City of Westminster · SW1W SW1X

Worktop installation in Belgravia

Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Arctic Starburst carried round a U-shaped kitchen in pale grey handleless units, pendants over the breakfast bar

Belgravia kitchens

The kitchens we meet in Belgravia

Nine times out of ten the installations in Belgravia that go smoothly are the ones where somebody asked awkward questions about the room at the start. The stucco terraces put the kitchen in the lower ground floor, usually as part of a basement remodel with a lightwell and a rear vault, so the room is long, narrow and artificially lit. Islands are common but slim - 900mm wide rather than 1.2m - and the material is almost always a large-format marble or a marble-look sintered slab. Every quote we write for Belgravia starts with somebody looking at the actual run, not with an assumption about what is behind the units.

Nothing in a house of this age is square, and the kitchen is usually the part that has been altered most often. Almost everything that makes a fitting day hard is a property of the building rather than of the stone. Packers under the carcass, not shims under the stone.

Original panelling and shutter boxes stand out from the structural wall, so the face the units meet is joinery rather than plaster. Scribing takes longer than the carry does, so the quiet half of the day is the half that runs over. The shell has the last word on fitting day.

Most of what we quote on here is Grade II stucco terrace, Cubitt townhouse, mews house and period mansion flat. What the units are screwed to varies between them, and that decides the fixings.

Worktop join finished flush against a wall
  • Grade II stucco terrace
  • Cubitt townhouse
  • mews house
  • period mansion flat

True everywhere

Worktop installation, in short

  • One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
  • We seat and seal the sink and hob. We do not connect water, waste, gas or electrics.
  • Floors and units are protected before anything comes through the door.
  • The fit follows a template taken in the same room, not a set of plan measurements.
Borough
City of Westminster
Postcodes
SW1W, SW1X
Covered on
our central London run
Fitted
5–10 working days from template

The place

Why Belgravia is its own job

If you have had a worktop fitted in Belgravia before, you will recognise some of this. Listed status and estate landlord consent govern everything, works hours are policed by the managing agent and neighbours, skips are effectively banned so waste goes out by hand, and slabs come down an external area stair or through the front door and down a stone flight with a tight turn at the bottom. Basement kitchens here run long and thin, so the slab has to be brought in on edge down a stair with limited headroom - measure the stair soffit, that is what limits piece length, not the room. That is the sort of thing we come and look at in Belgravia before we quote, not after you have committed.

The work

What worktop installation involves

Installation assumes the pieces already fit. It is not a fitting service for stone somebody else cut, because the day depends on the template and the machining having been done to the same drawing. We do not connect services. A plumber takes the tap and waste off before we arrive and puts them back once the sealant is in, and a gas hob is another trade again. You end up with the fitting day behind you in one go. There is no second appointment for a piece that did not fit and no trades left waiting on each other to come back.

A fitting day is mostly preparation and sequence. The stone itself is down in under an hour once everything before it has been done properly. Cut-outs are machined at the works, but the final seating happens with the appliance in front of us rather than a drawing of it. The hall turn is usually what decides whether a long piece arrives whole, and that is settled at template rather than discovered on the doorstep. The kitchen is usable again the same evening.

Corners and joins See the options

The money

What it costs in Belgravia

An access-driven join is priced like any other join, and it is the one people are most surprised to see on a straight run. An island is a yield question before it is a design one: it either comes out of the same slab as the perimeter or it needs a second. The stone is quoted at £110 to £550 per square metre supply only, and the labour is kept out of it deliberately, because a blended rate hides the lines you would otherwise question. One visit, and what it covers is written down.

Victorian and Edwardian terraces

Belgravia in the housing figures

Around here the council tax banding sits near the top of the London range. No two kitchens are set out alike. It decides how many hands the day needs, which is the part people find out late. Sealed and wiped down the same afternoon.

Victorian and Edwardian terraces

What Belgravia asks for

The housing here makes this the default job rather than the alternatives.

Victorian and Edwardian terraces

The shape of the run

Power and waste come up through the floor, and where they surface decides which cabinet can hold a sink and which one cannot. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. The return is offered up last.

Access

Getting stone into a Belgravia kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

Central London patch

Belgravia is covered on our central London run, along with the rest of Westminster.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Belgravia

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to Belgravia?

Yes. Belgravia is on the patch, and the postcodes we work here are SW1W, SW1X. It is worked on our central London run, along with the rest of Westminster. Where the van can pull up level with the gate the pieces are handled the fewest times, which is what actually protects them. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. The parking dictates the sequence, not the kitchen. You never have to visit anything or collect anything: we template in your kitchen and fit in your kitchen.

02

Why would worktop installation in Belgravia be any different from anywhere else?

A basement is often reached by its own door under the front steps, and that door is smaller than anything else on the route. The day is planned backwards from the hall. Old fabric gets handled as old fabric. A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. The alcove piece is dry-laid before the run is.

03

What is the carry like in Belgravia?

Stone goes up on edge, and it is the half-landing turn rather than the flight itself that sets the maximum piece. The fitting day is planned backwards from that point, before anything comes off the van. Pieces wait on trestles until the fitters call for them. Unrestricted does not mean empty, and a street that is clear at seven is usually full by nine. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. Where there is no space, the plan starts the night before.

04

Is worktop installation what Belgravia rings about?

Yes. On the research for this patch it is the first of the three jobs listed. A managed portfolio tends to repeat one specification across every flat, which keeps later repairs and replacements simple to order. The fitting day is scheduled to suit that rather than to suit the diary. A date agreed in spring is a hope by autumn. Damage in a let flat is settled as a deposit deduction, so a surface that can be repaired in place is worth more than one that has to be replaced whole. Where the window is fixed there is no second day to fall back on, so the prep list matters more than usual. Book us when the units exist, not when they are ordered.

05

Where does the money go on a Belgravia worktop?

A hob cut-out and the floor penetration feeding it have to land over the same cabinet, and where they do not it is the stone that gets redrawn rather than the pipework. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Mitres are pulled together, never pushed. Supply only, material is £110 to £550 per square metre, with templating, fabrication and fitting quoted on their own lines.

06

What needs to be ready before you come to Belgravia?

Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. Rushing that is what leaves a gap you look at every morning for fifteen years. Packers go under the carcass, never under the stone. Clear the full hall and stairs route of furniture, bikes, coats and stair-gates, and keep the front door propped and unobstructed for the carry. Inventories record the condition of a kitchen at both ends of a tenancy, which is a practical argument for a surface that looks the same in its fifth year as its first. A half-day of access is not a fitting day, and it is better to say so at booking than to find out at eleven. Communal floors are protected the same as private ones.

07

Can I have grooves instead of a separate drainer in Belgravia?

The bowl position has to be settled before templating, since the grooves are set out from it. The alternative stands on the surface, so the choice is losing worktop permanently or only while you are draining. The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. The fitting day is planned backwards from all of it, before the first piece comes off the van. One visit, our own installers.

08

What happens to the worktop that comes off?

An old stone top is heavier coming out than the new one is going in, and leaves in sections. Take the old tops off yourself if you would rather, and the quote simply carries one line fewer. What comes out goes by the same route the new stone comes in by, which is why that route is walked before anything is lifted. A skip, a delivery lorry or a run of scaffolding takes the frontage the van needed, so the street is worth a look the day before rather than on the morning. We aim for the first slot of the day where parking is tight, because that is when the street is emptiest. The van does not stay on a main road once it is empty.

09

What happens if a piece will not go up the stairs?

The lift, if there is one, is measured on the diagonal, because that is the dimension a long piece actually uses. Hoisting through a window is occasionally the answer, and it is a decision made at the template, not improvised on the fitting day. Where there is a lift, whether it can be booked out and padded matters as much as its size. A walk-up with winders at every half-landing means the piece is rested and re-gripped on the way, so the crew size goes up before the piece size comes down. Finding it out on the morning costs the whole slot, because there is no second route to fall back on. Every re-grip is a chance to chip a piece, so they are planned out.

10

What if a piece cracks while it is being carried in?

A piece is never laid flat across a gap while it is moved, because that is how stone cracks unaided. Most breakages happen on the carry, which is why the route is walked and measured before anything comes off the van. Floors and units are protected before anything comes through the door. Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. We walk the route with a tape and protect it end to end before the first piece is lifted. Someone stays on the trailing end the whole way in.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Karim is excellent, he did superb job with Templeting and fitting my kitchen, highly recommend”
M SgGoogle review
★★★★★
“I am really happy with the work! He fitted my kitchen granite worktop really nicely and got the job done on time, just as promised. He was friendly, professional, and made sure everything was done the way I wanted. Would definitely recommend Karam to anyone looking for a great job!”
esther boaduGoogle review · granite
★★★★★
“Nice work from worktop worx. Highly recommended”
Rasika KumarageGoogle review

Next step

Worktop installation in Belgravia, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.