Skip to content

Greenwich · SE18

Kitchen worktops in Royal Arsenal Riverside

Apartments with a factory-fitted single-wall kitchen plus island, or a compact galley in the converted historic buildings where thick masonry eats the plan. The usual upgrade is swapping builder's-spec composite for 20mm quartz with a matching upstand, units untouched.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

The housing stock

What we are usually working with in Royal Arsenal Riverside

listed Arsenal building conversion2000s riverside apartment block2010s-2020s tower

Apartments with a factory-fitted single-wall kitchen plus island, or a compact galley in the converted historic buildings where thick masonry eats the plan.

In the listed blocks you often can't chase or drill historic walls, so upstands and end supports have to be carried by the units alone. A gated estate with a barrier, controlled vehicle access and time-limited loading arranged through estate management; the listed conversions add restrictions on what can be fixed into original brickwork. The usual upgrade is swapping builder's-spec composite for 20mm quartz with a matching upstand, units untouched.

What we are usually templating in is listed Arsenal building conversion, 2000s riverside apartment block and 2010s-2020s tower. That mix is why two jobs on the same road can run completely differently.

Developer carcasses are thin cam-lock chipboard, which is entirely adequate under laminate and wants bracing before stone. The units stay and only the surface changes, so the job is a day, and what makes it a difficult day is the building. Stone is far heavier than what is coming off.

Boxed soil stacks and ventilation ducts run behind the units, and the boxing depth changes between floor level and worktop height. The template records that corner as it is, so the mitre closes tight instead of being cut to a theoretical 90 degrees. No stone is ever cut from a plan.

The barrier, the entry code and the estate rules decide when a van can get near the door, and none of that is negotiable on the day. Door widths, turn diagonals and any change of level are recorded on the drawing alongside the run dimensions. That is part of what the visit is for.

Developer-fitted kitchens come with thin cam-lock carcasses, which are fine under laminate and want bracing before stone goes on them. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day.

A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. The template records every angle in that shape as it actually is rather than as the plan drew it. The drawing leaves site complete.

Access. A gated estate with a barrier, controlled vehicle access and time-limited loading arranged through estate management; the listed conversions add restrictions on what can be fixed into original brickwork.

At a glance

Borough
Greenwich
Postcodes
SE18
Covered on
our south east London run
Lead time
3–7 working days from template

There is nothing to visit in Royal Arsenal Riverside. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Questions

Working in Royal Arsenal Riverside

Do you fit kitchen worktops in Royal Arsenal Riverside?

Yes. Apartments with a factory-fitted single-wall kitchen plus island, or a compact galley in the converted historic buildings where thick masonry eats the plan. The usual upgrade is swapping builder's-spec composite for 20mm quartz with a matching upstand, units untouched. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. The templating visit needs somewhere to stop for two or three hours, which is a different problem from unloading for twenty minutes. It goes on the job sheet for the fitting crew.

What kind of kitchens do you usually work on in Royal Arsenal Riverside?

listed Arsenal building conversion, 2000s riverside apartment block and 2010s-2020s tower. The room is genuinely square and the units are plumb, so the visit is more about the building than about the kitchen. New-build rooms are genuinely square, but they are dot-and-dab plasterboard, and the taped internal angle is where it goes wrong - the board bellies at the corner and the run picks up a few millimetres over the last 300mm. Recorded as it is, not as it was drawn.

Is access difficult in Royal Arsenal Riverside?

A gated estate with a barrier, controlled vehicle access and time-limited loading arranged through estate management; the listed conversions add restrictions on what can be fixed into original brickwork. Estate roads are often too tight for a long-wheelbase van to turn, so the carry starts a good deal further from the door than a map suggests. The templater measures that route on the same visit, so the drawing leaves site already knowing the maximum piece. It goes on the drawing with the run dimensions.

What do you get asked for most in Royal Arsenal Riverside?

Worktop replacement, worktop templating and worktop splashbacks & upstands, in that order. Housings and integrated appliances are set out for a 38mm laminate top, so dropping to 20mm or 30mm stone changes the clearances and needs checking before anything is cut. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template. In the listed blocks you often can't chase or drill historic walls, so upstands and end supports have to be carried by the units alone.

What decides the price of a worktop in Royal Arsenal Riverside?

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. A layout templated off one wall instead of one datum will not sit right once all the pieces are down together. One datum for the whole room. Where a partition has been built off the floor screed rather than off the slab, it moves, and a mitre bonded across that corner is the first thing to open. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.

Do you work in flats and leasehold properties in Royal Arsenal Riverside?

The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. Full-height panels need the wall made good first, which is another trade and another timescale. Decided before fabrication, not after. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.

Next step

Get your Royal Arsenal Riverside kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489