
Hackney · EC2A E1 E2
Kitchen worktops in Shoreditch
Loft conversions with open-plan kitchens along a brick wall, 4m runs and large islands, sitting next door to Victorian estate flats with 2.4m galleys. The loft jobs are the ones that want a single stone across island, worktops and splashback with the veining matched across all three.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
The housing stock
What we are usually working with in Shoreditch
Loft conversions with open-plan kitchens along a brick wall, 4m runs and large islands, sitting next door to Victorian estate flats with 2.4m galleys. The loft jobs are the ones that want a single stone across island, worktops and splashback with the veining matched across all three.
Converted buildings often have a goods lift or a loading door, which is worth confirming because the industrial stairwells are steep and open. One-way streets, weekend closures, market traffic and loading bans through the day, with permit parking enforced seven days in places. Big island slabs live or die on the goods lift here, and if there is not one the island gets a mitred join and the client needs telling before anything is cut.
The stock behind these kitchens runs to warehouse conversion, Victorian model-dwelling estate, ex-local-authority block and new-build apartment. Which of those you have decides most of what follows.
Services coming up through a floor slab mean the island cannot move to suit the stone, so the stone is cut to suit the island. The workshop works to the template drawing and to the measured route, in that order. Joins over gables, always.
Original brickwork is uneven by ten millimetres or more across a bay, so the back edge is scribed to the actual face rather than to a line. A deep scribe comes out of the nest, so how uneven the wall is changes which part of the slab a piece is cut from. Settled on the drawing, cut once.
A car that takes 2.4m on the diagonal will not take a three-metre worktop however it is stood, and there is no trimming it on the landing. So the nesting is worked to the measured route first and to the slab second. The drawing carries that decision through to the saw.
A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Where the window is fixed there is no second day to fall back on, so the prep list matters more than usual. The prep list is not optional.
Access. One-way streets, weekend closures, market traffic and loading bans through the day, with permit parking enforced seven days in places. Converted buildings often have a goods lift or a loading door, which is worth confirming because the industrial stairwells are steep and open.
At a glance
- Borough
- Hackney
- Postcodes
- EC2A, E1, E2
- Covered on
- our east London run
- Lead time
- 3–7 working days from template
There is nothing to visit in Shoreditch. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Services
What we do in Shoreditch
Six services, ordered by what Shoreditch's housing stock actually asks for most.
Nearby
We also work around Shoreditch
Questions
Working in Shoreditch
Do you fit kitchen worktops in Shoreditch?
Yes. Loft conversions with open-plan kitchens along a brick wall, 4m runs and large islands, sitting next door to Victorian estate flats with 2.4m galleys. The loft jobs are the ones that want a single stone across island, worktops and splashback with the veining matched across all three. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. Where a bay suspension or a permit is needed, that is a real cost and it goes on the quote instead of appearing later. It is one line among the others, and it is honest.
What kind of kitchens do you usually work on in Shoreditch?
warehouse conversion, Victorian model-dwelling estate, ex-local-authority block and new-build apartment. Steel columns and downstands land where the frame put them, which is frequently in the middle of what would otherwise be a clean run. The kitchen is open plan and the island is often long enough to need a join, and it sits in the middle of the room where every edge is visible, so the join goes over a gable and usually under the hob line where the eye does not follow it. The bench proves it before the van moves.
Is access difficult in Shoreditch?
One-way streets, weekend closures, market traffic and loading bans through the day, with permit parking enforced seven days in places. Converted buildings often have a goods lift or a loading door, which is worth confirming because the industrial stairwells are steep and open. The lift has to be booked and blanketed before anything moves, and that booking needs to cover the old tops coming out as well as the new stone going in. Getting that wrong leaves a finished, machined piece that cannot reach the room, which is a remake rather than a trim. It is settled on the bench, not on site.
What do you get asked for most in Shoreditch?
Worktop fabrication, worktop installation and worktop design & quotation, in that order. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. The fitting day is scheduled to suit that rather than to suit the diary. One visit, done properly. Big island slabs live or die on the goods lift here, and if there is not one the island gets a mitred join and the client needs telling before anything is cut.
What decides the price of a worktop in Shoreditch?
An island is a single visible piece with four finished edges and no wall to hide against, so it is the piece the whole kitchen is judged on. A join that lands in the wrong place cannot be moved once the cut-outs are machined, so it is settled on the drawing. That is nested before any glass goes on the saw. An intruding steel column, a brick pier or a downstand breaks a run that would otherwise have been one clean piece. The template drawing carries the real geometry through to the saw, and the piece is machined to it rather than trimmed to it later. Radiused, polished, and clear of the joins. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.
Do you work in flats and leasehold properties in Shoreditch?
These kitchens tend to be compact and reasonably square, so the fixed template, fabrication and fitting lines are a larger share of the total than the stone is. A half-day of access is not a fitting day, and it is better to say so at booking than to find out at eleven. Protection goes down first. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.
Next step
Get your Shoreditch kitchen priced
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.