
Croydon · CR0
Worktop templating in New Addington
A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
New Addington kitchens
What the kitchens here are actually like
Blockwork with a hard render that has been patched over decades looks modern and behaves nothing like it. Two to three hours on site, once the units are fitted, fixed and level. Sink, tap and hob on site, not on order.
Wide estate roads, grass verges you must not drive on, and long shared paths serving several front doors. Nearly all work is replacing worn tops on existing units, with an upstand instead of tiles. A large planned estate with highly repetitive layouts: small rectangular kitchens of around 2.4-3m of run, a larder or broom cupboard in the corner, and a back door onto a rear garden.
Base units from the seventies and eighties are often only 500mm deep, so a 600mm stone top overhangs at the front and the doors want checking against it. Runs commonly finish at a doorway, and the architrave and skirting stand proud of the plaster, so the end of the top is notched or stopped on the drawing. No stone is ever cut from a plan.
The stock behind these kitchens runs to 1930s-50s cottage estate, post-war terrace, low-rise maisonette and 1990s regeneration housing. A quote that ignores which one you have is guessing.
True everywhere
Worktop templating, in short
- Two to three hours on site for a typical kitchen.
- Units must be fitted, fixed and level first. No stone is ever cut from a plan.
- Sink, tap and hob must be physically on site, not just ordered.
- A Belfast or butler sink must be installed and at its final height.
Covered on our south London run. Fitted 3–7 working days from template.
ex-local-authority flats and estates
The building, and what it does to the job
Because the house types repeat across the whole estate, once you have templated one kitchen you know the run length on the next, but you still template every one because previous owners have moved the back door.
ex-local-authority flats and estates
What gets asked for here
It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.
ex-local-authority flats and estates
Getting stone into the room
Maisonettes have external stairs with a handrail that limits how you can swing a piece.
Weight tells on a staircase more than anywhere else, because there is nowhere to set a piece down mid-flight and no way to change your grip once it is moving. Door widths, turn diagonals and any change of level are recorded on the drawing alongside the run dimensions. It goes on the drawing with the run dimensions.
Access
Getting stone into a New Addington kitchen
Wide estate roads, grass verges you must not drive on, and long shared paths serving several front doors. Maisonettes have external stairs with a handrail that limits how you can swing a piece.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south London patch
New Addington is covered on our south London run, along with the rest of Croydon.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop templating in New Addington
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is New Addington on your patch?
Yes. New Addington is on the patch, and the postcodes we work here are CR0. It is worked on our south London run, along with the rest of Croydon. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. The templating visit needs somewhere to stop for two or three hours, which is a different problem from unloading for twenty minutes. The templater needs a proper stop, not a pause. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop templating in New Addington be any different from anywhere else?
Base units from the seventies and eighties are often only 500mm deep, so a 600mm stone top overhangs at the front and the doors want checking against it. The scribe at worktop height differs from the one at plinth level, and only the worktop line matters. Two to three hours, once the units are in. Because the house types repeat across the whole estate, once you have templated one kitchen you know the run length on the next, but you still template every one because previous owners have moved the back door.
How would you get a worktop into a property in New Addington?
Wide estate roads, grass verges you must not drive on, and long shared paths serving several front doors. Maisonettes have external stairs with a handrail that limits how you can swing a piece. Stone goes up on edge, and it is the half-landing turn rather than the flight itself that sets the maximum piece. A template taken without walking the route produces a drawing that cuts beautifully and will not go in. The template records it along with everything else.
Do you do much worktop templating around New Addington?
It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. No stone is ever cut from a plan, which is inconvenient exactly when a programme is tight. Units fitted, fixed and level first.
What moves the number on a quote around here?
A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. A layout templated off one wall instead of one datum will not sit right once all the pieces are down together. Real angles, not plan angles. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to New Addington?
The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. The template plots it as it is, at the exact height the worktop will sit, and the drawing carries that through. Measured at worktop height, nowhere else. Units fixed, packed level and pushed as far back as the leaning wall allows, walls made good to final thickness with tiling left until after the worktop, and the sink, tap and hob on site so cut-outs are set from the real items. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. The template happens when the units are in, fixed and level, whoever is fitting them. Fitted, fixed and level, then we come.
Related
More around New Addington
Other work we do in New Addington
Next step
Worktop templating in New Addington, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.