Skip to content

City of London · EC1A EC1M

Reception counters and desks in Smithfield

Counter tops fabricated to a joiner's carcass, including the lower transaction shelf and the knee recess that has to go with it.

  • 5.0from 26 Google reviews
  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Smithfield kitchens

The buildings and streets around Smithfield

warehouse and cold-store loft conversionGeorgian townhouse around the squareconverted meat trade buildingrecent apartment scheme

One kitchen in Smithfield might take a single run along a back wall and the next an island as well, which is why reception counter work is never quoted blind. Loft conversions in former market and warehouse buildings give big open plans with island runs of 3-4m under high ceilings, often with exposed brick and cast-iron columns landing awkwardly close to the run. The Georgian houses around the square are the opposite - narrow, listed, with kitchens at basement or ground of 2.4-3m and floors that are anything but level. We would rather find an out of square wall at survey than on fitting day, so the survey is thorough and unhurried.

Exposed brick and steel is the whole job here, because neither of them presents a flat plane to scribe to. Two working surfaces at two heights, a return between them and clear knee space under the lower one: that is the shape almost every counter ends up being, whatever the front elevation promised. The counter is drawn to the carcass, and the carcass is measured first.

Original brickwork is uneven by ten millimetres or more across a bay, so the back edge is scribed to the actual face rather than to a line. A goods lift and a wide landing let a counter go up in fewer pieces than most buildings allow, which brings the join count down. Old shopfronts were never sized for a three-metre top.

What the surveys keep coming back to is warehouse and cold-store loft conversion, Georgian townhouse around the square, converted meat trade building and recent apartment scheme. The run length that is easy in one is a join in another.

True everywhere

Reception counters and desks, in short

  • A counter on a joiner's carcass is templated after the carcass is in, not from the drawing.
  • The lower transaction shelf needs clear knee space beneath it, which decides where a leg or a gable can go.
  • Long runs are joined over a support, and the join is placed where the eye does not follow the counter.
  • Cable and card-reader apertures are cut in the workshop, not on site.
Borough
City of London
Postcodes
EC1A, EC1M
Covered on
our City of London run
Fitted
5–10 working days from template

The place

Why Smithfield is its own job

A quote for Smithfield that ignores how the slab gets in is a quote that will change on the day. The market end operates through the night and early morning with lorry movements and cleaning, so an early start clashes with trade rather than helping you, and mid-morning is the better window. Warehouse conversions frequently retain a wide goods lift or a loading door with a hoist beam, which if it is still usable is the easiest way to get a long piece up. Cast-iron columns in these lofts are never quite where the drawing says, so scribe the island around the column rather than trusting a plan dimension. It is the reason we template every room rather than working from a plan.

The work

What reception counters involves

What this is not is joinery. We do not build the carcass, and it has to be finished, fixed and level before there is anything for a templater to measure. The whole desk is dry-assembled at the works, returns and openings included, and checked against the drawing before a single piece is wrapped. You end up with every visible edge finished alike, front, back and both returns, because a counter is seen from all sides in a way a worktop never is.

A reception counter is two working surfaces at two heights joined by a return, and the lower one exists so somebody in a wheelchair can be served at it. Where a run is longer than one piece can be, the join is placed over a support and away from the line the eye travels along. Exposed brick and steel give nothing to scribe to, so the counter is set out from itself and a shadow gap does the rest. The join sits over a support and out of the sightline.

Mitred waterfall edge detail on a quartz island
Waterfall endsSee the options

The money

What it costs in Smithfield

Machining is where the money sits: apertures for cable and card readers, a radiused internal corner at every opening, and a mitred return between the two levels. Overhangs, a waterfall end and seating all add machining, and an island is where those decisions cluster. Colour and finish account for most of the distance between £110 and £550 per square metre. Everything decided after that is labour, and labour is quoted by the operation. Working at night is quoted as working at night, or not at all.

warehouse and wharf conversions

The carry, and what it rules out

A car will often hold more than its doors will admit, and it is the clear width between the door edges that a piece actually has to pass through. The lower transaction shelf is short and easily handled; it is the upper counter that has to be walked in on edge and turned at every corner. Pieces come in the order the carcass will accept them.

warehouse and wharf conversions

Smithfield in the housing figures

In this corner of the borough, most of the housing is flats. It caps the maximum piece before the slab yield is even looked at, which is the reverse of how a kitchen is planned. A counter is priced by its pieces, not by its frontage.

warehouse and wharf conversions

What Smithfield asks for

Commercial rather than residential, and priced from the drawing rather than from the housing type. Residentially, worktop fabrication, worktop installation and worktop templating is what comes up here. The fabrication is identical.

Access

Getting stone into a Smithfield kitchen

The market end operates through the night and early morning with lorry movements and cleaning, so an early start clashes with trade rather than helping you, and mid-morning is the better window. Warehouse conversions frequently retain a wide goods lift or a loading door with a hoist beam, which if it is still usable is the easiest way to get a long piece up.

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted, working days from template. The same on this patch as every other.

City of London patch

Smithfield is covered on our City of London run, along with the rest of the Square Mile.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Smithfield

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

Are you set up to work in Smithfield, or is it a subcontractor?

Yes. Smithfield is on the patch, and the postcodes we work here are EC1A, EC1M. It is worked on our City of London run, along with the rest of the Square Mile. On a street with no restrictions the constraint is other residents rather than a warden, so it is worth putting a cone or a car out early. Loading bays belonging to the building are booked by whoever holds the lease, and that is seldom whoever ordered the counter. One space, one visit, and the counter goes in whole. Both visits happen in your kitchen, the template and the fit, so there is nothing to visit and nothing to collect.

What should I expect from reception counters in a Smithfield kitchen?

Steel columns and downstands land where the frame put them, which is frequently in the middle of what would otherwise be a clean run. Converted warehouses hold the studio, agency and workspace receptions, and a counter in one sits in open floor with nothing behind it. The service road at the back is often the real way in. Where a column lands in the run the template plots its actual outline so the stone is cut to fit around it rather than stopped short and filled. A counter is worse off than a kitchen here, because it usually stands clear of the wall and has nothing behind it to hide a gap. The scribe is cut in the shop, eased on site, and no further.

How would you get a worktop into a property in Smithfield?

Once a long piece is in on the diagonal there is no room left for anyone else, so it travels up alone and is met on the landing above. A counter top is one long piece with no run of cabinets to break it, so the route decides the join count before the sightlines get a vote. A polished front edge travels facing inward, always. A free-parking street with cars both sides can still leave the van forty metres away, and that distance is carry, not driving. The upper counter is the longest piece on the van, so the tail lift needs the full swing radius clear on the pavement. Where the goods entrance is round the back, the carry is priced from there.

Is Smithfield really a reception counters area?

Not particularly. It would be easy to say yes and leave it there. What the research on this patch actually lists is worktop fabrication, worktop installation and worktop templating. That is about what people have here rather than how it gets done. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. Where an operator is fitting out several receptions, the counters come off one slab run so the desks read as a set rather than as neighbours. On a fit-out counter the date is half the decision. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. A fit-out programme puts the counter last, behind the joiner and the electrician, which is exactly when the least time is left to template it. Nothing is cut until the joinery has been signed off.

What moves the number on a quote around here?

Some of them overhang on two sides at once, and each side is worked out separately, because the load on an edge people lean against is not the load on an edge people walk past. A counter has the same argument in miniature: a straight run nests kindly on a slab, and every return costs yield. The front edge is the one everybody touches, so it is drawn first. Reckon on £110 to £550 per square metre for the material supply only, with templating, fabrication and fitting itemised separately.

What state does a Smithfield kitchen have to be in before you template?

Exposed structure means the back edge is not a straight line at all, and a scribe of fifteen or twenty millimetres across a run is normal. What a counter is scribed to is the joiner's carcass rather than the plaster, which is why it is templated after the carcass is fixed and never before. Stone will not straighten joinery, and it will not forgive it either. Send the goods lift dimensions and the carry route from the loading area, and confirm whether the counter stands clear of the walls or returns into one. Nobody reseals a worktop annually in a let property, so a material that depends on being resealed is the wrong specification however well it photographs. The same split runs through commercial property: a landlord fitting out a shell and a tenant fitting out their own reception want different things from one counter. The agent approves the drawing without leaving the office.

What is actually on a Smithfield worktop quote?

Nothing is payable until the template, and the template measures the room as it stands rather than estimating from a plan. Plumbing, gas and electrical work are not in the figure, because we do not do them. Two kitchens the same length can be far apart, because material, edge and cut-outs move independently of size. A deep scribe comes out of the nest, so how far the stone has to be relieved changes which part of the slab the piece is cut from. A lobby wall that leans shows itself along the back return, so that edge is cut to the line the wall actually takes. The front edge runs straight whatever the wall behind it does.

What if something breaks during the fit?

Chips at an edge or a corner are the usual form, because that is where stone is least supported. Most breakages happen on the carry, which is why the route is walked and measured before anything comes off the van. Every piece is dry-assembled on the bench before it is loaded, so a fabrication mistake is found in the workshop rather than in your kitchen. Pieces get staged in the ground floor lobby and sent up singly, which needs somewhere to stand them where nobody will walk into them. A lobby is one of the few places a piece can be staged, so the counter comes in early and stands on trestles until the carcass is ready for it. The counter is the last thing in and the first thing looked at.

Do the template and the fit happen on the same visit?

Nothing is payable in advance of the template. Between the template and the fit the slab is nested, cut, mitred and dry-assembled on the bench, which is work you never see and is most of the wait. The design and quotation visit comes first. It is free and carries no obligation. Open plan means long uninterrupted runs and an island in the middle of the room with every edge on show. A reception counter answers to the building it stands in more than to the drawing, because it is fabricated to a carcass somebody else has already built and fixed. Two heights and a return, settled before any stone is cut.

Do you take on fitting-only work in Smithfield?

Delivery to the workshop has to be arranged and dated, since nothing is nested until it is there. Supply through us runs £110 to £550 per square metre for the slab alone, which is the line you would be removing. How the slab has been stored is worth telling us, because stone kept flat is not stone off a rack. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. The apertures for cable and card readers are what changes between one desk and the next, and every change is a fresh drawing rather than a variation. A phased fit-out gets phased templating, one lobby at a time.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 on Google →
Perfect service,the best on this job

Kleant Istrefi

Google review

I recently had my kitchen worktop and splashback done by Karem from Worktop WorX and i am very pleased with the result. From the initial consultation and measurements to the final installation, the whole process was smooth and professional. The attention for details and the quality made the difference and everything was finished to a high standard. I definitely recommend Worktop WorX to anyone looking for reliable and high quality kitchen work

Alexandru Balint

Google review

Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!

Nastasia Drago

Google review

Next step

Reception counters and desks in Smithfield, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.

+44 7830 847489