
Lewisham · SE14
Kitchen worktops in New Cross
A lot of houses in multiple occupation and student lets around the college, where kitchens are hard-used single runs of 2.4m to 3m and durability matters more than looks; the remaining family houses have back-addition kitchens with the side return opened up.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
The housing stock
What we are usually working with in New Cross
A lot of houses in multiple occupation and student lets around the college, where kitchens are hard-used single runs of 2.4m to 3m and durability matters more than looks; the remaining family houses have back-addition kitchens with the side return opened up.
Landlord and HMO work here wants a hard-wearing, easily replaced run, not a book-matched island.
The main road junctions are heavy with traffic and red-route restrictions, so unloading happens on the side streets, and many terraces have steps up to a raised front door.
The stock behind these kitchens runs to Georgian and early Victorian terrace, Victorian terrace, 1960s council block and student HMO conversion. A quote that ignores which one you have is guessing.
Nothing in a house of this age is square, and the kitchen is usually the part that has been altered most often. The workshop works to the template drawing and to the measured route, in that order. The drawing decides it before the saw does.
Cornice, picture rails and deep skirting survive in converted rooms, so the run stands off the wall and the back edge follows the units rather than the plaster. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. The slow parts are slow for a reason.
The step or level change between the original room and the return is real, and the units need packing before stone goes across it. A join that lands in the wrong place cannot be moved once the cut-outs are machined, so it is settled on the drawing. The bench proves it before the van does.
Access in a tenanted flat depends on the tenant, so the template and fitting dates are agreed with whoever actually holds the keys. Floors and units are protected before anything comes through the door, communal or otherwise. Protection goes down first.
Access. The main road junctions are heavy with traffic and red-route restrictions, so unloading happens on the side streets, and many terraces have steps up to a raised front door.
At a glance
- Borough
- Lewisham
- Postcodes
- SE14
- Covered on
- our south east London run
- Lead time
- 3–7 working days from template
There is nothing to visit in New Cross. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Services
What we do in New Cross
Six services, ordered by what New Cross's housing stock actually asks for most.
Nearby
We also work around New Cross
Questions
Working in New Cross
Do you fit kitchen worktops in New Cross?
Yes. A lot of houses in multiple occupation and student lets around the college, where kitchens are hard-used single runs of 2.4m to 3m and durability matters more than looks; the remaining family houses have back-addition kitchens with the side return opened up. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. The day is built around that window.
What kind of kitchens do you usually work on in New Cross?
Georgian and early Victorian terrace, Victorian terrace, 1960s council block and student HMO conversion. Lease conditions and the other flats in the building decide when noisy work can happen, so the fitting day has a start and a finish that are not ours to set. The day is planned backwards from the hall. That is the shape of the day.
Is access difficult in New Cross?
The main road junctions are heavy with traffic and red-route restrictions, so unloading happens on the side streets, and many terraces have steps up to a raised front door. Everything comes through the front door and down the hall, so the tightest point on the route is usually the newel post at the foot of the stairs. The fitting day is planned backwards from that point, before anything comes off the van. That is what the morning is planned around.
What do you get asked for most in New Cross?
Worktop replacement, worktop fabrication and worktop installation, in that order. Small kitchens in a shared house are all short runs and tight cut-out spacing, which is more bench work per square metre than one large kitchen would be. The fitting day is scheduled to suit that rather than to suit the diary. One visit, done properly. Landlord and HMO work here wants a hard-wearing, easily replaced run, not a book-matched island.
What decides the price of a worktop in New Cross?
Rooflights along a side return mean the worktop is lit from directly above all day, which shows every ripple in a surface and every gap at a scribe. The nest is laid out around that, with joins placed over cabinet gables and kept clear of every cut-out. That is nested before any glass goes on the saw. Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. The template drawing carries the real geometry through to the saw, and the piece is machined to it rather than trimmed to it later. Radiused, polished, and clear of the joins. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.
Do you work in flats and leasehold properties in New Cross?
A let property is specified for durability and for a fixed window, and both of those are legitimate reasons to choose differently. The fitting day is arranged with whoever can actually give us access for the whole slot. Access for the whole slot, or a different day. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.
Next step
Get your New Cross kitchen priced
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.