
Merton · SW19
Worktop replacement in Wimbledon
Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.
- 5.0from 23 Google reviews
- 25-year material · 5-year workmanship
- Fitted 3-7 working days from template
Wimbledon kitchens
What the kitchens here are actually like
Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. Old top out in the morning, new stone down and sealed the same afternoon, with a plumber either side of us. A single day, planned properly.
Around the Broadway and the streets running up towards the Ridgway you get Victorian and Edwardian houses where the original back addition has been opened into the rear reception, so the kitchen ends up L-shaped with a run down the flank wall and a peninsula where the old wall stood.
The town centre one-way system and the bus lanes on the Broadway leave almost no legal standing time, and the residential streets either side are permit-only with short single-yellow windows. Newer apartment blocks above the town centre are mostly straight galley runs with a breakfast bar returning off the end.
A bay-fronted terrace has a long hall running past the stairs to the kitchen, so the hall turn caps the piece length before the run length does. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. What is under the old top is the real question.
The stock behind these kitchens runs to Late Victorian terrace, Edwardian semi, 1930s mansion block and 2000s town-centre apartment. A quote that ignores which one you have is guessing.
True everywhere
Worktop replacement, in short
- The units stay. Only the surface changes.
- Old tops come out in the morning, new stone is down and sealed the same day.
- A plumber disconnects the tap and waste before we arrive and reconnects at the end of the day.
- The carcasses have to be sound: stone is far heavier than laminate.
Covered on our south west London run. Fitted 3–7 working days from template.
Victorian and Edwardian terraces
The building, and what it does to the job
The knock-through peninsula is where the money and the risk sit, you are butting new stone against a wall the builder made good after removing a chimney breast, so template after plastering, never before.
Victorian and Edwardian terraces
Getting stone into the room
Anything going into a flat above the shops is a stair-only carry from a shared street door.
Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. It sets what the day actually looks like.
Victorian and Edwardian terraces
What gets asked for here
The research on this patch puts this at the top of the list, above worktop templating and worktop installation.
Access
Getting stone into a Wimbledon kitchen
The town centre one-way system and the bus lanes on the Broadway leave almost no legal standing time, and the residential streets either side are permit-only with short single-yellow windows. Anything going into a flat above the shops is a stair-only carry from a shared street door.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
south west London patch
Wimbledon is covered on our south west London run, along with the rest of Merton.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop replacement in Wimbledon
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Wimbledon, or just list it?
Yes. Wimbledon is on the patch, and the postcodes we work here are SW19. It is worked on our south west London run, along with the rest of Merton. Loading exemptions on red routes are narrow, time-limited and heavily camera-enforced, so we plan around them rather than relying on them. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The waste run is planned, not improvised. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop replacement in Wimbledon?
The rear wall is usually a single brick thick and has been rendered, patched and re-rendered, so it bows in and out along the length of the run. What the old top has been hiding is usually a floor that settled towards the back and units that were never fixed back to the wall. Units kept, surface changed, one day. The knock-through peninsula is where the money and the risk sit, you are butting new stone against a wall the builder made good after removing a chimney breast, so template after plastering, never before.
Is access a problem in Wimbledon?
The town centre one-way system and the bus lanes on the Broadway leave almost no legal standing time, and the residential streets either side are permit-only with short single-yellow windows. Anything going into a flat above the shops is a stair-only carry from a shared street door. Communal stairs get boarded and the handrail padded, and we walk the route with a tape before the first piece leaves the van. We plan the strip-out and the carry as one movement so the kitchen is only out of use for a single day. It sets what the day actually looks like.
Is Wimbledon mostly worktop replacement work for you?
Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop templating and worktop installation. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A day, not a project. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The carcasses have to be sound, because stone is several times the weight of what is coming off. A day, not a project.
What decides the price of a worktop in Wimbledon?
The free end is what needs deciding early: square edge, mitred apron down the end, or a full waterfall to the floor, and a waterfall is cut in sequence off the same part of the slab. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Carcasses have to be sound first. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
Where a breast interrupts a long wall the join can often go there, so it reads as a natural break rather than a line in the middle of a worktop. We would rather find it at template than on the morning, which is why the templater looks behind the units. The laminate has been covering it up. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. A plumber disconnects before we arrive and reconnects after we leave, and that is worth booking early. Units kept, surface changed.
Related
More around Wimbledon
Other work we do in Wimbledon
Next step
Worktop replacement in Wimbledon, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.