
Greenwich · SE3 SE9
Bathroom worktops and vanity tops in Kidbrooke
Vanity tops, shelves and window returns cut from the same stone as a kitchen, in the narrower widths a bathroom actually takes.
- 5.0from 26 Google reviews
- 25-year material · 5-year workmanship
- Fitted 5-10 working days from template
Kidbrooke kitchens
The buildings and streets around Kidbrooke
Booking vanity tops in Kidbrooke without a site visit is how people end up with a worktop that fits the drawing and not the wall. Mostly new-build: apartments with an open-plan single run and island, and three-storey townhouses with the kitchen at ground level opening to a small garden. Developer worktops are thin composite or laminate, so the common job is upgrading to 20mm quartz without touching the units. None of that changes what you pay in Kidbrooke. The figure is set at template and it holds from there.
Underfloor heating in a screed rules out fixing into the floor and rules out standing anything heavy on a single point. For a vanity the length is rarely the argument, because it is the depth and what has to be drilled through it that set the piece. Bathrooms take the same slab and roughly half the width.
The party walls are new and built to current sound standards, so they are thick, true and take a fixing well. Bathrooms in these are square, plumb and finished before anyone moves in, so the template is short work and the whole question becomes what the unit is fixed to. The bathroom in a house like this is rarely where it started.
The housing behind these kitchens is 2010s-2020s Kidbrooke Village apartments, new-build townhouse, 1930s semi and postwar estate remnant. They are not interchangeable, and a worktop finds the differences quickly.
True everywhere
Bathroom worktops and vanity tops, in short
- Standard vanity depths are far narrower than a kitchen run, so most tops come out of offcut stock.
- Undermount basins are bonded and the aperture is polished, because the cut edge is visible from above.
- Tap holes are drilled to the tap you have actually bought, not to a standard spacing.
- We seat and seal the basin. A plumber connects the water and waste.
- Borough
- Greenwich
- Postcodes
- SE3, SE9
- Covered on
- our south east London run
- Fitted
- 5–10 working days from template
The place
Why Kidbrooke is its own job
Half of quoting a kitchen in Kidbrooke is understanding the approach to it, which is why the survey is done in person. New estate roads with controlled parking, marked loading bays, and blocks with lobbies and lifts rather than street doors; permits and delivery windows go through the estate office. Everything is square and level for once, so the risk sits in the developer's sink and hob cut-outs, not the walls. We template Kidbrooke kitchens after the units are in and levelled, which is the only point at which the real measurements exist.
The work
What bathroom worktops involves
An undermount basin is bonded from underneath and the cut edge of the aperture is polished, because that edge is in view every time the basin is used. Machining happens at the works: the aperture cut and polished, the holes drilled, the exposed edges profiled and the splash return cut to length. You are left with shelving and a window board that match the vanity, since all of it came off the same offcut on the same day.
A bathroom is one visit sitting between two plumbing visits, and the sequence matters at least as much as the stone does. We seat and seal the basin and leave the trap, waste and supply for the plumber to connect on a later visit. A stud wall wants timber behind the board before a wall-hung unit is fixed, and that is checked at template rather than on the day. Seated and sealed by us, connected by your plumber.

The money
What it costs in Kidbrooke
The material is usually the smallest line on a bathroom quote, since most vanity tops come out of offcut stock rather than a slab bought for them. Two facing runs mean two sets of edges and two scribes in a small span, which is why a compact galley rarely prices as cheaply as its area suggests. Colour and finish account for most of the distance between £110 and £550 per square metre. Everything decided after that is labour, and labour is quoted by the operation. The vanity is its own line, never folded into the kitchen.
Get it priced
new-build flats and apartments
Kidbrooke in the housing figures
Taken across Kidbrooke and the roads either side of it, a large share of the housing has gone up in the last fifteen years. An en-suite added to a bedroom is another vanity carrying the same work at a reduced size. The numbers describe the housing, not the basin in it.
new-build flats and apartments
What Kidbrooke asks for
This one sits outside the domestic mix entirely. That mix, locally, is worktop replacement, worktop templating and worktop splashbacks & upstands. Commercial pieces are drawn, cut and fitted exactly as a kitchen would be.
new-build flats and apartments
The carry, and what it rules out
A car ceiling at 2.2m sets the tallest thing that will stand in it, and the trap panel and light fitting take a slice off even that. What the route really decides for a bathroom is the shelving and the window board, since long thin pieces are the ones that break when they are twisted round a turn. Nothing is stood on edge once the tap holes are drilled.
Access
Getting stone into a Kidbrooke kitchen
New estate roads with controlled parking, marked loading bays, and blocks with lobbies and lifts rather than street doors; permits and delivery windows go through the estate office.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
5–10 working days
From template to fitted, working days from template. The same on this patch as every other.
south east London patch
Kidbrooke is covered on our south east London run, along with the rest of Greenwich.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Questions we get asked in Kidbrooke
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do your own fitters come out to Kidbrooke?
Yes. Kidbrooke is on the patch, and the postcodes we work here are SE3, SE9. It is worked on our south east London run, along with the rest of Greenwich. Where the bay sits some distance from the core, the carry across the car park is the longest leg of the day and gets boarded and lit. Where the van cannot wait, the top, the shelves and the adhesive all come in on the first trip and the van goes. We arrive with the offcut pieces already labelled by room. There is nothing to drive to and nothing to pick up, because both visits are to the property itself.
Does the housing in Kidbrooke change how bathroom worktops works?
Services were designed in rather than added later, so waste and feeds come up where the drawing put them and the sink is not moving. Partition walls are plasterboard on studs, and a wall-hung vanity carrying stone wants timber behind the board rather than fixings into plasterboard alone. Boarded floors give, and a vanity shows it at the tile line. Stud centres are almost never where the brackets would like to be, so fixing positions get set from the framing and the stone is designed to suit. Bathrooms carry the same problems in a smaller room, and a smaller room leaves a vanity nowhere to absorb them. The top follows the unit, and the unit follows a level.
How does the stone actually reach a kitchen in Kidbrooke?
A goods lift booked by the hour puts a clock on the whole delivery, so pieces go up in a planned order and nothing is handled twice. A vanity is the one piece of stone that route will not usually defeat, because a top cut to a standard unit depth weighs what one person can manage. A double vanity is a worktop as far as the carry is concerned. The goods lift has its own booking sheet, and a bay slot without a lift slot only gets the stone as far as the lobby. A bathroom booked on its own rarely fills a day, so it can be put into whichever part of the day the street is easiest. An en-suite and a family bathroom come off the same load.
Does Kidbrooke actually ask for bathroom worktops?
Honestly, no, though it would be easy to claim otherwise. What the research on this patch actually lists is worktop replacement, worktop templating and worktop splashbacks & upstands. That says something about the housing round here, not about the work. Quote, cut and fit are the same here as on any other part of the patch. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Work of that kind brings en-suites with it, and an en-suite vanity is a smaller piece again carrying exactly the same four operations. En-suites and family bathrooms rarely take the same depth. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. A house divided into flats needs a vanity for each of them, and small repeated pieces are the one case where buying a whole slab makes sense. Repeat work is where a vanity stops being an afterthought.
What am I actually paying for, line by line?
A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. A bathroom ordered with the kitchen is taken from the same slab run, so the two rooms match rather than nearly match. One slab run, so the bathroom matches the kitchen. Expect £110 to £550 per square metre for material supply only, with templating, fabrication and fitting on their own lines.
Is there anything I have to finish before the template in Kidbrooke?
A partition that gives when you lean on it will give under someone sitting at an overhang, and a bonded mitre nearby is where that movement shows first. A vanity has no depth to lose, so where a kitchen run would take a ten millimetre scribe without noticing, a shallow top cannot spare it. A shelf in a shower niche is scribed on three sides. Confirm the unit depth for each bathroom separately, book the lift if the building wants it booked, and have both taps on site. Whoever manages the block controls the lift booking, the bin store and the visitor parking, and none of that sits in the gift of the household whose kitchen it is. Who is paying decides the material here more than anywhere else, because a vanity is small enough that an expensive stone stops being an expensive decision. Durability wins in a let bathroom, and it should.
Can the sink be undermounted rather than sat on top?
A boiling tap needs a hole of its own and a cupboard below for the tank, so the units change too. Nothing is cut out in the kitchen. Cutting a bowl on site is how worktops get cracked. If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. The catch with a galley is that both runs are seen end-on from the doorway, so any difference in overhang between the two reads immediately. Where the kitchen swallows the whole slab there is no offcut worth having, and the vanity then has to be priced against material bought for itself. A narrow top nests into waste nobody else wants.
Does a stone worktop need sealing?
Quartz carries resin, so a hot pan wants a trivet, while granite and sintered stone will take one without complaint. Where a top takes wine, oil and lemon most days, the non-porous materials ask least of the household. Marble is the one people underestimate. It is porous, like granite, and wants sealing. An infill house is built to modern standards on an old plot, so the room is square even though the site around it is not. Bathrooms in these are square, plumb and finished before anyone moves in, so the template is short work and the question moves to what the unit is fixed to. A rear addition bathroom is cold, narrow and full of pipework.
Do most Kidbrooke kitchens take upstands or full-height splashbacks?
An upstand is a slim strip that follows the worktop up the wall; a full-height splashback runs from the worktop to the underside of the wall units. What decides between them is usually the wall: what it is built of, how flat it is, and where the sockets ended up. Access is a question about the plot rather than the house: a narrow frontage between older buildings with nowhere obvious to stand a van. Partition walls are plasterboard on studs, so a wall-hung unit wants timber behind the board, and that has to be there before the stone arrives rather than after. Older walls give a vanity nothing straight to sit against.
Do I have to get rid of the old tops myself in Kidbrooke?
The sink and hob are lifted out with the old top and kept aside if you are reusing them. Tiling bonded to the wall behind usually comes away with the old top, so that wall is agreed beforehand. Old tops are screwed or glued from underneath, so the drawer boxes come out before the worktop does. A bay shared across a parade of shops turns over all day, so the arrival time matters more than the length of the booking does. Where the vanity is fitted alongside a kitchen the van is standing anyway, which is a good part of why the two rooms are worth ordering together. No basin aperture is worth rushing for a parking bay.
Reviews
5.0 from 26 Google reviews
Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.
Excellent service from start to finish. The team at Worktop Worx were professional, friendly, and really paid attention to detail. They listened to what I wanted, gave helpful advice, and delivered a high-quality finish. The worktop looks amazing and has completely transformed the space. Everything was completed on time and left clean and tidy. Highly recommended 5/5
Kam 98
Google review
We recently had our kitchen worktops supplied and fitted by Worktop WorX using Laurent Gold sintered stone, and we couldn’t be happier with the result. The finish, quality, and attention to detail were outstanding from start to finish. Karem was incredibly helpful throughout the whole process professional, knowledgeable, and always available to answer any questions. The new worktops have completely transformed our kitchen and look amazing. Highly recommend Worktop WorX to anyone looking for high quality kitchen worktops, bespoke workmanship, and excellent customer service.
Gabriel Tivadar
Google review · Laurent Gold sintered stone
Kareem did the countertops dur8ng my kitchen remodel, and I was so impressed that I had him back to do the laundry room as well, which tells you everything you need to know. He is an absolute gem. Shows up when he says he will (which, let’s be honest, is rarer than it should be), does beautifully work, and clearly takes real pride in what he does. The countertops look fantastic, and he even went above and beyond, using leftover quartz to create an extra counter in my bathroom. Genius. He’s kind, professional, reasonably priced, and just gets on with it. No fuss, no drama, just a job very well done. I wouldn’t hesitate to recommend him and will absolutely be using him again if the need arises. Happy to answer any questions.
Susie Wiggins
Google review
Related
More around Kidbrooke
Other work we do in Kidbrooke
Next step
Bathroom worktops and vanity tops in Kidbrooke, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.