
City of London · EC4M
Splashbacks and upstands in St Paul's
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
St Paul's kitchens
What the kitchens here are actually like
Plasterboard partitions mean light scribes and clean joins, and the fabrication effort moves to the visible faces instead. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. Same slab run, same day, same batch.
The handful of residential flats here sit above shops and offices in postwar and modern blocks, so kitchens are compact open-plan arrangements of 2.6-3.2m with an integrated appliance stack and no room for an island. Ceiling voids carry a lot of services, which means bulkheads over the run and wall cupboards that stop short - stone upstands and a full-height splashback fill the gap neatly.
Stepped and setted paving around the cathedral will jar a trolley badly, so carry the last stretch on a frame rather than wheeling it over the flags. The immediate cathedral surroundings are pedestrianised with bollards and stepped paving, so the van stops on a permitted street and the last 100m or more is on foot across paving that is unkind to a trolley. Service access to residential floors is usually shared with the commercial tenants and restricted to outside their delivery hours.
The room is genuinely square and the units are plumb, so the visit is more about the building than about the kitchen. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant, but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. The wall makes that decision, not the brochure.
What we are usually templating in is postwar reconstruction block with flats above, modern apartment over retail, 1960s-80s commercial building converted to residential and small conversion flat. Each of those behaves differently once the old top comes off.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our the City run. Fitted 3–7 working days from template.
post-war terraces and 1960s housing
What gets asked for here
This is one of the three jobs that come up most here, behind worktop replacement. It is the same template visit, the same workshop and the same installers either way.
post-war terraces and 1960s housing
Getting stone into the room
Where the frontage is a clearway the unload happens away from the door and the carry gets longer, which is a crew and time question rather than a stone one. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Handling is where these pieces get damaged.
Access
Getting stone into a St Paul's kitchen
The immediate cathedral surroundings are pedestrianised with bollards and stepped paving, so the van stops on a permitted street and the last 100m or more is on foot across paving that is unkind to a trolley. Service access to residential floors is usually shared with the commercial tenants and restricted to outside their delivery hours.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
the City patch
St Paul's is covered on our the City run, along with the rest of the Square Mile.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in St Paul's
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in St Paul's, or just list it?
Yes. St Paul's is on the patch, and the postcodes we work here are EC4M. It is worked on our the City run, along with the rest of the Square Mile. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop splashbacks & upstands in St Paul's?
The room is genuinely square and the units are plumb, so the visit is more about the building than about the kitchen. The plasterboard is genuinely flat here, so a full-height splashback sits well and a slim upstand looks almost redundant, but the sockets are the problem, because they are set out to the developer's original kitchen and often land at odd heights or right on a joint line. Cut from the same slab run as the tops. Stepped and setted paving around the cathedral will jar a trolley badly, so carry the last stretch on a frame rather than wheeling it over the flags.
Is access a problem in St Paul's?
The immediate cathedral surroundings are pedestrianised with bollards and stepped paving, so the van stops on a permitted street and the last 100m or more is on foot across paving that is unkind to a trolley. Service access to residential floors is usually shared with the commercial tenants and restricted to outside their delivery hours. Sign-in at the gate, a permit on the dash and a named contact are usually wanted before anything comes off the van. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. It decides panel size before anything is cut.
Is worktop splashbacks & upstands common in St Paul's?
It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Landlord work is scheduled around void periods, so the whole thing is a fixed window and the template date matters as much as the fitting date. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, same run, same day. Quartz suits let property well: no sealing, no annual maintenance, and nothing an incoming tenant has to be told to look after. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Siliconed to the worktop, never grouted.
What decides the price of a worktop in St Paul's?
Galley runs are usually short enough to come out of a single slab, so the material band you choose does more to the total than the room shape does. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Anything that has to stay accessible, a stopcock, a gas meter, a riser panel, is marked on the template so the stone is cut around it instead of over it. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Make the wall good first, or accept the detail. Any socket you intend to move must be moved and re-plastered before templating, because a cut-out in the wrong place means a new piece of stone. A let property is specified for durability and for a fixed window, and both of those are legitimate reasons to choose differently. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Same slab run as the tops.
Related
More around St Paul's
Other work we do in St Paul's
Next step
Splashbacks and upstands in St Paul's, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.