The building, and what it does to the job
Small lifts and deck walkways make jointed pieces normal, design the joint into the run rather than apologising for it later.
Lewisham · SE14
Estate-heavy: maisonettes and flats with fitted galley kitchens around 2.4m, often replaced under housing association or landlord programmes, plus Victorian terraces on the edges that are small two-bed houses with a rear kitchen barely 2m wide.

The housing stock
A cylinder cupboard or a drying cupboard opens off the kitchen, taking a corner out of the run and giving nothing back. The old tops come off in pieces, and what is under them decides whether the units need levelling before anything new goes on. A single day, planned properly.
These are built in dense concrete, so support for a peninsula or an end panel goes in with proper anchors rather than plugs. Ex-council flats and maisonettes are built in dense concrete and blockwork, so anything that has to be fixed back, such as brackets under a peninsula or support for an end panel, goes in with proper anchors and an SDS rather than plasterboard fixings. A replacement is measured against the walls as they are now.
The houses and blocks behind these jobs are Victorian terrace, 1960s-70s council estate, 1980s housing association terrace and 2010s infill flats. The join count is decided by which of those the room sits in.
Access. Estate layouts with parking courts, deck access and small lifts, and the retail park and main road restricting where a van can wait; most flats are walk-up or served by a single lift.
There is nothing to visit in New Cross Gate. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Get a fixed quote Free samples
Lewisham
Small lifts and deck walkways make jointed pieces normal, design the joint into the run rather than apologising for it later.
Taken across New Cross Gate and the roads either side of it, the bands run low by London standards. The schedule matters more than the finish. A busy top loses yield to the openings long before it loses any to the length of the run. Dry-assembled before anything leaves the workshop.
Once a long piece is in on the diagonal there is no room left for anyone else, so it travels up alone and is met on the landing above. It also decides how the pieces are crated and in what order they are loaded onto the van. The crate is built to the same measurement.
Edge profiles See the options
Services
Nine services, ordered by what New Cross Gate's housing stock actually asks for most.
Old tops out, stone down, your units kept
Read moreCut, mitred, polished and dry-assembled in our workshop
Read moreSupply and fit, priced by the square metre
Read moreVanity tops and bathroom surfaces from the same slabs
Read moreHome and trade bar surfaces, with the overhang supported properly
Read moreCut, profiled and drilled to your existing bases
Read moreCounter tops with the transaction shelf and knee recess worked in
Read moreFitted, scribed, joined and sealed by our own installers
Read moreCut from the same slab run as the worktop
Read moreNearby
New Cross Gate is one of 25 places we cover in Lewisham. All 25 Lewisham neighbourhoods
Questions
Yes. Estate-heavy: maisonettes and flats with fitted galley kitchens around 2.4m, often replaced under housing association or landlord programmes, plus Victorian terraces on the edges that are small two-bed houses with a rear kitchen barely 2m wide. A skip, a delivery lorry or a run of scaffolding takes the frontage the van needed, so the street is worth a look the day before rather than on the morning. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. Two carries in one day doubles what the distance costs.
Victorian terrace, 1960s-70s council estate, 1980s housing association terrace and 2010s infill flats. Where the kitchen is on the entrance level, the piece comes off the deck and turns straight in without going up or down at all. The plaster is bonded straight onto the concrete, so the bottom course of tiles tends to bring plaster with it when the old top comes off, leaving a rough band behind the upstand. Chipboard that has taken water will not take stone.
Estate layouts with parking courts, deck access and small lifts, and the retail park and main road restricting where a van can wait; most flats are walk-up or served by a single lift. Pieces get staged in the ground floor lobby and sent up singly, which needs somewhere to stand them where nobody will walk into them. So the nesting is worked to the measured route first and to the slab second. A piece is cut to the turn it has to clear.
Worktop replacement and worktop fabrication, in that order. Quartz suits let property well: no sealing, no annual maintenance, and nothing an incoming tenant has to be told to look after. So the nesting is planned around it rather than around a standard kitchen. Six kitchens, one slab run, one colour. Small lifts and deck walkways make jointed pieces normal, design the joint into the run rather than apologising for it later.
Walls at both ends mean two scribes on every piece, and a run that has to drop between two fixed points has no tolerance left to give away. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Yield is worked out fresh for the new material. Anything that has to stay accessible, a stopcock, a gas meter, a riser panel, is marked on the template so the stone is cut around it instead of over it. The template drawing carries the real geometry through to the saw, and the piece is machined to it rather than trimmed to it later. A notch and a cut-out never share the same span. Supply-only material opens at £110 per square metre, and templating, fabrication and fitting are quoted line by line rather than as a single number.
Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. Changing an appliance after the nest is set means recutting the piece, not adjusting it. Changes cost a piece, not a tweak. Say what the building is at the booking stage and the lift, the stair turn and any freeholder notice become part of the plan rather than a surprise.
Delivery to the workshop has to be arranged and dated, since nothing is nested until it is there. Say what you have and where it came from before anything is booked, because thickness and batch decide what can be done with it. A worktop replacement between tenancies is a single-day job by design, because the flat is not earning while it is empty. Cutting several kitchens from different slabs and calling them matched is where firms get caught out. A batch split across two weeks stops being a batch.
A seal is not waterproofing. It only buys time to wipe a spill up. Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. Upkeep is settled when the slab is chosen, since it belongs to the material rather than the fabrication. A service duct runs between the kitchen and the bathroom stacked above it, and access to that duct stays open whatever the layout does. Plaster bonded straight onto concrete comes away with the bottom course of tiles, leaving a band behind the upstand. The floor has dropped since the kitchen went in.
Undermount bowls are cut and polished in the workshop and dry-fitted to the stone on the bench before anything is loaded. The sink, tap and hob have to be physically in the room at the template, not merely ordered, because the cut-out is machined to the item itself. An aisle under a metre stops being a working space the moment two people are in it, and the depth of the tops either side is what decides whether that happens. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. A run that flexed under laminate gets support now.
A full-height piece shows a wall that is out more than an upstand does, over the extra height. If it is a decision for later, say so at the template: the match is a question about the batch. Both are templated after the worktop is down and settled, because they are cut to the wall itself. The external wall is a concrete panel with a modest window, so the run under it sits in a shallow reveal with a hard cill. Anything that has to be held back goes into concrete with proper anchors rather than into a plug and a hope. Whatever the shell has done since is dealt with now.
Reviews
Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
“Excellent work and highly recommend. Very professional and did an outstanding job with my worktop. Karem responded very quickly and swiftly, top guy!”
“Perfect service,the best on this job”
Next step
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.