
Croydon · CR0
Worktop replacement in New Addington
Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
New Addington kitchens
What the kitchens here are actually like
Floors have usually settled towards the rear, so levelling means packing the units before the stone beds down. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Sound carcasses are the one condition.
Wide estate roads, grass verges you must not drive on, and long shared paths serving several front doors. Nearly all work is replacing worn tops on existing units, with an upstand instead of tiles. A large planned estate with highly repetitive layouts: small rectangular kitchens of around 2.4-3m of run, a larder or broom cupboard in the corner, and a back door onto a rear garden.
Walls look modern and are not: block or breeze with a skim that has been patched over decades, so dry-laying and scribing still apply. The units are often 1970s or 80s and only around 500mm deep, so a standard 600mm stone top overhangs at the front and the doors and drawer fronts need checking against it. What is under the old top is the real question.
The stock behind these kitchens runs to 1930s-50s cottage estate, post-war terrace, low-rise maisonette and 1990s regeneration housing. They are not interchangeable, and a worktop finds the differences quickly.
True everywhere
Worktop replacement, in short
- The units stay. Only the surface changes.
- Old tops come out in the morning, new stone is down and sealed the same day.
- A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
- The carcasses have to be sound: stone is far heavier than laminate.
Covered on our south London run. Fitted 3–7 working days from template.
ex-local-authority flats and estates
What gets asked for here
The research on this patch puts this at the top of the list, above worktop splashbacks & upstands and worktop templating.
ex-local-authority flats and estates
The building, and what it does to the job
Because the house types repeat across the whole estate, once you have templated one kitchen you know the run length on the next, but you still template every one because previous owners have moved the back door.
ex-local-authority flats and estates
Getting stone into the room
Maisonettes have external stairs with a handrail that limits how you can swing a piece.
Weight tells on a staircase more than anywhere else, because there is nowhere to set a piece down mid-flight and no way to change your grip once it is moving. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The strip-out is planned around it.
Access
Getting stone into a New Addington kitchen
Wide estate roads, grass verges you must not drive on, and long shared paths serving several front doors. Maisonettes have external stairs with a handrail that limits how you can swing a piece.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south London patch
New Addington is covered on our south London run, along with the rest of Croydon.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop replacement in New Addington
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in New Addington, or just list it?
Yes. New Addington is on the patch, and the postcodes we work here are CR0. It is worked on our south London run, along with the rest of Croydon. Unrestricted kerbside is straightforward as long as the space in front of the property is actually clear when the van arrives. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. Old tops out and new stone in, both through the same gap. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop replacement in New Addington?
The window sits in the middle of the run over the sink, and its board and cill set the limit on how tall an upstand can be. Post-war terraces have small, roughly square kitchens with a back door and a window in the middle of the run, so runs are short and joins are rare, but there are usually two corners and a window cill to work around in a couple of metres. Units kept, surface changed, one day. Because the house types repeat across the whole estate, once you have templated one kitchen you know the run length on the next, but you still template every one because previous owners have moved the back door.
Is access a problem in New Addington?
Wide estate roads, grass verges you must not drive on, and long shared paths serving several front doors. Maisonettes have external stairs with a handrail that limits how you can swing a piece. Weight tells on a staircase more than anywhere else, because there is nowhere to set a piece down mid-flight and no way to change your grip once it is moving. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The strip-out is planned around it.
Is New Addington mostly worktop replacement work for you?
Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop splashbacks & upstands and worktop templating. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A day, not a project. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project.
What decides the price of a worktop in New Addington?
Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Carcasses have to be sound first. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. The laminate has been covering it up. Empty the base units completely and have a plumber disconnect the sink, tap and any washing machine plumbed in under the worktop before we arrive. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. A plumber disconnects before we arrive and reconnects after we leave, and that is worth booking early. Units kept, surface changed.
Related
More around New Addington
Other work we do in New Addington
Next step
Worktop replacement in New Addington, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.