Skip to content

Newham · E16

Stone bar tops in Custom House

A bar top takes weight on its front edge all evening, so the overhang and what carries it matter more than the slab does.

  • 5.0from 26 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Custom House kitchens

The buildings and streets around Custom House

interwar terracepost-war council housingrecent regeneration apartment

A good quote for stone bar top work in Custom House reads like a description of your kitchen rather than a price list, and that is deliberate. Older terraces and council houses have small rear kitchens of around 2.2m to 2.6m with a pantry recess and a back door in the run. New replacement blocks have single-wall open-plan kitchens, so the work is either a small traditional refit or a like-for-like swap in a modern flat. You will see the drawing before anything is machined, and if it is wrong on paper it gets changed on paper.

Rear extensions on these sit on shallow foundations, and the crack at the junction with the original wall tells you which way it has moved. What carries a bar top here is rarely a kitchen carcass, so the framing underneath gets looked at before anything is measured across the top of it. A bar top is fitted last and touched first.

The chimney breast served a back boiler and is usually still standing, so there is a shallow recess on one side of the room. A garage conversion is the other common home for one, and a garage floor falls away towards the old door, so the frame is packed level before a tape goes across it. The stone is the last element of the joinery, not the first.

The stock behind these kitchens runs to interwar terrace, post-war council housing and recent regeneration apartment. Which one you have changes the order of the day more than the design does.

True everywhere

Stone bar tops, in short

  • Anything past about 300mm of unsupported overhang gets steel or a corbel underneath.
  • The front edge is the one people touch, so it is profiled and polished on all exposed faces.
  • Quartz is the usual choice indoors; porcelain and sintered stone where drinks and citrus are constant.
  • A bar top is fitted level to itself, not to the floor, because floors in older buildings rarely are.
Borough
Newham
Postcodes
E16
Covered on
our east London run
Fitted
5–10 working days from template

The place

Why Custom House is its own job

Because we work across Custom House rather than one street of it, we know which questions are worth asking up front. Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs. Site hoardings regularly block the road you templated from, so leave a bit of slack in the delivery window for a diverted approach. Everything above is looked at on the free design visit, and none of it is charged for until the template.

The work

What bar tops involves

Material choice is part of it: quartz for most indoor bars, porcelain or sintered stone where citrus, wine and strong cleaning products land on the surface every day. We measure the frame before we measure the top, because a bar top is set level to itself and the frame is what it will be packed off. You are left with every visible face finished to one standard, the underside of the front edge included, which is the face a seated person looks straight at.

Bar work is joinery with a stone surface on it, and the joinery is the half that decides whether the surface behaves itself. Fixings passing through a frame into a party wall or anything structural are agreed with whoever owns that wall before a hole is drilled. The open end of a knocked-through room is where these land, and being read from two sides doubles the finished edge on the same piece. One visit, and the bar is usable that evening.

Undermounted sink cut-out in a quartz worktop
Sink cut-outsSee the options

The money

What it costs in Custom House

Two counters of the same length price very differently depending on how far the front edge reaches, because past a certain point the carcass stops carrying it and steel starts. In a galley the runs are short and the cut-outs are close together, so the fixed operations carry more of the total than the stone does. Thickness, finish and colour move a slab within the £110 to £550 supply band before anyone touches it, so that figure is settled by what you pick rather than by the room. Nothing about the support is folded into the stone rate.

1930s and inter-war semis

Custom House in the housing figures

Across Custom House, upper-band homes are rare in the stock. Void periods set the date more often than taste does. A bar added at the end of a project is templated on a visit of its own, once the joinery around it has stopped moving. A seat never sits above a seam.

1930s and inter-war semis

The building, and what it does to the job

Alcove pieces get cut oversize on both scribe edges, with the true wall angles carried on the template drawing rather than assumed. A counter fixed back to lightweight framing takes a sideways push as well as a downward load, and framing built for neither gets noggins let into it first. The support plan is drawn at the same time as the cut-out.

1930s and inter-war semis

What Custom House asks for

Not a domestic job, so it is not ranked against the streets around it. Those streets generate worktop replacement, worktop templating and worktop installation. Same slabs, same saw, same installers.

Access

Getting stone into a Custom House kitchen

Ongoing regeneration means hoardings, closed roads and diverted footways that change month to month, so the route needs checking on the day rather than from a map. Where houses survive there is decent kerb space and level front access, which makes those the straightforward jobs.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted, working days from template. The same on this patch as every other.

east London patch

Custom House is covered on our east London run, along with the rest of Newham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Custom House

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Are you set up to work in Custom House, or is it a subcontractor?

Yes. Custom House is on the patch, and the postcodes we work here are E16. It is worked on our east London run, along with the rest of Newham. Bay bookings are usually an hour or two, which is fine for unloading and no use at all as a place to leave the van for a day. A bar fit runs longer than a worktop run, because the frame, the support and the stone are three stages and only the last of them is quick. Fitting a bar top is slower than carrying one. We come to the kitchen to template and again to fit, so there is nothing to visit and nothing to collect.

What should I expect from bar tops in a Custom House kitchen?

An inter-war terrace is wider than a Victorian one and shallower than a semi, so the kitchen is a compact square room rather than a galley. These bars nearly always land at the open end of a knocked-through kitchen and dining room, which means the piece is read from both sides and both sides get the same edge treatment rather than one being left as a cut face. A cellar bar is set to the headroom first. Where a breast interrupts a long wall the join can often go there, so it reads as a natural break rather than a line in the middle of a worktop. On a bar that counts twice over, because the same obstruction has to be cleared by the stone above it and by the knees of whoever is sitting at it. A bar top will not correct a frame that is out of true.

How would you get a worktop into a property in Custom House?

Even an easy kerbside carry wants the pavement clear at the tail lift, because a three-metre piece on edge has a swing radius nobody expects until it is swinging. The steel and the corbels travel that same route and go in first, so a bar is three separate carries into one room rather than a single delivery. A waterfall end travels as its own piece and is bonded in place. Underground loading has a height restriction, and a van with an A-frame on it is taller than the driver remembers. That has to cover more than the unload, since the corbels, the flat bar and the fixings all come off the van well before the top does. The frame is checked before anything comes off the van.

Do you get much bar tops work in Custom House?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop templating and worktop installation. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. A bar is nearly always the last thing added to a project, so it is templated on a visit of its own once the joinery around it has stopped moving. The brief changes, but the nose still has to be carried. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. Harder use and stronger cleaning products push the answer towards porcelain or sintered stone, because a resin-bound surface is the one that shows what has been left standing on it. Where the use is hard, the surface is chosen for it.

What moves the number on a quote around here?

Where the sink and the hob face each other across the aisle, everything carried between them crosses the walkway, and that is the one movement the shape cannot design out. A bar laid over that is a second level rather than a wider one, so it wants a spine underneath it and a settled detail where the two heights meet. The nose line is drawn first and everything works back from it. The material band is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What state does a Custom House kitchen have to be in before you template?

The returns into a breast recess are the tightest scribes in the room, and they are eased in rather than forced. A bar top is levelled to itself rather than to what it stands on, so the packing goes into the frame and the stools take up whatever the floor is doing. Fixings go into timber that was put there for them. Confirm the finished height you want and whether the bar is seen from both sides, and tell us who is building the frame and when it will be complete. Access is arranged through a managing agent or a scheme office rather than with the household directly, so a date gets confirmed once in writing and moving it costs a fortnight. A home bar is discretionary work, so the edge profile, the corbel detail and the radius on the nose are worth settling properly rather than defaulting to whatever is quickest. A bar in constant hands wants a finish that does not mark.

Do I have to get rid of the old tops myself in Custom House?

Taking the old tops off and disposing of them is its own line on the quote rather than something folded into the stone price. The carcasses stay put. Only the surface changes. Tiling bonded to the wall behind usually comes away with the old top, so that wall is agreed beforehand. Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. A trade bar is fitted around opening times, so the window the van has and the window the room has are rarely the same window. A red route buys minutes and a bar top needs hours.

Who decides where a join falls?

A join sits over a cabinet gable. It never spans a gap and never runs through a cut-out. A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. What you get is a line rather than a step, because the pieces are levelled to each other first. A run that stops in mid-air at the open end needs a finished end rather than a cut one, and that end takes the same edge work as the whole front. The seating side is the part that decides the piece, because a stool at the open end puts a load on a corner that a wall would otherwise have been carrying. A radius on a walked-past corner is agreed at drawing stage.

Will you fit stone onto units that are not level?

Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. If the carcasses are corrected, the template is taken again, since a drawing off units that then moved is worthless. Where a run meets an appliance, level decides whether that appliance door still clears the stone above it. An alcove is commonly wider at the back than at the front, so a piece cut to the opening drops in and then stands off the rear wall. Where the nose has to be carried past something fixed the support moves rather than the stone, since a corbel landing in the knee space is worse than no corbel at all. The knee space is measured before the bracket is specified.

Can the sink be undermounted rather than sat on top?

We seat and seal the sink and hob on the day; water, waste, gas and electrics are for your plumber and electrician. The sink, tap and hob have to be physically in the room at the template, not merely ordered, because the cut-out is machined to the item itself. A piece with a bowl and a hob cut into it is the fragile one, and it is handled accordingly. Where a run finishes hard against a wall the last few millimetres are scribed, and where it finishes in open floor it is cut square and polished, which is two different jobs on one length. A separate bar in the same room still takes its services from the same run, so the waste, the socket and the water are set out with the kitchen even though the joinery is not. One level or two, and it is decided early.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 on Google →
Absolutely delighted with our new worktop from Worktop WorX. The Capri White finish looks incredible, clean, modern, and really brightens up the whole kitchen while pairing beautifully with the darker cabinetry. The quality of the worktop is outstanding, with a flawless finish and seamless installation that really shows the attention to detail. It’s not only stylish but also feels incredibly durable and practical for everyday use. Cam handled everything from start to finish and made the whole process smooth and stress-free. Professional, reliable, and clearly takes pride in the work. Highly recommend Worktop WorX. We couldn’t be happier with the result!

Dawid Myszor

Google review · Capri White

Excellent service and top quality workmanship. The worktop looks absolutely amazing and the attention to detail is impressive. The team was professional, punctual, and very easy to work with. Highly recommended for anyone looking for a premium kitchen worktop! 👌

Costin Roman

Google review

Excellent service from start to finish. The team at Worktop Worx were professional, friendly, and really paid attention to detail. They listened to what I wanted, gave helpful advice, and delivered a high-quality finish. The worktop looks amazing and has completely transformed the space. Everything was completed on time and left clean and tidy. Highly recommended 5/5

Kam 98

Google review

Next step

Stone bar tops in Custom House, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489