
Lewisham · SE14
Splashbacks and upstands in New Cross
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
New Cross kitchens
What the kitchens here are actually like
The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. The wall decides, not the brochure.
A lot of houses in multiple occupation and student lets around the college, where kitchens are hard-used single runs of 2.4m to 3m and durability matters more than looks; the remaining family houses have back-addition kitchens with the side return opened up.
Landlord and HMO work here wants a hard-wearing, easily replaced run, not a book-matched island.
Cornice, picture rails and deep skirting survive in converted rooms, so the run stands off the wall and the back edge follows the units rather than the plaster. Where a client wants a full-height piece behind the hob, it usually sits in the old chimney recess, and that recess is rarely square top to bottom or side to side, so it has to be templated as a trapezium rather than a rectangle. Cut from the same slab run as the tops.
What we are usually templating in is Georgian and early Victorian terrace, Victorian terrace, 1960s council block and student HMO conversion. Each of those behaves differently once the old top comes off.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our south east London run. Fitted 3–7 working days from template.
period detached houses and villas
What gets asked for here
Access in a tenanted flat depends on the tenant, so the template and fitting dates are agreed with whoever actually holds the keys. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Same slab run as the tops.
This is not the local speciality and there is no point saying otherwise: worktop replacement, worktop fabrication and worktop installation is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.
period detached houses and villas
Getting stone into the room
The main road junctions are heavy with traffic and red-route restrictions, so unloading happens on the side streets, and many terraces have steps up to a raised front door.
Access
Getting stone into a New Cross kitchen
The main road junctions are heavy with traffic and red-route restrictions, so unloading happens on the side streets, and many terraces have steps up to a raised front door.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south east London patch
New Cross is covered on our south east London run, along with the rest of Lewisham.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in New Cross
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover New Cross?
Yes. New Cross is on the patch, and the postcodes we work here are SE14. It is worked on our south east London run, along with the rest of Lewisham. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in New Cross change how worktop splashbacks & upstands works?
A villa cut into flats leaves kitchens in rooms that were never kitchens, with services run to wherever they could physically be made to reach. Lath-and-plaster on the party wall and the chimney breast returns almost never runs true, so a 100mm upstand bedded on silicone is the honest answer here, it rides the bow and hides the junction the worktop can never close on its own. The wall makes that decision, not the brochure. Landlord and HMO work here wants a hard-wearing, easily replaced run, not a book-matched island.
How does the stone actually reach a kitchen in New Cross?
The main road junctions are heavy with traffic and red-route restrictions, so unloading happens on the side streets, and many terraces have steps up to a raised front door. Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It decides panel size before anything is cut.
Is New Cross really a worktop splashbacks & upstands area?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop fabrication and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Batching several kitchens together is the one situation where buying a whole slab is cheaper per kitchen rather than more expensive. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template. A licensed shared house has fire-door and escape-route rules that decide how and when stone can be carried through the common parts. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted.
Why do two New Cross kitchens the same size price differently?
The step or level change between the original room and the return is real, and the units need packing before stone goes across it. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Make the wall good first, or accept the detail. The chimney breast recess must be replastered and fully dry, and the hob and extractor positions fixed, before anyone templates a full-height piece into it. A let property is specified for durability and for a fixed window, and both of those are legitimate reasons to choose differently. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after.
Related
More around New Cross
Other work we do in New Cross
Next step
Splashbacks and upstands in New Cross, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.