Skip to content

Hammersmith and Fulham · W12

Splashbacks and upstands in Wormholt

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 5.0from 23 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 3-7 working days from template

Wormholt kitchens

What the kitchens here are actually like

1920s cottage estate houseinterwar municipal terracepostwar infill flatshousing association maisonette

Kitchens in this stock are compact and reasonably square, which makes the fixed lines a larger share of the total than the material is. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. The wall decides, not the brochure.

The interwar cottage estate houses were built with a small dedicated kitchen at the rear, roughly 2.4m by 2m, with a larder and a back door onto the garden, and many still have that footprint. Where a rear extension has been added the kitchen becomes an L of about 3m by 2m, but the original external wall usually stays as a nib, which forces a joint or a mitre at the corner.

The retained nib of the old back wall is where these kitchens want a mitre, and getting that internal corner tight is what the job is judged on.

Walls are dense block or in-situ concrete with a bonded plaster, so the bottom course of tiles brings plaster with it when the old top comes off. That suits a full-height piece, because a large flat panel bonded across its back is more stable on concrete than a run of small tiles ever was. Cut from the same slab run as the tops.

The mix here is 1920s cottage estate house, interwar municipal terrace, postwar infill flats and housing association maisonette. Which of those you have decides most of what follows.

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • Ordered later, from a different batch, the match is not reliable where the pieces meet.
  • Socket and switch positions must be final before templating.
  • The joint to the worktop is siliconed, never grouted.

Covered on our west London run. Fitted 3–7 working days from template.

ex-local-authority flats and estates

The shape of the run

An L can be mitred at the corner for a continuous look or butt-jointed over the gable, and the two are different money and different risk. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. Joint placement is a decision, not an accident.

ex-local-authority flats and estates

What gets asked for here

This is one of the three jobs that come up most here, behind worktop replacement. It is the same template visit, the same workshop and the same installers either way.

ex-local-authority flats and estates

Getting stone into the room

Estate layout with front gardens, low walls and gates, and reasonably wide streets, so vehicle access is easier than most of W12 - the constraint is the narrow original front door and a hall barely 900mm wide. Some properties still have the original side alley to the garden, which is the better route if the gate can come off its hinges.

Access

Getting stone into a Wormholt kitchen

Estate layout with front gardens, low walls and gates, and reasonably wide streets, so vehicle access is easier than most of W12 - the constraint is the narrow original front door and a hall barely 900mm wide. Some properties still have the original side alley to the garden, which is the better route if the gate can come off its hinges.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

west London patch

Wormholt is covered on our west London run, along with the rest of Hammersmith and Fulham.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop splashbacks & upstands in Wormholt

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Is Wormholt on your patch?

Yes. Wormholt is on the patch, and the postcodes we work here are W12. It is worked on our west London run, along with the rest of Hammersmith and Fulham. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. One trip is always better than three. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Why would worktop splashbacks & upstands in Wormholt be any different from anywhere else?

Many have been extended at the rear since being sold, so the kitchen is half original and half newer with a floor junction between the two. The rear kitchen wall in ex-council flats and maisonettes is commonly dense in-situ concrete or blockwork with a thin skim, which means mechanical fixings are hard work and the splashback is held on adhesive rather than screwed. Decided before fabrication starts. The retained nib of the old back wall is where these kitchens want a mitre, and getting that internal corner tight is what the job is judged on.

How would you get a worktop into a property in Wormholt?

Estate layout with front gardens, low walls and gates, and reasonably wide streets, so vehicle access is easier than most of W12 - the constraint is the narrow original front door and a hall barely 900mm wide. Some properties still have the original side alley to the garden, which is the better route if the gate can come off its hinges. A side gate and a back door mean the stone never goes through the house at all, which keeps the dust and most of the risk outside. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Joint positions follow from that.

Do you do much worktop splashbacks & upstands around Wormholt?

It is one of the three we do most here, behind worktop replacement. Same template visit, same workshop, same installers either way. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Ordered later from a different batch, the match is not reliable exactly where the pieces meet. Sockets final before template. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Siliconed to the worktop, never grouted.

What moves the number on a quote around here?

Where the return runs into a wall that is out of square, the corner is templated as the angle it really is rather than as ninety degrees. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Joint placement is a decision, not an accident. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What needs to be ready before you come to Wormholt?

Floors settle, and once base units are packed and levelled properly the stone sits true while everything else in the room admits it is not. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Scribed, dubbed out, or set proud. Pick one. Any surface trunking or conduit has to be rerouted or accepted and boxed before templating, because the stone cannot be scribed around a live conduit on site. Consent for the work sits with the freeholder or the managing body, and getting it in writing first avoids a crew arriving to a locked door. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. Same slab run as the tops.

Next step

Splashbacks and upstands in Wormholt, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489