
Bromley · BR2
Worktop replacement in Shortlands
Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Shortlands kitchens
What the kitchens here are actually like
A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. A single day, planned properly.
A lot of large period semis where the kitchen has been pushed out into a rear or side-return extension with bifolds, giving one long uninterrupted run and a small island or peninsula rather than a full one.
Where a slab has to be walked down a set of steep front steps we bring extra hands rather than trolley it, because a drop on a stone tread here is a broken piece every time. Ceramic Belfast sinks with undermount cut-outs come up regularly on the period side. The roads are hilly and narrow with parking on both sides, and several streets drop steeply from the road to the front door, so the carry is often downhill on wet steps rather than a flat approach.
The addition wall is half a brick thick in places and has usually had a damp course injected and been re-plastered, which leaves it neither flat nor consistent. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. Units kept, surface changed, one day.
On these streets the housing is Victorian villa, Edwardian semi, 1930s detached and 1960s low-rise flats. That mix is why two jobs on the same road can run completely differently.
True everywhere
Worktop replacement, in short
- The units stay. Only the surface changes.
- Old tops come out in the morning, new stone is down and sealed the same day.
- A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
- The carcasses have to be sound: stone is far heavier than laminate.
Covered on our south east London run. Fitted 3–7 working days from template.
period detached houses and villas
The building, and what it does to the job
Where a run finishes into a reveal, the depth of that reveal is taken at worktop height and nowhere else. We would rather find it at template than on the morning, which is why the templater looks behind the units. The laminate has been covering it up.
period detached houses and villas
What gets asked for here
Honestly, this is not what we do most on this patch. Worktop installation, worktop templating and worktop splashbacks & upstands come up more often. That is a statement about the local housing rather than about the work, and nothing about how it is quoted, cut or fitted changes because of it.
Access
Getting stone into a Shortlands kitchen
The roads are hilly and narrow with parking on both sides, and several streets drop steeply from the road to the front door, so the carry is often downhill on wet steps rather than a flat approach.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south east London patch
Shortlands is covered on our south east London run, along with the rest of Bromley.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop replacement in Shortlands
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Is Shortlands on your patch?
Yes. Shortlands is on the patch, and the postcodes we work here are BR2. It is worked on our south east London run, along with the rest of Bromley. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. Old tops out and new stone in, both through the same gap. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Why would worktop replacement in Shortlands be any different from anywhere else?
Where the side return has been filled in, the old external wall is now an internal one and still carries its render, its gutter line and its old fixings. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. Units kept, surface changed, one day. Where a slab has to be walked down a set of steep front steps we bring extra hands rather than trolley it, because a drop on a stone tread here is a broken piece every time.
How would you get a worktop into a property in Shortlands?
The roads are hilly and narrow with parking on both sides, and several streets drop steeply from the road to the front door, so the carry is often downhill on wet steps rather than a flat approach. A narrow entrance hall with a turn into the back of the house caps the longest piece we can physically get in, whatever the run itself measures. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The strip-out is planned around it.
Is Shortlands really a worktop replacement area?
Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop installation, worktop templating and worktop splashbacks & upstands. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Old tops out in the morning, new stone down and sealed the same afternoon. A day, not a project. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A day, not a project.
What moves the number on a quote around here?
If the island is a few hundred millimetres longer than the usable length of a slab, a second slab gets bought to gain that overhang, and the whole slab is paid for rather than the part used. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Carcasses have to be sound first. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What needs to be ready before you come to Shortlands?
Sill height gets settled with the template on site, because it is one of the few dimensions nobody has measured before we arrive. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Found at template, not on fit day. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. If the carcasses are tired the honest answer is that stone will find that out, and it is better said before than after. Units kept, surface changed.
Related
More around Shortlands
Other work we do in Shortlands
Next step
Worktop replacement in Shortlands, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.