Skip to content

Lambeth · SW16

Restaurant and cafe table tops in Streatham

Table tops cut to your bases, with the edge profiled all the way round and the fixing centres drilled to the plate you already own.

  • 5.0from 26 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Streatham kitchens

The buildings and streets around Streatham

Edwardian terraceVictorian terraceAbove-shop flat1930s semiPostwar block

Over the years the table tops we have done in Streatham have followed a few recognisable patterns, and knowing which one you are in saves a great deal of argument later. Edwardian terraces off the high road take rear extensions of moderate depth, producing an L-shaped kitchen with a peninsula rather than the wide island layouts found further west. The long run of flats above the shops on the high road are single-galley kitchens where a top and upstands is the whole scope. Work out none of it yourself. Tell us the address in Streatham and roughly what you are replacing, and we will take it from there.

A boiler hangs on the wall above the run in most of these, and its pipework drops exactly where a splashback wants to go. What a table top needs from us is a size, a shape and the base plate it has to be drilled to, and very little else. No wall behind it, so nothing about it is hidden.

The stair from the street is narrow with a tight turn at the top, which caps piece length well below anything the run itself needs. Trade in this stock is a single shopfront with a small room behind it, so an order is a dozen pieces rather than fifty, and that changes what is worth doing rather than how it is done. A loading bay is the easiest delivery there is.

The houses and blocks behind these jobs are Edwardian terrace, Victorian terrace, Above-shop flat, 1930s semi and Postwar block. The run length that is easy in one is a join in another.

True everywhere

Restaurant and cafe table tops, in short

  • Every edge is profiled and polished, because every edge is visible and touchable.
  • Fixing centres are drilled to the base plate you already have, so bring us one or its drawing.
  • Thicker stone or a mitred edge reads as a heavier table without adding much weight to lift.
  • Round and oval tops are cut on the CNC, not by hand, so the curve is true all the way round.
Borough
Lambeth
Postcodes
SW16
Covered on
our south London run
Fitted
5–10 working days from template

The place

Why Streatham is its own job

What we want to establish about your kitchen in Streatham is how we get to it and what we will be fixing against. The high road is a red route with bus lanes and constant traffic, and above-shop flats are reached through a shared door and a straight steep stair with no landing to rest on. Residential side streets are permit-controlled but usually workable outside peak hours. Above-shop kitchens here sit on old timber floors that slope towards the front of the building, so level off the units and pack rather than following the floor. The template is where the room stops being a drawing and starts being measurements, and the price follows the measurements.

The work

What restaurant table tops involves

Outdoor covers are quoted separately from indoor ones, because a resin-based surface fades in direct sun where granite, porcelain and sintered stone do not. Delivery is timed around service. The pieces arrive on edge in a frame, get checked off against the plan, and go onto their bases in the order the room fills. You end up with a written record of the batch, so an extra six tops next year are ordered against a reference rather than against somebody’s memory.

The work is a batch: a dining room orders tops by the dozen, and they have to come off the same run of slab to match each other. Fixing holes are drilled blind from the underside to a stopped depth, so nothing breaks through onto the face. Stone comes in through the front past whatever is already laid up, so it arrives wrapped and stays wrapped until the base is standing. Cut round on the machine, true the whole way.

Mitred waterfall edge detail on a quartz island
Waterfall endsSee the options

The money

What it costs in Streatham

Buying the room as one batch is cheaper than buying it twice, because a slab is committed once and its offcuts work for the whole order. One continuous L takes more slab than its metreage implies, because the waste sits inside the angle. The stone itself is £110 to £550 per square metre supply only; everything done to it is priced separately and shown separately. Priced by the top, and the count is on the quote.

Victorian and Edwardian terraces

The carry, and what it rules out

Open-tread and cantilevered stairs give nothing to lean a piece against, so the whole weight stays on the crew for the full length of the flight. Where the way in is awkward the order is delivered against the seating plan, room by room, rather than tipped into the dining room in one go. A stack of tops is a weight before it is a delivery.

A single red line has hours and a double red line does not, and the difference decides whether an early start is a plan or a penalty. A long push from wherever the van ends up standing is planned into the delivery, since a loaded frame does not cross block paving on its own. The bases are the heavy pallet, not the tops.

Victorian and Edwardian terraces

What Streatham asks for

Commercial rather than residential, and priced from the drawing rather than from the housing type. Residentially, worktop replacement, worktop splashbacks & upstands and worktop installation is what comes up here. The fabrication is identical.

Access

Getting stone into a Streatham kitchen

The high road is a red route with bus lanes and constant traffic, and above-shop flats are reached through a shared door and a straight steep stair with no landing to rest on. Residential side streets are permit-controlled but usually workable outside peak hours.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted, working days from template. The same on this patch as every other.

south London patch

Streatham is covered on our south London run, along with the rest of Lambeth.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Streatham

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Streatham?

Yes. Streatham is on the patch, and the postcodes we work here are SW16. It is worked on our south London run, along with the rest of Lambeth. Where a marked loading box sits on the red route the stop is legal but timed, so the unload runs as one movement with every hand on it. A table order comes off the van as a stack of frames and a pallet of bases, and both of those need somewhere to stand before either is moved. Somewhere to stand the frames matters more than the distance. There is nothing to drive to and nothing to pick up, because both visits are to the property itself.

Does the housing in Streatham change how restaurant table tops works?

The structure below is commercial, so the floor is often timber over a shop ceiling and the load path under an island is worth thinking about. A whole slab still gets reserved, because a dozen matching tops is the entire point of ordering them together. The room is handed back laid up, whatever the building. Legs bottoming out on hard concrete or an uneven screed mean the tops of the carcasses are not one plane, and that is picked up at template rather than on fitting day. None of that is scribed against on a table, since it stands clear of every wall, so the awkwardness moves from the back edge to the floor and the base. What the room does to the base matters more than the wall.

How does the stone actually reach a kitchen in Streatham?

A handrail that has to come off before a piece will pass is twenty minutes at the start of the day, and it goes back on the wall before we leave. A table order is many small pieces rather than one long one, so the route decides how many trips the delivery takes rather than how big anything can be. Battens under anything that has to wait. A bus lane along the frontage brings its own hours with it, and stopping in one is enforced the same way the red route is. The bases are the heavy half of the delivery, so the pallet is dealt with first while there are still hands free for it. A clock on the kerb changes the order of unloading.

Would you call Streatham a restaurant table tops area?

Not particularly. It would be easy to say yes and leave it there. What the research on this patch actually lists is worktop replacement, worktop splashbacks & upstands and worktop installation. That is about what people have here rather than how it gets done. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. An open-plan extension puts the worktop in the middle of the living space, so it is looked at from the sofa as well as worked on. Table work arrives as a batch by its nature, and a batch means one slab run rather than the same colour ordered twice a year apart. Orders are counted in pieces and never in metres. Extension budgets are usually well spent by the time the worktop is ordered, which is where the choice between quartz and a thinner sintered stone actually gets made. Where an operator changes hands the bases usually stay, so a refit becomes a resurface and the saving comes from what is already bolted down. Ordered as a set, so the set matches.

What am I actually paying for, line by line?

Corner sinks and corner hobs sit exactly where the joint wants to be, so on an L the cut-out positions get settled before the join positions do. A table top answers to none of that, since it meets no wall and needs no scribe, but the pieces come off the same slab as the counter and the colour has to carry across both. A set is laid out together before anything is wrapped. Expect £110 to £550 per square metre for material supply only, with templating, fabrication and fitting on their own lines.

Is there anything I have to finish before the template in Streatham?

Level has to hold across the whole room rather than along one wall, or a floor that falls end to end shows as a step where two pieces meet. A column, a boxed duct or a fixed bench in a dining room is designed around with a shape cut to suit rather than notched on site. A thin top over a wide plate wants a pad underneath. Bring in one base, or send the maker’s plate drawing, and tell us the table count including any spares you want to hold back. Some doors in a building need a consent letter and some need nothing at all, so the first question is which arrangement applies here rather than which one is usual. A table top bolted to a base you already own is loose furniture rather than a fixture, so it leaves with the operator at the end of a term. A short term does not justify a surface that fails early.

What happens if my units are not level?

Stone does not flex, so a run that rocks on its carcasses rocks just as badly once it is stone. Variation past what packing can take up has to be corrected in the carcasses before we cut, because the template records the units as they stand. An island is where this usually shows, standing free with no wall to level against. A floor that falls across the depth of a run rather than along it tips the carcasses front to back, and packing the front feet changes the overhang while it fixes the level. Where a floor falls away, the levelling is done by winding out the feet under each base rather than by packing anything under the stone. Uneven flags outside are why outdoor feet adjust.

Are drainer grooves cut on site or in the workshop?

Grooves and an undermounted bowl are usually specified together, since the grooves are run to the bowl edge. A groove set is its own item on the quote rather than something rolled in with the sink cut-out. They are cut with a fall towards the bowl, which is why they cannot be added on site later. Doorways are 762mm at best, and the turn from the hall into the kitchen is the pinch point rather than the front door. Table tops sit outside all of that, because a top touches no wall at all and every one of its edges is profiled, polished and on show. The base plate settles the drilling before the stone is cut.

Do the template and the fit happen on the same visit?

Between the template and the fit the slab is nested, cut, mitred and dry-assembled on the bench, which is work you never see and is most of the wait. A template on a normal kitchen takes two to three hours in the room. Nothing is payable in advance of the template. Plaster over blockwork is thin and hollow in patches, so anything fixed back to the wall needs a sound spot found first. A dining room orders tops in sets, so the question is never one piece but twenty that have to read as one colour. Twenty tops that match, not twenty that nearly do.

Can the sink be undermounted rather than sat on top?

The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. If the sink or hob changes after the template, the drawing changes first and nothing is cut meanwhile. Two bowls means two cut-outs and a bridge of stone between them, which decides where the sink can go. One leg of an L is nearly always the working run and the other little more than a landing space, but both are templated, cut and edged to the same standard. What decides the cut list here is the seating plan rather than the room shape, and one repeated table size nests far better than six one-offs. Two-seaters and four-seaters come off one slab run.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 on Google →
We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10

j thomas

Google review

We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.

Han Lee

Google review · Arctic Starburst

Great work, super helpful team. I'd definitely recommend!

Andreea Tanase

Google review

Next step

Restaurant and cafe table tops in Streatham, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489