Skip to content

Hounslow · TW13 TW14

Bathroom worktops and vanity tops in Feltham

Vanity tops, shelves and window returns cut from the same stone as a kitchen, in the narrower widths a bathroom actually takes.

  • 5.0from 26 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Feltham kitchens

The buildings and streets around Feltham

1930s semipostwar estate housetown-centre flat2010s infill development

Understanding bathroom worktop fitting in Feltham means understanding the kitchens it happens in, which is a more interesting subject than most people expect. Mostly unextended semis and postwar houses with straight galley runs of 3m to 3.5m. The work is replacement rather than remodel: laminate out, 20mm quartz in, undermount sink, same layout. The point of the visit is that you stop guessing and get a number you can hold us to.

The scullery and the kitchen were knocked into one at some point, and the stub of the old dividing wall is still there under the plaster. None of it changes the material, but it does decide whether the top comes out of offcut stock or wants a slab bought for it alone. The depth sets the piece, not the length of the wall.

The kitchen sits at the rear with a door to the garden and a window over the sink, so the useful run is broken into two short lengths. The original bathroom here is the small room over the hall, and a vanity in it is short, shallow and hard against two walls, so both ends are scribed. A separate WC becomes a cloakroom with a very small top.

On these streets the housing is 1930s semi, postwar estate house, town-centre flat and 2010s infill development. Each of those puts the services somewhere else, and the cut-outs follow.

True everywhere

Bathroom worktops and vanity tops, in short

  • Standard vanity depths are far narrower than a kitchen run, so most tops come out of offcut stock.
  • Undermount basins are bonded and the aperture is polished, because the cut edge is visible from above.
  • Tap holes are drilled to the tap you have actually bought, not to a standard spacing.
  • We seat and seal the basin. A plumber connects the water and waste.
Borough
Hounslow
Postcodes
TW13, TW14
Covered on
our west London run
Fitted
5–10 working days from template

The place

Why Feltham is its own job

What we want to establish about your kitchen in Feltham is how we get to it and what we will be fixing against. Easy. Off-street parking on most streets, very little controlled parking, and the A312 and A314 feed the area directly. High volume of straight swap-outs where the old laminate was hiding a badly out-of-level base run, so packing the units is genuinely half the install time. We would rather tell you about that before you pay a deposit than explain it afterwards.

The work

What bathroom worktops involves

Most vanity tops are cut from offcut stock, so the material line on a bathroom is usually a fraction of what the same colour costs by the slab. The vanity unit needs to be fixed, level and empty before the templater comes, because the top is drawn from the carcass rather than from the room. You end up with a bathroom surface in the same stone as the rest of the house, cut for the basin you chose rather than for a standard one.

A cloakroom top, an en-suite and a family bathroom are the same four operations at three different sizes. An undermount aperture is polished right round the cut edge, since you look straight down onto that edge every time the basin is used. Half tiling meets the splash return on a line that has to be agreed before machining, since a return cut short leaves a strip of bare wall showing. Cut to the fitted unit, not to the bathroom plan.

Polished stone edge profile close up
Edge profilesSee the options

The money

What it costs in Feltham

Where the colour you want is not sitting in offcut stock the job buys a slab and uses a fraction of it, and the quote says so plainly. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. Multiplying your worktop area by something between £110 and £550 gives you a material bill rather than a job cost, and the two are far enough apart to be worth keeping separate. A bathroom quote you can read without a calculator.

1930s and inter-war semis

The building, and what it does to the job

A junction between an original floor and a later extension slab is almost never at the same level, so units carrying a run across it need packing first. Bathrooms carry the same problems in a smaller room, and a smaller room leaves a vanity nowhere to absorb them. A boxed soil stack takes depth from where the basin wants it.

1930s and inter-war semis

What Feltham asks for

This is commercial work rather than something the housing here generates. Domestically these streets ask for worktop replacement, worktop installation and worktop templating. It runs through the same template, the same bench and the same fitters.

1930s and inter-war semis

Feltham in the housing figures

Across this patch the council tax banding sits at the bottom of the London range. The rooms therefore start closer to true than in most of London. Bathrooms repeated across a building are worth drawing together, since a shared slab is what makes them affordable. A modest bathroom earns the same drawing as a large one.

Access

Getting stone into a Feltham kitchen

Easy. Off-street parking on most streets, very little controlled parking, and the A312 and A314 feed the area directly.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted, working days from template. The same on this patch as every other.

west London patch

Feltham is covered on our west London run, along with the rest of Hounslow.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Feltham

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Feltham on your patch?

Yes. Feltham is on the patch, and the postcodes we work here are TW13, TW14. It is worked on our west London run, along with the rest of Hounslow. Gravel and block paving both look like hard standing and neither takes a loaded trolley, so the run from tail lift to door gets boarded. A vanity fit is a short visit with one or two pieces in it, so the van stands only for as long as it takes to walk them in. A bathroom return visit is planned around the street, not the diary. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

What is different about bathroom worktops in Feltham?

These were built in short runs of six or eight houses, so the party walls are solid brick and the rear elevation is a straight line with no outriggers. The original bathroom in these houses is the small room over the hall, and a vanity in it is short, shallow and hard against a wall at each end, so both ends are scribed and there is no tolerance left between them. Old pipework is boxed rather than moved, and the top notches round it. Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. A vanity has no depth to lose, so where a kitchen run would take a ten millimetre scribe without noticing, a shallow top cannot spare it. Wall-hung means the wall carries the basin, so the wall gets checked.

Is access a problem in Feltham?

The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. A vanity is the one piece of stone that route will not usually defeat, because a top cut to a standard unit depth weighs what one person can manage. Protection goes down the stairs as well as along the hall. A shared drive is only useful if the neighbour is not the one parked behind the van, so we ask which side the standing belongs to before the date is set. Where the van cannot wait, the top, the shelves and the adhesive all come in on the first trip and the van goes. Tap holes are drilled at the works, so nothing keeps the van waiting.

Is Feltham really a bathroom worktops area?

Not to any real extent, and it would be easy to imply it was. What the research on this patch actually lists is worktop replacement, worktop installation and worktop templating. It describes the kitchens on this patch, not the work that goes into them. Same quoting, same cutting, same fitting as anywhere else on the patch. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Work of that kind brings en-suites with it, and an en-suite vanity is a smaller piece again carrying exactly the same four operations. Batched vanity tops are templated in one visit. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Where several bathrooms are done in one building the tops come off one slab run, because two greys from two batches sit badly on adjoining floors. Two basins in one room is one piece, not two.

What makes one Feltham kitchen dearer than the next?

Where the sink and the hob face each other across the aisle, everything carried between them crosses the walkway, and that is the one movement the shape cannot design out. That shape decides what is left on the slab when the kitchen has been cut, and what is left on the slab is where most vanity tops come from. The bathroom pieces are labelled on the nest before the saw runs. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What holds a template up more often than anything else?

Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. The boxed soil stack in the corner is the usual version of it upstairs, and a top that notches round one loses depth exactly where the basin wanted it. The tile joint behind is what shows a top that is not level. Settle the tiling height and the basin model first, and let us know whether the unit is standing on the floor or hanging off the wall. The householder is normally on site at template, and that is the right time to settle sink position, tap centres and overhang rather than agree them by email. A let bathroom wants quartz for the same reason a let kitchen does: nothing to seal, and nothing an incoming tenant has to be briefed on. Wall-hung units suit a bathroom somebody else cleans.

How many visits does a Feltham worktop take?

The template is taken in your kitchen after the units are in and fixed, never before. Between the template and the fit the slab is nested, cut, mitred and dry-assembled on the bench, which is work you never see and is most of the wait. The same firm templates and fits. Nobody else is brought in to install. Internal walls are hollow clay block or stud rather than solid brick, so two points a metre apart on the same wall want two different fixings. What that does to a vanity is push the whole job into a narrow depth, because a bathroom takes the same stone as a kitchen in about two thirds of the width. The same stone as the kitchen, in a narrower cut.

Is taking the old top off part of the job?

On a replacement the old top comes off in the morning and the new stone is down and sealed the same day. Take the old tops off yourself if you would rather, and the quote simply carries one line fewer. The tap and waste have to be disconnected by a plumber before we start and reconnected once the stone is in. Drives with a dropped kerb and a tight turn-in take a long van at an angle, and that angle decides which side the tail lift can work from. A bathroom booked on its own rarely fills a day, so it can be put into whichever part of the day the street is easiest. The basin travels in the van with the top it belongs to.

Is a full-height stone splashback worth doing?

If it is a decision for later, say so at the template: the match is a question about the batch. Upstand or splashback, the stone is cut from the same slab run as the worktop, at the same time, so the batch actually matches. Tiling and stone can meet, but where they meet is decided before the template rather than after. The under-stair cupboard opens off the kitchen in most of them, and its door swing is the reason a corner run stops where it does. Half-tiled walls are the norm, and the tile line is what the splash return has to meet, which is a decision taken before machining rather than discovered afterwards. Square rooms make short work of a vanity template.

Can I buy the stone elsewhere and have you fit it?

Order is what matters: a slab is templated before it is cut, so an uncut slab is straightforward and one already machined for another kitchen is not. How much slab you hold matters: upstands and any remake have to come out of the same batch. Stone cut to somebody else’s drawing cannot usefully be re-cut to yours. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. A house divided into flats needs a vanity for each of them, and small repeated pieces are the one case where buying a whole slab makes sense. Loft rooms bring an en-suite and a very tight flight.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 on Google →
Karem did a fantastic job at installing my antique bronze mirror for my coffee/drinks unit. He was really professional and his communication throughout was clear.

Kals

Google review

We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10

j thomas

Google review

We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.

Han Lee

Google review · Arctic Starburst

Next step

Bathroom worktops and vanity tops in Feltham, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489