Skip to content

City of London · EC3N

Splashbacks and upstands in Tower Hill

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Tower Hill kitchens

What the kitchens here are actually like

Georgian terrace on the surviving quiet streets1980s-90s apartment blockoffice conversion flatmodern hotel and residential mixed-use

The lift car, the loading bay and the building manager decide the piece sizes here, not the slab. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Same slab run, same day, same batch.

Nothing in the Georgian stock is square or level, so template with a digital arm and expect to scribe every back edge rather than cutting to a drawing. Tourist footfall around the Tower is constant and the surrounding roads carry heavy through traffic with no stopping, so loading has to be on the back streets in an off-peak window. The surviving Georgian houses on the quieter streets are narrow and listed in places, with kitchens at ground or basement of 2.4-3m, sloping floors and no straight walls to work to. Apartment blocks nearby are late twentieth century with conventional galley kitchens of 2.8-3.2m and a peninsula, where the job is usually replacing dated granite with a lighter engineered stone.

A former office building converted to flats has deep floorplates, so kitchens end up in internal rooms with no external wall at all. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant, but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. Cut from the same slab run as the tops.

What turns up on the job sheets is Georgian terrace on the surviving quiet streets, 1980s-90s apartment block, office conversion flat and modern hotel and residential mixed-use. Each of those behaves differently once the old top comes off.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our the City run. Fitted 3–7 working days from template.

period detached houses and villas

What gets asked for here

Honestly, this is not what we do most on this patch. Worktop templating, worktop replacement and worktop installation come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.

period detached houses and villas

Getting stone into the room

Georgian properties have narrow original doors and steep straight stairs with a tight half-landing, and the listing means no removal of joinery to get a piece through.

The realistic answer on a main road is an early slot, a spotter on the van and pieces staged in one movement rather than several trips. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged.

Access

Getting stone into a Tower Hill kitchen

Tourist footfall around the Tower is constant and the surrounding roads carry heavy through traffic with no stopping, so loading has to be on the back streets in an off-peak window. Georgian properties have narrow original doors and steep straight stairs with a tight half-landing, and the listing means no removal of joinery to get a piece through.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

the City patch

Tower Hill is covered on our the City run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Tower Hill

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Tower Hill on your patch?

Yes. Tower Hill is on the patch, and the postcodes we work here are EC3N. It is worked on our the City run, along with the rest of the Square Mile. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Tower Hill be any different from anywhere else?

A former office building converted to flats has deep floorplates, so kitchens end up in internal rooms with no external wall at all. Every socket, switch and any USB point has to be cut out of the stone to the actual measured position, so the template has to be taken with the faceplates off and the back boxes visible. Decided before fabrication starts. Nothing in the Georgian stock is square or level, so template with a digital arm and expect to scribe every back edge rather than cutting to a drawing.

How would you get a worktop into a property in Tower Hill?

Tourist footfall around the Tower is constant and the surrounding roads carry heavy through traffic with no stopping, so loading has to be on the back streets in an off-peak window. Georgian properties have narrow original doors and steep straight stairs with a tight half-landing, and the listing means no removal of joinery to get a piece through. Stone goes up on edge, and it is the half-landing turn rather than the flight itself that sets the maximum piece. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. Joint positions follow from that.

Is Tower Hill really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop templating, worktop replacement and worktop installation. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template. Party-wall and lease conditions in a converted building set when noisy work can happen, which shapes the fitting day more than the kitchen does. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted.

What moves the number on a quote around here?

A peninsula is an island with one end tied to a run, which means the join between them has to be planned rather than allowed to happen. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Tower Hill?

Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. An upstand rides what a panel exposes. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. Full-height panels need the wall made good first, which is another trade and another timescale. Same slab run as the tops.

Next step

Splashbacks and upstands in Tower Hill, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489