Skip to content

City of London · EC1A EC1M

Splashbacks and upstands in Smithfield

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Smithfield kitchens

What the kitchens here are actually like

warehouse and cold-store loft conversionGeorgian townhouse around the squareconverted meat trade buildingrecent apartment scheme

Exposed brick and steel is the whole job here, because neither of them presents a flat plane to scribe to. What decides between a slim upstand and full-height stone is nearly always the wall rather than the taste. Siliconed to the top, never grouted.

Loft conversions in former market and warehouse buildings give big open plans with island runs of 3-4m under high ceilings, often with exposed brick and cast-iron columns landing awkwardly close to the run. The Georgian houses around the square are the opposite - narrow, listed, with kitchens at basement or ground of 2.4-3m and floors that are anything but level.

Warehouse conversions frequently retain a wide goods lift or a loading door with a hoist beam, which if it is still usable is the easiest way to get a long piece up. The market end operates through the night and early morning with lorry movements and cleaning, so an early start clashes with trade rather than helping you, and mid-morning is the better window.

The goods lift is generous and the flat entrance often is not, so the tightest point on the route is inside the flat rather than in the building. Setting the panel proud on a subframe with a shadow gap reads as a detail; scribing to raw brick rarely does. Cut from the same slab run as the tops.

What we are usually templating in is warehouse and cold-store loft conversion, Georgian townhouse around the square, converted meat trade building and recent apartment scheme. The differences between them show up at template, not at enquiry.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our the City run. Fitted 3–7 working days from template.

warehouse and wharf conversions

The building, and what it does to the job

Cast-iron columns in these lofts are never quite where the drawing says, so scribe the island around the column rather than trusting a plan dimension.

warehouse and wharf conversions

What gets asked for here

This is not the local speciality and there is no point saying otherwise: worktop fabrication, worktop installation and worktop templating is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.

warehouse and wharf conversions

The shape of the run

If the island is a few hundred millimetres longer than the usable length of a slab, a second slab gets bought to gain that overhang, and the whole slab is paid for rather than the part used. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Corners get their own pieces.

Access

Getting stone into a Smithfield kitchen

The market end operates through the night and early morning with lorry movements and cleaning, so an early start clashes with trade rather than helping you, and mid-morning is the better window. Warehouse conversions frequently retain a wide goods lift or a loading door with a hoist beam, which if it is still usable is the easiest way to get a long piece up.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

the City patch

Smithfield is covered on our the City run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Smithfield

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Smithfield?

Yes. Smithfield is on the patch, and the postcodes we work here are EC1A, EC1M. It is worked on our the City run, along with the rest of the Square Mile. A free-parking street with cars both sides can still leave the van forty metres away, and that distance is carry, not driving. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Smithfield change how worktop splashbacks & upstands works?

Original brickwork is uneven by ten millimetres or more across a bay, so the back edge is scribed to the actual face rather than to a line. Exposed brick is the defining issue: the face is uneven by 10mm or more across a bay, so a stone splashback either scribes to it, which means the back of the panel has to be relieved, or it is deliberately set proud on a subframe with a shadow reveal all round. The wall makes that decision, not the brochure. Cast-iron columns in these lofts are never quite where the drawing says, so scribe the island around the column rather than trusting a plan dimension.

How does the stone actually reach a kitchen in Smithfield?

The market end operates through the night and early morning with lorry movements and cleaning, so an early start clashes with trade rather than helping you, and mid-morning is the better window. Warehouse conversions frequently retain a wide goods lift or a loading door with a hoist beam, which if it is still usable is the easiest way to get a long piece up. A car that takes 2.4m on the diagonal will not take a three-metre worktop however it is stood, and there is no trimming it on the landing. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.

Is Smithfield really a worktop splashbacks & upstands area?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop fabrication, worktop installation and worktop templating. That is a statement about the local housing rather than about the work. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day.

Why do two Smithfield kitchens the same size price differently?

On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

Where a column lands in the run the template plots its actual outline so the stone is cut to fit around it rather than stopped short and filled. Where the wall cannot be made good, setting the stone deliberately proud on a subframe with a shadow gap reads as a detail rather than a bad fit. An upstand rides what a panel exposes. Decide and build the backing method, scribe, subframe or board, before the template, because the templater is measuring to that face and not to the brick. Quartz is the sensible default in a rental: nothing to seal, nothing to maintain, and nothing an incoming tenant needs briefing on. Splashbacks are cut from the same slab run as the tops, so they have to be decided before fabrication, not after. The wall has to be ready.

Next step

Splashbacks and upstands in Smithfield, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489