Skip to content

Lewisham · SE14

Worktop replacement in New Cross

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

New Cross kitchens

What the kitchens here are actually like

Georgian and early Victorian terraceVictorian terrace1960s council blockstudent HMO conversion

Nothing in a house of this age is square, and the kitchen is usually the part that has been altered most often. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. A single day, planned properly.

A lot of houses in multiple occupation and student lets around the college, where kitchens are hard-used single runs of 2.4m to 3m and durability matters more than looks; the remaining family houses have back-addition kitchens with the side return opened up.

Landlord and HMO work here wants a hard-wearing, easily replaced run — not a book-matched island.

Lease conditions and the other flats in the building decide when noisy work can happen, so the fitting day has a start and a finish that are not ours to set. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. Units kept, surface changed, one day.

The mix here is Georgian and early Victorian terrace, Victorian terrace, 1960s council block and student HMO conversion. Which of those you have decides most of what follows.

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.

Covered from the New Malden patch. Fitted 3–7 working days from template.

period detached houses and villas

The building, and what it does to the job

Floors and walls that have settled towards the back addition, so the existing run is out of level and the stone will show it the moment it is set and levelled properly.

period detached houses and villas

Getting stone into the room

The main road junctions are heavy with traffic and red-route restrictions, so unloading happens on the side streets, and many terraces have steps up to a raised front door.

A narrow entrance hall with a turn into the back of the house caps the longest piece we can physically get in, whatever the run itself measures. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. It sets what the day actually looks like.

period detached houses and villas

What gets asked for here

Of everything we do around here, this is the one that comes up most, with worktop fabrication and worktop installation behind it.

Access

Getting stone into a New Cross kitchen

The main road junctions are heavy with traffic and red-route restrictions, so unloading happens on the side streets, and many terraces have steps up to a raised front door.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

New Malden patch

New Cross is worked from our New Malden run, covering South West London & Surrey.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop replacement in New Cross

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover New Cross?

Yes. New Cross is on the patch, and the postcodes we work here are SE14. It is run from the New Malden side, covering South West London & Surrey. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. It is a full day at the kerb, not a delivery. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in New Cross change how worktop replacement works?

A villa cut into flats leaves kitchens in rooms that were never kitchens, with services run to wherever they could physically be made to reach. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. Units kept, surface changed, one day. Landlord and HMO work here wants a hard-wearing, easily replaced run — not a book-matched island.

How does the stone actually reach a kitchen in New Cross?

The main road junctions are heavy with traffic and red-route restrictions, so unloading happens on the side streets, and many terraces have steps up to a raised front door. A narrow entrance hall with a turn into the back of the house caps the longest piece we can physically get in, whatever the run itself measures. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The strip-out is planned around it. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is New Cross mostly worktop replacement work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop fabrication and worktop installation. Batching several kitchens together is the one situation where buying a whole slab is cheaper per kitchen rather than more expensive. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project. Batching several kitchens together is the one situation where buying a whole slab is cheaper per kitchen rather than more expensive. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project.

Why do two New Cross kitchens the same size price differently?

Rooflights along a side return mean the worktop is lit from directly above all day, which shows every ripple in a surface and every gap at a scribe. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. Carcasses have to be sound first. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. This is the commonest reason a replacement turns out to need more than a straight swap. The laminate has been covering it up. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Where the owner is not local, the decisions happen remotely, so photographs and a clear itemised drawing carry more weight than a showroom visit ever would. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Units kept, surface changed.

Next step

Worktop replacement in New Cross, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398