Skip to content

Greenwich · SE18

Splashbacks and upstands in Royal Arsenal Riverside

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Royal Arsenal Riverside kitchens

What the kitchens here are actually like

listed Arsenal building conversion2000s riverside apartment block2010s-2020s tower

Developer carcasses are thin cam-lock chipboard, which is entirely adequate under laminate and wants bracing before stone. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Siliconed to the top, never grouted.

Apartments with a factory-fitted single-wall kitchen plus island, or a compact galley in the converted historic buildings where thick masonry eats the plan.

A gated estate with a barrier, controlled vehicle access and time-limited loading arranged through estate management; the listed conversions add restrictions on what can be fixed into original brickwork. In the listed blocks you often can't chase or drill historic walls, so upstands and end supports have to be carried by the units alone. The usual upgrade is swapping builder's-spec composite for 20mm quartz with a matching upstand, units untouched.

Boxed soil stacks and ventilation ducts run behind the units, and the boxing depth changes between floor level and worktop height. Every socket, switch and any USB point has to be cut out of the stone to the actual measured position, so the template has to be taken with the faceplates off and the back boxes visible. Decided before fabrication starts.

The mix here is listed Arsenal building conversion, 2000s riverside apartment block and 2010s-2020s tower. A quote that ignores which one you have is guessing.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our south east London run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

The building, and what it does to the job

Dot-and-dab plasterboard that sounds hollow behind the socket runs, so anything fixed through the splashback needs to hit the batten or dab rather than the void.

Victorian and Edwardian terraces

What gets asked for here

Second or third on the list around here, after worktop replacement. Same visit, same bench, same crew, same lead time.

Victorian and Edwardian terraces

Getting stone into the room

Where the parking court sits behind the block the carry crosses open ground and gets boarded, because loaded trolleys and block paving do not agree. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Joint positions follow from that.

Victorian and Edwardian terraces

True everywhere, stated once

What decides between a slim upstand and a full-height splashback is nearly always the wall: what it is made of, how flat it is, and where the sockets ended up.

Access

Getting stone into a Royal Arsenal Riverside kitchen

A gated estate with a barrier, controlled vehicle access and time-limited loading arranged through estate management; the listed conversions add restrictions on what can be fixed into original brickwork.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

south east London patch

Royal Arsenal Riverside is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Royal Arsenal Riverside

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Royal Arsenal Riverside on your patch?

Yes. Royal Arsenal Riverside is on the patch, and the postcodes we work here are SE18. It is worked on our south east London run, along with the rest of Greenwich. Unrestricted kerbside is straightforward as long as the space in front of the property is actually clear when the van arrives. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Royal Arsenal Riverside be any different from anywhere else?

Boxed soil stacks and ventilation ducts run behind the units, and the boxing depth changes between floor level and worktop height. Every socket, switch and any USB point has to be cut out of the stone to the actual measured position, so the template has to be taken with the faceplates off and the back boxes visible. Decided before fabrication starts. In the listed blocks you often can't chase or drill historic walls, so upstands and end supports have to be carried by the units alone.

How would you get a worktop into a property in Royal Arsenal Riverside?

A gated estate with a barrier, controlled vehicle access and time-limited loading arranged through estate management; the listed conversions add restrictions on what can be fixed into original brickwork. The barrier, the entry code and the estate rules decide when a van can get near the door, and none of that is negotiable on the day. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.

Do you do much worktop splashbacks & upstands around Royal Arsenal Riverside?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Developer-fitted kitchens come with thin cam-lock carcasses, which are fine under laminate and want bracing before stone goes on them. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day. Housings and integrated appliances are set out for a 38mm laminate top, so dropping to 20mm or 30mm stone changes the clearances and needs checking before anything is cut. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Sockets final before template.

What moves the number on a quote around here?

A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Royal Arsenal Riverside?

Taped internal angles in plasterboard belly at the corner, so the run picks up a few millimetres over the last 300mm and a plan-angle mitre will not close. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after.

Next step

Splashbacks and upstands in Royal Arsenal Riverside, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489