Skip to content

Bromley · BR2

Worktop replacement in Hayes

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Hayes kitchens

What the kitchens here are actually like

1930s detached1950s detached1960s chalet bungalowpost-war semi

Blockwork with a hard render that has been patched over decades looks modern and behaves nothing like it. Taking the old tops off is also the first honest look at what has been going on underneath them. Sound carcasses are the one condition.

Mostly private inter-war and post-war detached with square kitchens rather than long thin ones, so the layout is usually three walls of units with a table in the middle, and clients converting to an island for the first time. Chalet bungalows near the common often have a low-ceilinged kitchen with a rear door that has to stay in place.

The square rooms here mean four separate pieces with three joints, so joint placement away from the hob cut-out matters more than in a galley.

Walls look modern and are not: block or breeze with a skim that has been patched over decades, so dry-laying and scribing still apply. Post-war terraces have small, roughly square kitchens with a back door and a window in the middle of the run, so runs are short and joins are rare, but there are usually two corners and a window cill to work around in a couple of metres. What is under the old top is the real question.

What turns up on the job sheets is 1930s detached, 1950s detached, 1960s chalet bungalow and post-war semi. The differences between them show up at template, not at enquiry.

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Old tops come out in the morning, new stone is down and sealed the same day.
  • A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
  • The carcasses have to be sound: stone is far heavier than laminate.

Covered on our south east London run. Fitted 3–7 working days from template.

period detached houses and villas

Getting stone into the room

Straightforward for the most part: driveways, dropped kerbs and side gates wide enough to take a slab round the back without going through the house.

period detached houses and villas

What gets asked for here

It is on the shortlist for this patch rather than at the top of it, because worktop design & quotation comes up more often. Nothing about the process differs between the two.

period detached houses and villas

The building, and what it does to the job

Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Found at template, not on fit day.

Access

Getting stone into a Hayes kitchen

Straightforward for the most part: driveways, dropped kerbs and side gates wide enough to take a slab round the back without going through the house.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

south east London patch

Hayes is covered on our south east London run, along with the rest of Bromley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop replacement in Hayes

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you actually work in Hayes, or just list it?

Yes. Hayes is on the patch, and the postcodes we work here are BR2. It is worked on our south east London run, along with the rest of Bromley. Gravel and block paving both look like hard standing and neither takes a loaded trolley, so the run from tail lift to door gets boarded. Waste is the part people forget: the old laminate or tired granite has to be walked back to the van and it does not get lighter. The waste run is planned, not improvised. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

What is different about worktop replacement in Hayes?

The square rooms here mean four separate pieces with three joints, so joint placement away from the hob cut-out matters more than in a galley.

Is access a problem in Hayes?

Straightforward for the most part: driveways, dropped kerbs and side gates wide enough to take a slab round the back without going through the house. A side gate and a back door mean the stone never goes through the house at all, which keeps the dust and most of the risk outside. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The strip-out is planned around it.

Is worktop replacement common in Hayes?

It is one of the three we do most here, behind worktop design & quotation. Same template visit, same workshop, same installers either way. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A day, not a project. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project.

What decides the price of a worktop in Hayes?

With three walls in play the chance of one of them being out of square is high, and the template has to carry all three angles. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. The units stay, the surface changes. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What do I need to sort out first?

Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Found at template, not on fit day. Empty the base units completely and have a plumber disconnect the sink, tap and any washing machine plumbed in under the worktop before we arrive. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. A replacement keeps the units and changes the surface, which is the least disruptive way to do this in an occupied property. Plumber either side of us.

Next step

Worktop replacement in Hayes, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489