
City of London · EC2Y
Splashbacks and upstands in Barbican
Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Barbican kitchens
What the kitchens here are actually like
Blockwork with a hard render that has been patched over decades looks modern and behaves nothing like it. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Same slab run, same day, same batch.
Chamberlin Powell and Bon designed the kitchens as compact service rooms, so the standard flat has a galley of roughly 2.2-3m against one wall with a fixed extract duct and, in many types, a serving hatch to the dining area. Because the estate is listed the layout largely stays as built, so most work is replacing tired tops with new stone cut to the original footprint, sometimes squaring off where a hatch has been closed up. Do a full dry run of the route from car park lift to flat door before ordering, because the Barbican's walk-in is longer and more awkward than any staircase in the City. Lift cars in the residential cores are small with low ceilings, so anything over about 2.2m has to be assessed against the specific core before you cut.
Walls look modern and are not: block or breeze with a skim that has been patched over decades, so dry-laying and scribing still apply. That step is exactly what an upstand covers and what a full-height panel exposes, so unless the wall is skimmed level end to end, a 100mm band is the reliable choice. Cut from the same slab run as the tops.
The stock behind these kitchens runs to 1960s-70s Grade II listed concrete estate, terrace block flat, tower block flat and mews and podium-level maisonette. They are not interchangeable, and a worktop finds the differences quickly.
True everywhere
Splashbacks and upstands, in short
- Cut from the same slab run as the worktop, at the same time.
- Ordered later, from a different batch, the match is not reliable where the pieces meet.
- Socket and switch positions must be final before templating.
- The joint to the worktop is siliconed, never grouted.
Covered on our the City run. Fitted 3–7 working days from template.
ex-local-authority flats and estates
The shape of the run
Two parallel runs with a walkway between them is the most efficient shape there is on a slab, because both pieces nest as straight lengths with almost no waste. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. The joint to the worktop is siliconed, never grouted.
ex-local-authority flats and estates
What gets asked for here
It is on the shortlist for this patch rather than at the top of it, because worktop replacement comes up more often. Nothing about the process differs between the two.
ex-local-authority flats and estates
The building, and what it does to the job
Boxed soil stacks and ventilation ducts run behind the units, and the boxing depth changes between floor level and worktop height. Every socket, switch and any USB point has to be cut out of the stone to the actual measured position, so the template has to be taken with the faceplates off and the back boxes visible. Cut from the same slab run as the tops.
ex-local-authority flats and estates
Getting stone into the room
There is no vehicle access to the podium at all - you park in one of the estate car parks below, then use a car park lift and walk the highwalks and internal corridors, which can be several hundred metres with multiple fire doors and level changes.
Access
Getting stone into a Barbican kitchen
There is no vehicle access to the podium at all - you park in one of the estate car parks below, then use a car park lift and walk the highwalks and internal corridors, which can be several hundred metres with multiple fire doors and level changes. Lift cars in the residential cores are small with low ceilings, so anything over about 2.2m has to be assessed against the specific core before you cut.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
the City patch
Barbican is covered on our the City run, along with the rest of the Square Mile.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop splashbacks & upstands in Barbican
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you cover Barbican?
Yes. Barbican is on the patch, and the postcodes we work here are EC2Y. It is worked on our the City run, along with the rest of the Square Mile. A red route means no stopping, and no stopping means exactly that, so the stone comes in from a side street or from a bay behind the property. Upstands travel in a crate and can wait on the van, which gives some flexibility a full-height panel does not. Handling is where these pieces get damaged. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
Does the housing in Barbican change how worktop splashbacks & upstands works?
The window sits in the middle of the run over the sink, and its board and cill set the limit on how tall an upstand can be. Post-war terraces are typically blockwork or early lightweight block with a hard render coat, and the kitchen has usually been reconfigured at least once, leaving patched areas of newer plaster next to original render that sit at different depths. The wall makes that decision, not the brochure. Do a full dry run of the route from car park lift to flat door before ordering, because the Barbican's walk-in is longer and more awkward than any staircase in the City.
How does the stone actually reach a kitchen in Barbican?
There is no vehicle access to the podium at all - you park in one of the estate car parks below, then use a car park lift and walk the highwalks and internal corridors, which can be several hundred metres with multiple fire doors and level changes. Lift cars in the residential cores are small with low ceilings, so anything over about 2.2m has to be assessed against the specific core before you cut. Where the lift will not take the longest run we design a join in rather than gamble, because a piece that will not go up has to go back on the van. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. It decides panel size before anything is cut.
Do you do much worktop splashbacks & upstands around Barbican?
It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. A kitchen carved out of a larger room sits under whatever the original plan left behind, so the run frequently ends at a blocked doorway or a boxed-in service. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted. Conversions put kitchens where the services could be made to reach rather than where they belong, so runs are short and interrupted. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Same batch, same run, same day.
Why do two Barbican kitchens the same size price differently?
A galley puts the sink on one side and the hob on the other, which spreads the cut-outs across two pieces instead of weakening one. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What has to be finished before you can template?
Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. Make the wall good first, or accept the detail. Boiler position, flue and any pipework drops must be settled and the wall skimmed level before templating the splashback run. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. Full-height panels need the wall made good first, which is another trade and another timescale. Decided before fabrication, not after.
Related
More around Barbican
Other work we do in Barbican
Next step
Splashbacks and upstands in Barbican, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.