
Greenwich · SE18
Worktop replacement in Plumstead
Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Plumstead kitchens
What the kitchens here are actually like
Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Stone is far heavier than what is coming off.
Steep hillside streets with permit parking and no driveways, plus long flights of front steps on the upper roads, the carry is usually uphill and through the house rather than round the side. Straight galley runs of 2.4m to 3.2m, wall units both sides, no island. Tight Victorian terraces stepping up the hill, most with a narrow back-addition kitchen, and a high proportion of flat conversions where the kitchen has been fitted into whatever room was left.
Cornice, picture rails and deep skirting survive in converted rooms, so the run stands off the wall and the back edge follows the units rather than the plaster. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. What is under the old top is the real question.
The buildings themselves are mostly dense Victorian terrace, Edwardian terrace, postwar estate and 1980s infill. They are not interchangeable, and a worktop finds the differences quickly.
True everywhere
Worktop replacement, in short
- The units stay. Only the surface changes.
- Old tops come out in the morning, new stone is down and sealed the same day.
- A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
- The carcasses have to be sound: stone is far heavier than laminate.
Covered on our south east London run. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
Getting stone into the room
Door width, hall width and the diagonal at the turn are three separate measurements, and it is the diagonal that catches people out. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. That is agreed before a plumber is booked.
Victorian and Edwardian terraces
The building, and what it does to the job
Old lath-and-plaster and soft brick mean scribing to bowed walls is normal; assume the back wall is out by 15mm over 3m.
Floors and walls that have settled towards the back addition, so the existing run is out of level and the stone will show it the moment it is set and levelled properly.
Victorian and Edwardian terraces
What gets asked for here
The research on this patch puts this at the top of the list, above worktop templating and worktop fabrication.
Access
Getting stone into a Plumstead kitchen
Steep hillside streets with permit parking and no driveways, plus long flights of front steps on the upper roads, the carry is usually uphill and through the house rather than round the side.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south east London patch
Plumstead is covered on our south east London run, along with the rest of Greenwich.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop replacement in Plumstead
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Plumstead?
Yes. Plumstead is on the patch, and the postcodes we work here are SE18. It is worked on our south east London run, along with the rest of Greenwich. Without a bay the van ends up on a single yellow with a crew member watching it, which takes a pair of hands off the carry. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Old tops out and new stone in, both through the same gap. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Plumstead change how worktop replacement works?
Lease conditions and the other flats in the building decide when noisy work can happen, so the fitting day has a start and a finish that are not ours to set. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. Units kept, surface changed, one day. Old lath-and-plaster and soft brick mean scribing to bowed walls is normal; assume the back wall is out by 15mm over 3m.
How does the stone actually reach a kitchen in Plumstead?
Steep hillside streets with permit parking and no driveways, plus long flights of front steps on the upper roads, the carry is usually uphill and through the house rather than round the side. Carrying through the house means protecting the whole route first: floor boarded, banister padded, and the front door held open on a wedge rather than by hand. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The strip-out is planned around it.
Is Plumstead mostly worktop replacement work for you?
Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop templating and worktop fabrication. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Old tops out in the morning, new stone down and sealed the same afternoon. A day, not a project. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A day, not a project.
Why do two Plumstead kitchens the same size price differently?
Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Carcasses have to be sound first. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
Walls that bow along their length are the normal condition rather than the exception, and a straight-cut back edge will show a shadow gap at one end and touch at the other. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. It is the usual surprise, and it is a known one. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Mixed ownership means the decision-maker is not always the person who lets us in, so it is worth being clear early about who signs the quote off. If the carcasses are tired the honest answer is that stone will find that out, and it is better said before than after. Units kept, surface changed.
Related
More around Plumstead
Other work we do in Plumstead
Next step
Worktop replacement in Plumstead, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.