Bromley · BR2
Kitchen worktops in Hayes
Mostly private inter-war and post-war detached with square kitchens rather than long thin ones, so the layout is usually three walls of units with a table in the middle, and clients converting to an island for the first time. Chalet bungalows near the common often have a low-ceilinged kitchen with a rear door that has to stay in place.
The housing stock
What we are usually working with in Hayes
Mostly private inter-war and post-war detached with square kitchens rather than long thin ones, so the layout is usually three walls of units with a table in the middle, and clients converting to an island for the first time. Chalet bungalows near the common often have a low-ceilinged kitchen with a rear door that has to stay in place.
The square rooms here mean four separate pieces with three joints, so joint placement away from the hob cut-out matters more than in a galley.
Straightforward for the most part: driveways, dropped kerbs and side gates wide enough to take a slab round the back without going through the house.
What we are usually templating in is 1930s detached, 1950s detached, 1960s chalet bungalow and post-war semi. The differences between them show up at template, not at enquiry.
Blockwork with a hard render that has been patched over decades looks modern and behaves nothing like it. Almost everything that makes a fitting day hard is a property of the building rather than of the stone. The route is walked before the first lift.
Post-war terraces have a short straight hall to the kitchen, which is a good deal kinder than the houses they replaced. The fitting itself is about squaring up to walls that look modern and are not: block or breeze walls with a skim that has been patched over decades, so we still dry-lay and scribe rather than trust the template edge. Walked, measured, protected, then lifted.
A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. The back edge is eased in progressively rather than offered up once and forced. Eased in, never forced.
A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The carcasses have to be sound, because stone is several times the weight of what is coming off. A plumber either side of us.
Access. Straightforward for the most part: driveways, dropped kerbs and side gates wide enough to take a slab round the back without going through the house.
At a glance
- Borough
- Bromley
- Postcodes
- BR2
- Covered from
- New Malden patch
- Lead time
- 3–7 working days from template
There is nothing to visit in Hayes. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.
Services
What we do in Hayes
Six services, ordered by what Hayes's housing stock actually asks for most.
Nearby
We also work around Hayes
Questions
Working in Hayes
Do you fit kitchen worktops in Hayes?
Yes. Mostly private inter-war and post-war detached with square kitchens rather than long thin ones, so the layout is usually three walls of units with a table in the middle, and clients converting to an island for the first time. Chalet bungalows near the common often have a low-ceilinged kitchen with a rear door that has to stay in place. A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. Tell us at enquiry stage and it is priced properly, because a crew stood waiting is the most expensive thing on any job. Nothing here is added after the fact.
What kind of kitchens do you usually work on in Hayes?
1930s detached, 1950s detached, 1960s chalet bungalow and post-war semi. Post-war terraces have a short straight hall to the kitchen, which is a good deal kinder than the houses they replaced. The fitting itself is about squaring up to walls that look modern and are not: block or breeze walls with a skim that has been patched over decades, so we still dry-lay and scribe rather than trust the template edge. Walked, measured, protected, then lifted.
Is access difficult in Hayes?
Straightforward for the most part: driveways, dropped kerbs and side gates wide enough to take a slab round the back without going through the house. Rear access usually lets us fit longer pieces whole, so the join count ends up decided by the slab rather than by the building. We walk the route with a tape and protect it end to end before the first piece is lifted. It gets checked before the first piece is lifted.
What do you get asked for most in Hayes?
Worktop design & quotation, worktop installation and worktop replacement, in that order. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The carcasses have to be sound, because stone is several times the weight of what is coming off. A plumber either side of us. The square rooms here mean four separate pieces with three joints, so joint placement away from the hob cut-out matters more than in a galley.
What decides the price of a worktop in Hayes?
A U shape uses more linear metres than people expect, and the two returns rarely nest together, so a second slab is a genuine possibility. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Nothing is bonded until the whole run sits flat. A low sill over the sink run is what decides between an upstand and stone dying into a window board, and there is often less clearance than an upstand is tall. The back edge is eased in progressively rather than offered up once and forced. Eased in, never forced. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.
Do you work in flats and leasehold properties in Hayes?
Owner-occupied kitchens are usually being done once, which is why the edge profile, the vein direction and where a join falls are worth the conversation. A plumber disconnects before we arrive and reconnects after we leave, and that is worth booking early. Units kept, surface changed. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.
Next step
Get your Hayes kitchen priced
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.