Lewisham · SE14
Kitchen worktops in New Cross
A lot of houses in multiple occupation and student lets around the college, where kitchens are hard-used single runs of 2.4m to 3m and durability matters more than looks; the remaining family houses have back-addition kitchens with the side return opened up.
- 25-year material · 5-year workmanship
- Fitted 5-10 working days from template

The housing stock
What we are usually working with in New Cross
Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. All of that is settled at the nesting stage, because a machined piece cannot be adjusted afterwards. Cut to the room, not to a rectangle.
Landlord and HMO work here wants a hard-wearing, easily replaced run, not a book-matched island.
Where the kitchen has taken the bay, the end of the room is three facets of glass set at angles and there is no straight wall left to finish against. Pieces are stood on edge for the turns and carried flat for the straights, and that sequence is agreed before anything comes off the van. The house sets the order of work.
The stock behind these kitchens runs to Georgian and early Victorian terrace, Victorian terrace, 1960s council block and student HMO conversion. The one you have sets the piece length before the kitchen does.
Access. The main road junctions are heavy with traffic and red-route restrictions, so unloading happens on the side streets, and many terraces have steps up to a raised front door.
There is nothing to visit in New Cross. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
- Borough
- Lewisham
- Postcodes
- SE14
- Covered on
- our south east London run
- Lead time
- 5–10 working days from template
Get a fixed quote Free samples
- Georgian and early Victorian terrace
- Victorian terrace
- 1960s council block
- student HMO conversion
Lewisham
What gets asked for here
A single long run down one side puts every cut-out in one piece, so the sink, the hob and any drainer grooves all take material out of the same length. Cut-outs are made in the workshop with the piece fully supported on a bed, which is why nothing is cut on site if there is any way round it. Undersides are polished where the piece is seen from below.
The building, and what it does to the job
In this corner of the borough, the council tax banding sits at the bottom of the London range. The plans vary house by house. Where several kitchens are done together they come off the same slab run, or the batch will not match. Polished edges finished before loading, never after.
The original scullery gully is still live in the yard outside the back door, and new waste from the sink joins a drain laid for a copper and a stone sink. Pieces are sized to the tightest turn on the route before anything is nested to the slab. The bench proves it before the van moves.
Corners and joins See the options
Services
What we do in New Cross
Nine services, ordered by what New Cross's housing stock actually asks for most.
Worktop replacement in New Cross
Old tops out, stone down, your units kept
Read moreWorktop installation in New Cross
Fitted, scribed, joined and sealed by our own installers
Read moreWorktop fabrication in New Cross
Cut, mitred, polished and dry-assembled in our workshop
Read moreWorktops in New Cross
Supply and fit, priced by the square metre
Read moreBathroom worktops in New Cross
Vanity tops and bathroom surfaces from the same slabs
Read moreBar tops in New Cross
Home and trade bar surfaces, with the overhang supported properly
Read moreRestaurant table tops in New Cross
Cut, profiled and drilled to your existing bases
Read moreReception counters in New Cross
Counter tops with the transaction shelf and knee recess worked in
Read moreWorktop splashbacks & upstands in New Cross
Cut from the same slab run as the worktop
Read more
Nearby
We also work around New Cross
New Cross is one of 25 places we cover in Lewisham. Where else we work in Lewisham
Questions
Working in New Cross
01Do you take on New Cross kitchens?
Yes. A lot of houses in multiple occupation and student lets around the college, where kitchens are hard-used single runs of 2.4m to 3m and durability matters more than looks; the remaining family houses have back-addition kitchens with the side return opened up. The van is not staying on a main road for the day, so once the stone is off it goes and parks properly somewhere else. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. The clock on the bay runs whether the lift is free or not.
02What is the housing like from a worktop point of view in New Cross?
Georgian and early Victorian terrace, Victorian terrace, 1960s council block and student HMO conversion. Cornice runs round the head of the wall, so the wall units stop under it and the splashback band is trapped between two things that are not going to move. The day is planned backwards from the hall. Levelled first, then set, then sealed.
03Is getting the worktop in the hard part in New Cross?
The main road junctions are heavy with traffic and red-route restrictions, so unloading happens on the side streets, and many terraces have steps up to a raised front door. Turning a heavy piece on edge indoors needs floor space at both ends of the turn, so the hall is cleared of furniture before anything comes off the van. Finding it out on the morning costs the whole slot, because there is no second route to fall back on. Someone stays on the trailing end the whole way in.
04What do you get asked for most in New Cross?
Worktop replacement, worktop fabrication and worktop installation, in that order. Where a single building holds several small kitchens, the work arrives as one job rather than four, and it should be cut off the same slab run so the batches genuinely match. The fitting day is scheduled to suit that rather than to suit the diary. The prep list is not optional. Landlord and HMO work here wants a hard-wearing, easily replaced run, not a book-matched island.
05Why do New Cross quotes vary so much?
A galley run down a side-return extension usually measures longer than a slab will give in one length, so a join is designed in from the start rather than discovered. The nest is laid out around that, with joins placed over cabinet gables and kept clear of every cut-out. That is nested before any glass goes on the saw. Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. The template drawing carries the real geometry through to the saw, and the piece is machined to it rather than trimmed to it later. Left and right alcove pieces are marked and stay marked. Material is from £110 per square metre supply only, and the templating, the fabrication and the fitting are each quoted on their own line.
06Is a leasehold flat in New Cross any harder to do?
Work between tenancies runs against a fixed date rather than a preference, and stone has a lead time that has to fit inside that window with a few days spare. The fitting day is arranged with whoever can actually give us access for the whole slot. The room cleared before the crew arrives. If we know the building when you book, the lift, the stair turn and any freeholder notice are worked into the day rather than found on it.
07What if the base units are out of level?
An island is where this usually shows, standing free with no wall to level against. The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Levelling belongs in the carcasses, on their own legs and packers. A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. Cut it square where it should be radiused and the piece will fail on the lift, not in the kitchen. A relief that deep changes how the piece is lifted.
08Does a stone worktop need sealing?
Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. A seal is not waterproofing. It only buys time to wipe a spill up. Topping a seal up is a wipe-on job with a cloth. The chimney breast is usually still standing with the opening blocked up, and the alcoves either side of it are rarely the same width as each other. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. Carried once, and carried properly.
09I have a slab already. Can you template and fit it in New Cross?
Delivery to the workshop has to be arranged and dated, since nothing is nested until it is there. How much slab you hold matters: upstands and any remake have to come out of the same batch. Small kitchens in a shared house are all short runs and tight cut-out spacing, which is more bench work per square metre than one large kitchen would be. One visit, with the sink and hob seated and sealed before we leave. Sealed before we leave.
10What happens once you have templated in New Cross?
Money does not move until the template is done. Nothing is measured until the sink, the tap and the hob are in the room to measure against. The template is taken in your kitchen after the units are in and fixed, never before. A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. The workshop works to the template drawing and to the measured route, in that order. The slab is laid out around the awkward piece.
Reviews
5.0 from 26 Google reviews
Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.
“Great work, super helpful team. I'd definitely recommend!”
“Great experience from this company, I am happy with the materials, fitting and the team.”
“Absolutely delighted with our new worktop from Worktop WorX. The Capri White finish looks incredible, clean, modern, and really brightens up the whole kitchen while pairing beautifully with the darker cabinetry. The quality of the worktop is outstanding, with a flawless finish and seamless installation that really shows the attention to detail. It’s not only stylish but also feels incredibly durable and practical for everyday use. Cam handled everything from start to finish and made the whole process smooth and stress-free. Professional, reliable, and clearly takes pride in the work. Highly recommend Worktop WorX. We couldn’t be happier with the result!”
Next step
Get your New Cross kitchen priced
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.