
City of Westminster · W2
Splashbacks and upstands in Paddington
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Paddington kitchens
What the kitchens here are actually like
The lift car, the loading bay and the building manager decide the piece sizes here, not the slab. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Siliconed to the top, never grouted.
Basin-side apartment blocks with developer kitchens - a 3m wall run in a matt finish plus a peninsula facing the living area, integrated appliances, and a stone-effect surface the second owner wants swapped for real quartz. Almost no layout changes, all like-for-like upgrades.
Concierge slots are short, so the whole slab set has to be on site in one movement - stage it kerbside first rather than making three trips to the van.
Boxed soil stacks and ventilation ducts run behind the units, and the boxing depth changes between floor level and worktop height. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant, but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. Decided before fabrication starts.
The mix here is 2000s canalside tower, 2010s Merchant Square apartment and Victorian terrace. A quote that ignores which one you have is guessing.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our central London run. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
What gets asked for here
This is not the local speciality and there is no point saying otherwise: worktop replacement, worktop installation and worktop templating is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.
Victorian and Edwardian terraces
Getting stone into the room
These towers run a full logistics process - book the loading bay off the estate road, a two-hour slot, ID and RAMS to concierge, protection in the lift, and no works outside 8am to 6pm weekdays. Some blocks require materials to go through a basement service corridor rather than the residential lobby.
Estate roads are often too tight for a long-wheelbase van to turn, so the carry starts a good deal further from the door than a map suggests. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.
Access
Getting stone into a Paddington kitchen
These towers run a full logistics process - book the loading bay off the estate road, a two-hour slot, ID and RAMS to concierge, protection in the lift, and no works outside 8am to 6pm weekdays. Some blocks require materials to go through a basement service corridor rather than the residential lobby.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
central London patch
Paddington is covered on our central London run, along with the rest of Westminster.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Paddington
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Paddington on your patch?
Yes. Paddington is on the patch, and the postcodes we work here are W2. It is worked on our central London run, along with the rest of Westminster. Bay bookings are usually an hour or two, which is fine for unloading and no use at all as a place to leave the van for a day. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. That is why they are crated the way they are. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop splashbacks & upstands in Paddington be any different from anywhere else?
Boxed soil stacks and ventilation ducts run behind the units, and the boxing depth changes between floor level and worktop height. Every socket, switch and any USB point has to be cut out of the stone to the actual measured position, so the template has to be taken with the faceplates off and the back boxes visible. The wall makes that decision, not the brochure. Concierge slots are short, so the whole slab set has to be on site in one movement - stage it kerbside first rather than making three trips to the van.
How would you get a worktop into a property in Paddington?
These towers run a full logistics process - book the loading bay off the estate road, a two-hour slot, ID and RAMS to concierge, protection in the lift, and no works outside 8am to 6pm weekdays. Some blocks require materials to go through a basement service corridor rather than the residential lobby. Estate roads are often too tight for a long-wheelbase van to turn, so the carry starts a good deal further from the door than a map suggests. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. Joint positions follow from that.
Do you get much worktop splashbacks & upstands work in Paddington?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop replacement, worktop installation and worktop templating. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Upgrading a builder-finish kitchen is mostly a swap, so the cost sits in the material choice rather than in the shape of the room. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Same batch, same run, same day. Handover-spec kitchens are square, plumb and predictable, which means the join count is honest and driven by run length rather than by the building. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Sockets final before template.
What moves the number on a quote around here?
Peninsulas frequently land on a lightweight partition or on units that were never fixed down, and stone needs proper support under it before it goes on. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Corners get their own pieces. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Paddington?
A lightweight stud partition will not carry a breakfast bar or a peninsula end, and stone finds that out faster than laminate ever did. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. An upstand rides what a panel exposes. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. Full-height panels need the wall made good first, which is another trade and another timescale. Decided before fabrication, not after.
Related
More around Paddington
Other work we do in Paddington
Next step
Splashbacks and upstands in Paddington, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.