Skip to content

City of London · EC3N EC3A

Splashbacks and upstands in Aldgate

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Aldgate kitchens

What the kitchens here are actually like

modern residential toweroffice to residential conversion1980s-90s apartment blockmixed-use development over retail

Developer carcasses are thin cam-lock chipboard, which is entirely adequate under laminate and wants bracing before stone. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Siliconed to the top, never grouted.

Newer towers on the eastern edge give standard developer kitchens - a 3-3.4m run against the riser plus an island of about 2m, with an induction hob and a recirculating extract that fixes the hob position.

Tower blocks run full contractor control - induction, insurance, permit to work, booked goods lift and a lift protection kit fitted before the first piece moves. The Aldgate gyratory and its approaches are red route with no stopping, so everything goes through a basement service yard with a height barrier or a booked bay at the building entrance. Straight swaps onto existing carcases still need the carcase levels checked, because developer units settle and a 3m top will rock on units that were only shimmed once. Many of these are being upgraded from original laminate or composite to quartz within a few years of completion, so the job is a straight swap onto existing carcases.

Piece size is set by the lift car and the entrance dogleg, which routinely turns a two-piece kitchen into a three-piece one. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant, but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. Decided before fabrication starts.

The stock behind these kitchens runs to modern residential tower, office to residential conversion, 1980s-90s apartment block and mixed-use development over retail. A quote that ignores which one you have is guessing.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our the City run. Fitted 3–7 working days from template.

Victorian and Edwardian terraces

The shape of the run

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces.

Victorian and Edwardian terraces

What gets asked for here

Honestly, this is not what we do most on this patch. Worktop replacement, worktop installation and worktop templating come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

Access

Getting stone into a Aldgate kitchen

The Aldgate gyratory and its approaches are red route with no stopping, so everything goes through a basement service yard with a height barrier or a booked bay at the building entrance. Tower blocks run full contractor control - induction, insurance, permit to work, booked goods lift and a lift protection kit fitted before the first piece moves.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

the City patch

Aldgate is covered on our the City run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Aldgate

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Aldgate?

Yes. Aldgate is on the patch, and the postcodes we work here are EC3N, EC3A. It is worked on our the City run, along with the rest of the Square Mile. Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Aldgate change how worktop splashbacks & upstands works?

Piece size is set by the lift car and the entrance dogleg, which routinely turns a two-piece kitchen into a three-piece one. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant, but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. Decided before fabrication starts. Straight swaps onto existing carcases still need the carcase levels checked, because developer units settle and a 3m top will rock on units that were only shimmed once.

How does the stone actually reach a kitchen in Aldgate?

The Aldgate gyratory and its approaches are red route with no stopping, so everything goes through a basement service yard with a height barrier or a booked bay at the building entrance. Tower blocks run full contractor control - induction, insurance, permit to work, booked goods lift and a lift protection kit fitted before the first piece moves. The lift has to be booked and blanketed before anything moves, and that booking needs to cover the old tops coming out as well as the new stone going in. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It decides panel size before anything is cut.

Do you get much worktop splashbacks & upstands work in Aldgate?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop installation and worktop templating. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Housings and integrated appliances are set out for a 38mm laminate top, so dropping to 20mm or 30mm stone changes the clearances and needs checking before anything is cut. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template. Upgrading a builder-finish kitchen is mostly a swap, so the cost sits in the material choice rather than in the shape of the room. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day.

Why do two Aldgate kitchens the same size price differently?

The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. An upstand rides what a panel exposes. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. Decided before fabrication, not after.

Next step

Splashbacks and upstands in Aldgate, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489