Bromley · BR2

Splashbacks and upstands in Hayes

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Hayes kitchens

The kitchens we meet in Hayes

Splashback and upstand work in Hayes tends to go wrong in the planning rather than in the fitting, and planning it properly means starting from the building. Mostly private inter-war and post-war detached with square kitchens rather than long thin ones, so the layout is usually three walls of units with a table in the middle, and clients converting to an island for the first time. Chalet bungalows near the common often have a low-ceilinged kitchen with a rear door that has to stay in place. Plenty of kitchens do not match either description exactly, which is what the measured survey is there to sort out.

Plaster over blockwork is thin and hollow in patches, so anything fixed back to the wall needs a sound spot found first. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Window reveals decide where the run of stone stops.

Post-war terraces have a short straight hall to the kitchen, which is a good deal kinder than the houses they replaced. The upstand behind the sink is checked against the cill before it is cut, because the clearance is often less than a hundred millimetres. Decided before fabrication starts.

The housing behind these kitchens is 1930s detached, 1950s detached, 1960s chalet bungalow and post-war semi. They are not interchangeable, and a worktop finds the differences quickly.

Mitred waterfall edge detail on a quartz island
  • 1930s detached
  • 1950s detached
  • 1960s chalet bungalow
  • post-war semi

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The same fitters who install the worktop put the stone on the wall.
  • Wall pieces are priced by the square metre like everything else, from £110 upwards.
  • Edges are polished on every side that shows, including the top edge of an upstand.
Borough
Bromley
Postcodes
BR2
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why Hayes is its own job

The reason we ask so much before quoting in Hayes is that a worktop cannot be trimmed to fit a surprise. Straightforward for the most part: driveways, dropped kerbs and side gates wide enough to take a slab round the back without going through the house. The square rooms here mean four separate pieces with three joints, so joint placement away from the hob cut-out matters more than in a galley. We sort it out with a template, then the quote says what sorting it out costs.

The work

What worktop splashbacks & upstands involves

What these pieces do is protect the wall where water and heat land: behind the tap, behind the hob, and along the back edge where a cloth never quite reaches. Where a run is longer than one sheet will cover, the break is put on a vertical that has a reason to be there, and the two edges are cut as a pair so the seam closes without filler. You end up with the room finished. The wall was the last thing outstanding, so once these pieces are on there is nothing left waiting on another visit or another trade.

The survey for these pieces is a separate visit with a separate drawing, made after the tops are in and the room has stopped changing. Panels are offered up dry before any adhesive goes near them, and the scribe comes off the piece, never off the plaster. The back wall is commonly a single leaf with an air brick through it, and a tall sheet either takes the vent or stops below it. The panel clears the extractor before it is machined.

Waterfall ends See the options

The money

What it costs in Hayes

It is priced as its own item so you can see what removing the grout line actually costs before deciding. The middle run is usually the one that dictates the slab, and the two wings are worked around it. Thickness, finish and colour move a slab within the £110 to £550 supply band before anyone touches it, so that figure is settled by what you pick rather than by the room. Priced by the edge and the openings, not the wall.

period detached houses and villas

Hayes in the housing figures

In this corner of the borough, most homes are lived in by the people who own them. Corners tend to come in close to square. Whether it is stone or tile is usually a budget decision made by someone who will never see the room. Measured off the fitted top, not the drawing.

period detached houses and villas

The carry, and what it rules out

Where the garden is level and the back door is wide the pieces get staged outside on trestles and brought in one at a time as the fitters are ready for them. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. A door frame catches a tall panel long before a short one.

period detached houses and villas

What Hayes asks for

It would be overstating it to call this a speciality on this patch. Worktop installation and worktop replacement are far commoner. None of that changes the survey, the cut list or the fit.

Access

Getting stone into a Hayes kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

Hayes is covered on our south east London run, along with the rest of Bromley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Hayes

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Hayes, or is it a subcontractor?

Yes. Hayes is on the patch, and the postcodes we work here are BR2. It is worked on our south east London run, along with the rest of Bromley. Where the drive falls away from the house the trolley wants to run, and where it climbs the same load has to be pushed the whole way up. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. That is why they are crated the way they are. Template and fit both happen at the property, so there is nothing to drive to and nothing to collect.

02

What do the kitchens in Hayes do to worktop splashbacks & upstands?

Walls look modern and are not: block or breeze with a skim that has been patched over decades, so dry-laying and scribing still apply. Post-war terraces are typically blockwork or early lightweight block with a hard render coat, and the kitchen has usually been reconfigured at least once, leaving patched areas of newer plaster next to original render that sit at different depths. Height, returns and sockets, all settled on site. Casement handles and stays swing down into the space above the worktop, so the clearance that counts is the one measured with the window open. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. The reveal decides where the stone dies.

03

Do you have trouble getting long pieces into Hayes kitchens?

Grass and gravel will not take a loaded trolley, so a boarded track gets laid from the gate to the door before the first piece moves. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that. A visitor or a neighbour parked on the drive is a five-minute problem at eight in the morning and an hour-long one at eleven. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Long panels and long carries do not mix.

04

Does Hayes actually ask for worktop splashbacks & upstands?

Honestly, no, though it would be easy to claim otherwise. What the research on this patch actually lists is worktop installation and worktop replacement. That says something about the housing round here, not about the work. Quote, cut and fit are the same here as on any other part of the patch. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. The cheap way to make eight kitchens look specified. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Wipe-down beats sealed grout on a turnaround.

05

What decides the price of a worktop in Hayes?

The advantage of a U is that every join can be put over a gable in a corner, so nothing lands in the middle of a clear length. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Panel height is set by the extractor. Expect £110 to £550 per square metre for material supply only, with templating, fabrication and fitting on their own lines.

06

What do I need to sort out first?

A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. A bowed wall shows on a panel and hides under an upstand. Boiler position, flue and any pipework drops must be settled and the wall skimmed level before templating the splashback run. An owner paying for this directly tends to want the reasoning as much as the number, so a quote that explains why a join sits where it does is worth more than a cheaper one that does not. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Deferred is workable; undecided is not.

07

What happens if a piece is damaged on the fitting day?

Most breakages happen on the carry, which is why the route is walked and measured before anything comes off the van. Chips at an edge or a corner are the usual form, because that is where stone is least supported. A piece is never laid flat across a gap while it is moved, because that is how stone cracks unaided. A step up to a patio or a raised threshold at the back door means the piece is lifted rather than rolled, and that is where the crew size gets decided. Where the route is tight we break a long splashback at a natural vertical joint instead of forcing one panel through. It decides panel size before anything is cut.

08

Can the sink be undermounted rather than sat on top?

A piece with a bowl and a hob cut into it is the fragile one, and it is handled accordingly. Each cut-out is priced on its own line, so a range, a bowl and a half, a boiling tap and a drainer are four items rather than one. The short run at the head of a U usually sits under a window, so that piece is scribed on three sides at once and has nowhere left to be pushed back to. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Every internal corner is two pieces, not one.

09

Will you fit stone onto units that are not level?

The check comes before the measuring rather than after, because the whole drawing is set out from that plane. Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. An island is where this usually shows, standing free with no wall to level against. Window boards and cills stand proud of the plaster, so the back edge of the top has to be plotted to where the units actually sit rather than to the wall. It decides whether the run gets one continuous piece or a set of separate lengths with a joint at every obstruction. Mitred returns come from one place in the slab.

10

Is removal and disposal included on a Hayes job?

The sink and hob are lifted out with the old top and kept aside if you are reusing them. Taking the old tops off and disposing of them is its own line on the quote rather than something folded into the stone price. What changes is the surface. The carcasses underneath stay where they are. Where the front garden has been paved over completely the van stands close to the house, and the route in is still a standard front door. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Off the van last, and never in a hurry.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Perfect service,the best on this job”
Kleant IstrefiGoogle review
★★★★★
“I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work”
Alexandru BalintGoogle review
★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review

Next step

Splashbacks and upstands in Hayes, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.