
City of London · E1 EC3N
Splashbacks and upstands in Portsoken
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Portsoken kitchens
What the kitchens here are actually like
Floors have usually settled towards the rear, so levelling means packing the units before the stone beds down. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Siliconed to the top, never grouted.
This ward holds a genuine concentration of long-standing City residential, and the estate flats have small, closed kitchens of roughly 2.0-2.6m with shallow original units and a fixed boiler cupboard.
Small kitchens, long carries, and a lift you cannot rely on - the labour cost here is all in getting the stone from the kerb to the flat. Work here is nearly always straightforward replacement in the existing footprint, cutting round a service duct and finishing with matching stone upstands rather than tiles. Estate blocks with controlled entry, communal stairs and a single lift per core, and the surrounding streets have market trading and heavy pedestrian flow around Middlesex Street on trading days. There is no meaningful visitor parking, so the van works a short loading window and the crew does a long push across a courtyard to the block door.
Construction is blockwork with a render or a brick skin, so the walls are reasonably true and take a fixing properly. Post-war terraces are typically blockwork or early lightweight block with a hard render coat, and the kitchen has usually been reconfigured at least once, leaving patched areas of newer plaster next to original render that sit at different depths. The wall makes that decision, not the brochure.
On these streets the housing is City-owned postwar housing estate, 1960s-70s deck and corridor access block, modern infill flats and conversion above street-level retail. The differences between them show up at template, not at enquiry.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our the City run. Fitted 3–7 working days from template.
ex-local-authority flats and estates
Getting stone into the room
The practical answer is to check the fixture list before the date is offered, because a template slot lost to a road closure cannot be recovered that week. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. One trip is always better than three.
ex-local-authority flats and estates
What gets asked for here
This is one of the three jobs that come up most here, behind worktop replacement. It is the same template visit, the same workshop and the same installers either way.
Access
Getting stone into a Portsoken kitchen
Estate blocks with controlled entry, communal stairs and a single lift per core, and the surrounding streets have market trading and heavy pedestrian flow around Middlesex Street on trading days. There is no meaningful visitor parking, so the van works a short loading window and the crew does a long push across a courtyard to the block door.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
the City patch
Portsoken is covered on our the City run, along with the rest of the Square Mile.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Portsoken
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Portsoken on your patch?
Yes. Portsoken is on the patch, and the postcodes we work here are E1, EC3N. It is worked on our the City run, along with the rest of the Square Mile. The practical answer is to check the fixture list before the date is offered, because a template slot lost to a road closure cannot be recovered that week. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop splashbacks & upstands in Portsoken be any different from anywhere else?
Kitchens are compact and laid out to a standard plan, so runs are short and joins are usually avoidable altogether. Post-war terraces are typically blockwork or early lightweight block with a hard render coat, and the kitchen has usually been reconfigured at least once, leaving patched areas of newer plaster next to original render that sit at different depths. The wall makes that decision, not the brochure. Small kitchens, long carries, and a lift you cannot rely on - the labour cost here is all in getting the stone from the kerb to the flat.
How would you get a worktop into a property in Portsoken?
Estate blocks with controlled entry, communal stairs and a single lift per core, and the surrounding streets have market trading and heavy pedestrian flow around Middlesex Street on trading days. There is no meaningful visitor parking, so the van works a short loading window and the crew does a long push across a courtyard to the block door. Where the lift will not take the longest run we design a join in rather than gamble, because a piece that will not go up has to go back on the van. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.
Is worktop splashbacks & upstands common in Portsoken?
It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day. In a converted house the flat entrance and the internal doorway are usually tighter than the communal stairs, and that is easy to overlook. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted.
What moves the number on a quote around here?
The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Portsoken?
Boxing is rarely the same depth at worktop height as it is at floor level, so measuring it low down is the usual reason a top will not sit back. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. Boiler position, flue and any pipework drops must be settled and the wall skimmed level before templating the splashback run. Where a landlord or housing provider is involved there is a specification to meet and a process to follow, and both are settled before a date is offered. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Decided before fabrication, not after.
Related
More around Portsoken
Other work we do in Portsoken
Next step
Splashbacks and upstands in Portsoken, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.