Skip to content

Croydon · CR0

Kitchen worktops in New Addington

A large planned estate with highly repetitive layouts: small rectangular kitchens of around 2.4-3m of run, a larder or broom cupboard in the corner, and a back door onto a rear garden. Nearly all work is replacing worn tops on existing units, with an upstand instead of tiles.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

The housing stock

What we are usually working with in New Addington

1930s-50s cottage estatepost-war terracelow-rise maisonette1990s regeneration housing

Wide estate roads, grass verges you must not drive on, and long shared paths serving several front doors. Nearly all work is replacing worn tops on existing units, with an upstand instead of tiles. A large planned estate with highly repetitive layouts: small rectangular kitchens of around 2.4-3m of run, a larder or broom cupboard in the corner, and a back door onto a rear garden.

Because the house types repeat across the whole estate, once you have templated one kitchen you know the run length on the next, but you still template every one because previous owners have moved the back door.

Maisonettes have external stairs with a handrail that limits how you can swing a piece.

The mix here is 1930s-50s cottage estate, post-war terrace, low-rise maisonette and 1990s regeneration housing. A quote that ignores which one you have is guessing.

Small, roughly square kitchens with a back door and a window in the middle of the run: short lengths, few joins, and a lot to work around. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. Stone is far heavier than what is coming off.

The window sits in the middle of the run over the sink, and its board and cill set the limit on how tall an upstand can be. Chipboard carcasses under the sink swollen from a slow leak will not take stone and get replaced before fit day. What is under the old top is the real question.

Stone goes up on edge, and it is the half-landing turn rather than the flight itself that sets the maximum piece. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. It sets what the day actually looks like.

Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. The wall has to be ready.

Access. Wide estate roads, grass verges you must not drive on, and long shared paths serving several front doors. Maisonettes have external stairs with a handrail that limits how you can swing a piece.

At a glance

Borough
Croydon
Postcodes
CR0
Covered on
our south London run
Lead time
3–7 working days from template

There is nothing to visit in New Addington. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Questions

Working in New Addington

Do you fit kitchen worktops in New Addington?

Yes. A large planned estate with highly repetitive layouts: small rectangular kitchens of around 2.4-3m of run, a larder or broom cupboard in the corner, and a back door onto a rear garden. Nearly all work is replacing worn tops on existing units, with an upstand instead of tiles. Unrestricted kerbside is straightforward as long as the space in front of the property is actually clear when the van arrives. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Old tops out and new stone in, both through the same gap.

What kind of kitchens do you usually work on in New Addington?

1930s-50s cottage estate, post-war terrace, low-rise maisonette and 1990s regeneration housing. Base units from the seventies and eighties are often only 500mm deep, so a 600mm stone top overhangs at the front and the doors want checking against it. Post-war terraces have small, roughly square kitchens with a back door and a window in the middle of the run, so runs are short and joins are rare, but there are usually two corners and a window cill to work around in a couple of metres. Units kept, surface changed, one day.

Is access difficult in New Addington?

Wide estate roads, grass verges you must not drive on, and long shared paths serving several front doors. Maisonettes have external stairs with a handrail that limits how you can swing a piece. A walk-up with winders at every half-landing means the piece is rested and re-gripped on the way, so the crew size goes up before the piece size comes down. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. The strip-out is planned around it.

What do you get asked for most in New Addington?

Worktop replacement, worktop splashbacks & upstands and worktop templating, in that order. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day. Because the house types repeat across the whole estate, once you have templated one kitchen you know the run length on the next, but you still template every one because previous owners have moved the back door.

What decides the price of a worktop in New Addington?

Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. The units stay, the surface changes. A run can measure dead right at both ends and still belly out in the middle, which only appears once the template plots the intermediate points. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.

Do you work in flats and leasehold properties in New Addington?

The householder is normally on site at template, and that is the right time to settle sink position, tap centres and overhang rather than agree them by email. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.

Next step

Get your New Addington kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489