
Hackney · EC2A E1 E2
Worktop design and quotation in Shoreditch
Priced from your plans or the kitchen as it stands, with every cut-out, edge and join on its own line.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Shoreditch kitchens
What the kitchens here are actually like
Open plan means long uninterrupted runs and an island in the middle of the room with every edge on show. What that does to a quote is move the number away from square metreage and towards slab yield, join count and time on site. That is the whole of the pricing argument.
Loft conversions with open-plan kitchens along a brick wall, 4m runs and large islands, sitting next door to Victorian estate flats with 2.4m galleys. The loft jobs are the ones that want a single stone across island, worktops and splashback with the veining matched across all three.
Big island slabs live or die on the goods lift here, and if there is not one the island gets a mitred join and the client needs telling before anything is cut. One-way streets, weekend closures, market traffic and loading bans through the day, with permit parking enforced seven days in places. Converted buildings often have a goods lift or a loading door, which is worth confirming because the industrial stairwells are steep and open.
Poured screed over steel decking can fall away across a long run, so level is checked across the whole room before anything is packed. Long uninterrupted runs price well until a column or a deep scribe breaks one, and then the nest changes. That is what the itemised lines are for.
What turns up on the job sheets is warehouse conversion, Victorian model-dwelling estate, ex-local-authority block and new-build apartment. That mix is why two jobs on the same road can run completely differently.
True everywhere
Worktop design and quotation, in short
- Material is £110–£550/m² supply. That is the slab only.
- Templating, fabrication and fitting are quoted as their own lines.
- No installed price per square metre is published, because it is not a real number.
- Nothing is payable until we template.
Covered on our east London run. Fitted 3–7 working days from template.
warehouse and wharf conversions
Getting stone into the room
A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. Where a bay suspension or a permit is needed, that is a real cost and it goes on the quote instead of appearing later. You are told before you commit to a date.
warehouse and wharf conversions
What gets asked for here
It is on the shortlist for this patch rather than at the top of it, because worktop fabrication comes up more often. Nothing about the process differs between the two.
Access
Getting stone into a Shoreditch kitchen
One-way streets, weekend closures, market traffic and loading bans through the day, with permit parking enforced seven days in places. Converted buildings often have a goods lift or a loading door, which is worth confirming because the industrial stairwells are steep and open.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
east London patch
Shoreditch is covered on our east London run, along with the rest of Hackney.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop design & quotation in Shoreditch
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Shoreditch?
Yes. Shoreditch is on the patch, and the postcodes we work here are EC2A, E1, E2. It is worked on our east London run, along with the rest of Hackney. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. Tell us at enquiry stage and it is priced properly, because a crew stood waiting is the most expensive thing on any job. Nothing here is added after the fact. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Shoreditch change how worktop design & quotation works?
Original brickwork is uneven by ten millimetres or more across a bay, so the back edge is scribed to the actual face rather than to a line. The second driver is getting stone into the building: often a single goods lift, a long carry from the loading area, and occasionally a hoist through an opening, all of which sit in the fitting line as men and time rather than square metres. That is what the itemised lines are for. Big island slabs live or die on the goods lift here, and if there is not one the island gets a mitred join and the client needs telling before anything is cut.
How does the stone actually reach a kitchen in Shoreditch?
One-way streets, weekend closures, market traffic and loading bans through the day, with permit parking enforced seven days in places. Converted buildings often have a goods lift or a loading door, which is worth confirming because the industrial stairwells are steep and open. A car that takes 2.4m on the diagonal will not take a three-metre worktop however it is stood, and there is no trimming it on the landing. That is why the fitting line on a quote reflects manpower and time rather than square metres. It appears as its own line rather than buried in a rate.
Is worktop design & quotation common in Shoreditch?
It is one of the three we do most here, behind worktop fabrication. Same template visit, same workshop, same installers either way. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Everything is itemised: material, template, fabrication, fitting, each cut-out and each metre of upstand. Itemised, so it can be compared honestly. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Comparing quotes only works when they itemise the same things, and this is where the differences usually hide. Nothing payable until we template.
Why do two Shoreditch kitchens the same size price differently?
On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. It is the shape rather than the square metreage that moves the number, which is why two kitchens the same size quote differently. The join count is stated with its reason. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
An intruding steel column, a brick pier or a downstand breaks a run that would otherwise have been one clean piece. This is the item most often left out of a cheaper quote, and it comes back as a variation once the templater has been. Priced as fabrication, not as area. Send photos of the full route from where a van can park to the kitchen, including the goods lift and door widths, and tell us what the worktop is going back against. Managed stock usually comes with its own rules about working hours, waste, and who is allowed on site. Nothing is payable until we template, so a quote can sit while consents and decisions catch up. Written to be read by whoever is paying.
Related
More around Shoreditch
Other work we do in Shoreditch
Next step
Worktop design and quotation in Shoreditch, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.