Skip to content

Croydon · CR0

Worktop templating in Shirley

A digital template plotting the room as it really is, taken once your units are fitted, fixed and level.

Shirley kitchens

What the kitchens here are actually like

1930s semi1950s detached1960s detachedchalet bungalow

Solid brick with a sand and cement render is firm to work against and reliably out of plumb across the length of a run. No stone is ever cut from a plan, which is why the visit happens after the units are in and not before. Units fitted, fixed and level first.

Larger suburban plots with deep gardens, so rear extensions here go out 4m or more and the finished kitchen usually has an island plus a run of tall units. Chalet bungalows near Shirley Hills have wide, low kitchens where wall cupboards are limited by the eaves.

Wide doorways and level thresholds mean full-length pieces go in whole and the join count comes down to slab length alone. The sill height over the sink is settled on site, because there is often less clearance than an upstand is tall. No stone is ever cut from a plan.

What turns up on the job sheets is 1930s semi, 1950s detached, 1960s detached and chalet bungalow. Each of those behaves differently once the old top comes off.

True everywhere

Worktop templating, in short

  • Two to three hours on site for a typical kitchen.
  • Units must be fitted, fixed and level first. No stone is ever cut from a plan.
  • Sink, tap and hob must be physically on site, not just ordered.
  • A Belfast or butler sink must be installed and at its final height.

Covered from the New Malden patch. Fitted 3–7 working days from template.

1930s and inter-war semis

What gets asked for here

It is on the shortlist for this patch rather than at the top of it, because worktop design & quotation comes up more often. Nothing about the process differs between the two.

1930s and inter-war semis

The building, and what it does to the job

Where we can get through the side gate straight into a new extension we can fit longer single pieces here than almost anywhere else in Croydon, which is worth designing for.

1930s and inter-war semis

Getting stone into the room

Easy compared with the north of the borough. Driveways, dropped kerbs and side gates wide enough to wheel a slab round the back to the extension doors.

1930s and inter-war semis

The shape of the run

If the island is a few hundred millimetres longer than the usable length of a slab, a second slab gets bought to gain that overhang, and the whole slab is paid for rather than the part used. Join positions and vein direction are marked on the template drawing before it leaves site. Real angles, not plan angles.

1930s and inter-war semis

True everywhere, stated once

A template records what the building actually did, not what the plan intended. How far those two things diverge is entirely a function of when the house was built.

Access

Getting stone into a Shirley kitchen

Easy compared with the north of the borough. Driveways, dropped kerbs and side gates wide enough to wheel a slab round the back to the extension doors.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

3–7 working days

From template to fitted, working days from template. The same on this patch as every other.

New Malden patch

Shirley is worked from our New Malden run, covering South West London & Surrey.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Worktop templating in Shirley

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Do you cover Shirley?

Yes. Shirley is on the patch, and the postcodes we work here are CR0. It is run from the New Malden side, covering South West London & Surrey. Off-street parking means the van stays put all day, so tools, packers and the offcut we would rather have than not are all within reach. It is noted on the job sheet at template so the fitting crew inherit the answer rather than rediscovering it. Two hours is the realistic figure. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.

Does the housing in Shirley change how worktop templating works?

Bungalow kitchens are frequently extended into the rear or opened into the roof space, so the room is part original and part new build. The typical 1930s kitchen sits at the back with a low window over the sink run, so the template records the exact sill height above the units to settle whether an upstand fits or the stone has to die into a window board. No stone is ever cut from a plan. Where we can get through the side gate straight into a new extension we can fit longer single pieces here than almost anywhere else in Croydon, which is worth designing for.

How does the stone actually reach a kitchen in Shirley?

Easy compared with the north of the borough. Driveways, dropped kerbs and side gates wide enough to wheel a slab round the back to the extension doors. The side passage is the measurement that matters, because a piece has to be carried flat down it and then turned in at the back door, and the turn is always tighter than the passage. A template taken without walking the route produces a drawing that cuts beautifully and will not go in. That is part of what the visit is for. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.

Is worktop templating common in Shirley?

It is one of the three we do most here, behind worktop design & quotation. Same template visit, same workshop, same installers either way. Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. Two to three hours on site, with the sink, tap and hob physically present. Units fitted, fixed and level first. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Two to three hours on site, with the sink, tap and hob physically present. Appliances on site, not on order.

Why do two Shirley kitchens the same size price differently?

If the island is a few hundred millimetres longer than the usable length of a slab, a second slab gets bought to gain that overhang, and the whole slab is paid for rather than the part used. Join positions and vein direction are marked on the template drawing before it leaves site. Real angles, not plan angles. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

What has to be finished before you can template?

A chimney breast left in place splits a wall into two alcoves, and the two are rarely the same width and rarely parallel to each other. The laser plots it as it is, at the exact height the worktop will sit, and the drawing carries that through. That is why the visit takes two or three hours. All base units in, including anything standing on the later extension slab, walls skimmed to final thickness, and the sink, tap and hob delivered so cut-outs and tap centres are set from the actual items. Where someone is living in the house through the work, the strip-out and the fit are planned so the kitchen is out of use for a day and not a week. A template booked hopefully around another trade is the commonest cause of a wasted visit. Appliances on site, not on order.

Next step

Worktop templating in Shirley, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7479 194398