Skip to content

Richmond upon Thames · TW9

Worktop templating in Kew

A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Kew kitchens

What the kitchens here are actually like

Georgian house on the GreenVictorian terraceEdwardian terrace1930s semi

The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. The template records what the building actually did, not what the plan intended, and the gap between those two is what this visit is for. Sink, tap and hob on site, not on order.

Neat Victorian and Edwardian terraces where the standard project is a modest side-return infill giving a 3.2m run plus a 1.5m return, with a rooflight over the sink; kitchens stay lighter and smaller in scale here than in the big Sheen semis, and islands are the exception.

Conservation area covering most of the streets, so skips and scaffolding are consented and frontages are protected; parking is permit-controlled all day and the level crossing and one-way loops make the approach slow. Conservation rules keep the extensions narrow, so the run ends up long and thin - watch the overhang at the return where the wall kicks out.

The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. Victorian party walls and chimney-breast returns bow along their length, so the template plots the real line rather than assuming a straight one - the template picks up points every few hundred millimetres down the back of the run and the drawing carries that curve through to the saw. Recorded as it is, not as it was drawn.

The stock behind these kitchens runs to Georgian house on the Green, Victorian terrace, Edwardian terrace and 1930s semi. A quote that ignores which one you have is guessing.

True everywhere

Worktop templating, in short

  • Two to three hours on site for a typical kitchen.
  • Units must be fitted, fixed and level first. No stone is ever cut from a plan.
  • Sink, tap and hob must be physically on site, not just ordered.
  • A Belfast or butler sink must be installed and at its final height.

Covered on our south west London run. Fitted 3–7 working days from template.

period detached houses and villas

What gets asked for here

This is the job the local stock asks for first, ahead of worktop installation and worktop design & quotation.

period detached houses and villas

The shape of the run

On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. A layout templated off one wall instead of one datum will not sit right once all the pieces are down together. The drawing leaves site complete.

Access

Getting stone into a Kew kitchen

Conservation area covering most of the streets, so skips and scaffolding are consented and frontages are protected; parking is permit-controlled all day and the level crossing and one-way loops make the approach slow.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

south west London patch

Kew is covered on our south west London run, along with the rest of Richmond upon Thames.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop templating in Kew

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Kew?

Yes. Kew is on the patch, and the postcodes we work here are TW9. It is worked on our south west London run, along with the rest of Richmond upon Thames. Permit hours are what matters, not the permit itself, because a bay that frees up at six in the evening is no use for a template at ten. The templating visit needs somewhere to stop for two or three hours, which is a different problem from unloading for twenty minutes. It goes on the job sheet for the fitting crew. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Kew change how worktop templating works?

The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. Victorian party walls and chimney-breast returns bow along their length, so the template plots the real line rather than assuming a straight one - the template picks up points every few hundred millimetres down the back of the run and the drawing carries that curve through to the saw. Two to three hours, once the units are in. Conservation rules keep the extensions narrow, so the run ends up long and thin - watch the overhang at the return where the wall kicks out.

How does the stone actually reach a kitchen in Kew?

Conservation area covering most of the streets, so skips and scaffolding are consented and frontages are protected; parking is permit-controlled all day and the level crossing and one-way loops make the approach slow. Where the van stands level with the front of the house a piece gets handled twice instead of five times, and stone breaks on handling rather than on the road. The templater measures that route on the same visit, so the drawing leaves site already knowing the maximum piece. The template records it along with everything else.

Is Kew mostly worktop templating work for you?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop installation and worktop design & quotation. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Two to three hours on site, with the sink, tap and hob physically present. The room as it is, not as it was drawn.

Why do two Kew kitchens the same size price differently?

On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. Join positions and vein direction are marked on the template drawing before it leaves site. Real angles, not plan angles. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Sill height gets settled with the template on site, because it is one of the few dimensions nobody has measured before we arrive. The template plots it as it is, at the exact height the worktop will sit, and the drawing carries that through. Measured at worktop height, nowhere else. Units fixed and packed level over the sloping floor, walls replastered and dry at their final thickness (tiling and splashbacks go on after the worktop, never before), and the sink, tap and hob physically on site, with a Belfast sink built in and set at its finished height. A street with houses in single occupation next to the same houses cut into flats produces two completely different jobs from the same elevation. A template booked hopefully around another trade is the commonest cause of a wasted visit. No stone is cut from a plan.

Next step

Worktop templating in Kew, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489