Clapham Junction kitchens
The kitchens we meet in Clapham Junction
Worktop installation in Clapham Junction tends to go wrong in the planning rather than in the fitting, and planning it properly means starting from the building. Flats over the shops on the main roads have tight galley kitchens of 2m to 2.4m with the appliances stacked, while the terraces climbing St John's Hill get rear kitchen-diners with a peninsula. Regeneration blocks near the station are modern carcass kitchens with straight runs. Nothing gets cut from a description. It gets cut from a template taken off the units once they are in.
A stub wall divides the kitchen from the back lobby, and it rarely stayed where the original drawing put it. Levelling is done under the units and not under the stone, so anything out is corrected before a piece is lifted in. A settled floor adds an hour and the day allows for it.
Working hours are constrained by the business underneath, so noisy work has a window rather than a day. Dry-laying comes first even where the walls look modern, because a skim patched over decades is not a straight line. Where the wall bellies, the top is eased in against it.
Around here the stock is Victorian terrace, Above-shop flat, Postwar estate block and 2010s regeneration apartment. They fail in different places, which is why the survey looks at different things.