terraces have small kitchens carved out of grand rooms, typically a 2.4m galley with high ceilings and a cornice cut short. The post-war estate flats have purpose-built kitchens of about 2.5m by 2m with a fitted larder - workable, but there is no island going in either.

Street parking is permit and pay-by-phone with a lot of resident pressure, and the wider stucco streets have suspended bays for other trades most weeks.

The flat entrance door and the internal doorways are usually tighter than the communal stairs, which is the opposite of what most people assume. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Decided before fabrication starts.

On these streets the housing is Cubitt stucco terrace conversion, 1950s Churchill Gardens block and 1970s Lillington Gardens brick estate. Each of those behaves differently once the old top comes off.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our central London run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

Getting stone into the room

Estate blocks are the constraint - low-rise sections with no lift at all, walkway access, and communal doors that must not be wedged.

Permit hours are what matters, not the permit itself, because a bay that frees up at six in the evening is no use for a template at ten. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are.

Victorian and Edwardian terraces

What gets asked for here

Honestly, this is not what we do most on this patch. Worktop replacement, worktop templating and worktop installation come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Victorian and Edwardian terraces

The building, and what it does to the job

Post-war estate kitchens use non-standard cabinet depths and out-of-square corners from the original concrete frame - template every corner, do not assume 90 degrees.

Access

Getting stone into a Pimlico kitchen

Estate blocks are the constraint - low-rise sections with no lift at all, walkway access, and communal doors that must not be wedged. Street parking is permit and pay-by-phone with a lot of resident pressure, and the wider stucco streets have suspended bays for other trades most weeks.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

central London patch

Pimlico is covered on our central London run, along with the rest of Westminster.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Pimlico

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Pimlico on your patch?

Yes. Pimlico is on the patch, and the postcodes we work here are SW1V. It is worked on our central London run, along with the rest of Westminster. Without a bay the van ends up on a single yellow with a crew member watching it, which takes a pair of hands off the carry. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Pimlico be any different from anywhere else?

Cornice, picture rails and deep skirting survive in converted rooms, so the run stands off the wall and the back edge follows the units rather than the plaster. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. Cut from the same slab run as the tops. Post-war estate kitchens use non-standard cabinet depths and out-of-square corners from the original concrete frame - template every corner, do not assume 90 degrees.

How would you get a worktop into a property in Pimlico?

Estate blocks are the constraint - low-rise sections with no lift at all, walkway access, and communal doors that must not be wedged. Street parking is permit and pay-by-phone with a lot of resident pressure, and the wider stucco streets have suspended bays for other trades most weeks. Weight tells on a staircase more than anywhere else, because there is nowhere to set a piece down mid-flight and no way to change your grip once it is moving. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut.

Is Pimlico really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop templating and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.

What moves the number on a quote around here?

Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Pimlico?

Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. Consent for the work sits with the freeholder or the managing body, and getting it in writing first avoids a crew arriving to a locked door. Full-height panels need the wall made good first, which is another trade and another timescale. Same slab run as the tops.

Next step

Splashbacks and upstands in Pimlico, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489