The place
Why Belgravia is its own job
The part of a Belgravia job that goes wrong is almost never the stone, it is what nobody looked at first. Listed status and estate landlord consent govern everything, works hours are policed by the managing agent and neighbours, skips are effectively banned so waste goes out by hand, and slabs come down an external area stair or through the front door and down a stone flight with a tight turn at the bottom. Basement kitchens here run long and thin, so the slab has to be brought in on edge down a stair with limited headroom - measure the stair soffit, that is what limits piece length, not the room. The template is where the room stops being a drawing and starts being measurements, and the price follows the measurements.

