Skip to content

City of London · EC2V

Worktop replacement in Cheapside

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Cheapside kitchens

What the kitchens here are actually like

modern apartment above retailpostwar block with upper-floor flatsoffice conversionmixed-use development

A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. Taking the old tops off is also the first honest look at what has been going on underneath them. A single day, planned properly.

Residential units above the Cheapside retail frontage are modern and tightly planned, with a galley or L of 2.8-3.4m and a breakfast bar overhang of 250-300mm that needs proper bracketry rather than relying on the stone.

New stock came with composite tops that owners are now upgrading to quartz, keeping the existing undermount sink position and tap holes. Retail servicing takes priority in the shared basement bays, so residential deliveries get an off-peak slot, generally mid-morning or after the shops shut.

A villa cut into flats leaves kitchens in rooms that were never kitchens, with services run to wherever they could physically be made to reach. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. Sound carcasses are the one condition.

What we are usually templating in is modern apartment above retail, postwar block with upper-floor flats, office conversion and mixed-use development. Each of those behaves differently once the old top comes off.

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.

Covered on our the City run. Fitted 3–7 working days from template.

new-build flats and apartments

Getting stone into the room

Cheapside itself has bus lanes and daytime loading restrictions, and the residential entrances are usually a discreet side door off a neighbouring lane rather than on the main frontage.

A dedicated loading bay or service yard is the easiest arrangement in a managed building, provided the slot is booked and someone has the key to the shutter. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. It is a full day at the kerb, not a delivery.

new-build flats and apartments

What gets asked for here

Of everything we do around here, this is the one that comes up most, with worktop installation and worktop templating behind it.

new-build flats and apartments

The building, and what it does to the job

Overhangs on these breakfast bars need steel flat bar, not faith - 30mm quartz unsupported past about 300mm will crack at the sink corner sooner or later.

Access

Getting stone into a Cheapside kitchen

Cheapside itself has bus lanes and daytime loading restrictions, and the residential entrances are usually a discreet side door off a neighbouring lane rather than on the main frontage. Retail servicing takes priority in the shared basement bays, so residential deliveries get an off-peak slot, generally mid-morning or after the shops shut.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

the City patch

Cheapside is covered on our the City run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop replacement in Cheapside

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Cheapside?

Yes. Cheapside is on the patch, and the postcodes we work here are EC2V. It is worked on our the City run, along with the rest of the Square Mile. A dedicated loading bay or service yard is the easiest arrangement in a managed building, provided the slot is booked and someone has the key to the shutter. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. Old tops out and new stone in, both through the same gap. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Cheapside change how worktop replacement works?

The flat entrance door and the internal doorways are usually tighter than the communal stairs, which is the opposite of what most people assume. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. What is under the old top is the real question. Overhangs on these breakfast bars need steel flat bar, not faith - 30mm quartz unsupported past about 300mm will crack at the sink corner sooner or later.

How does the stone actually reach a kitchen in Cheapside?

Cheapside itself has bus lanes and daytime loading restrictions, and the residential entrances are usually a discreet side door off a neighbouring lane rather than on the main frontage. Retail servicing takes priority in the shared basement bays, so residential deliveries get an off-peak slot, generally mid-morning or after the shops shut. A short hard approach with no steps means a full-length piece can be walked in flat by two people rather than turned up on edge. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. It sets what the day actually looks like.

Is worktop replacement the job you do most in Cheapside?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation and worktop templating. Small kitchens in a shared house are all short runs and tight cut-out spacing, which is more bench work per square metre than one large kitchen would be. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project. Batching several kitchens together is the one situation where buying a whole slab is cheaper per kitchen rather than more expensive. Old tops out in the morning, new stone down and sealed the same afternoon. A day, not a project.

Why do two Cheapside kitchens the same size price differently?

Because a peninsula is seen from both sides, the underside of any overhang gets the same edge treatment as the top, which is easy to leave out of a spec. Going from a 38mm laminate to 20mm or 30mm stone drops the surface, which shows against tiles, a window board and any freestanding appliance. Height change is checked before we cut. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Where a column lands in the run the template plots its actual outline so the stone is cut to fit around it rather than stopped short and filled. We would rather find it at template than on the morning, which is why the templater looks behind the units. Found at template, not on fit day. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Plumber either side of us.

Next step

Worktop replacement in Cheapside, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489