The building, and what it does to the job
Around here houses are the minority and blocks are the norm. No two kitchens are set out alike. The day is planned backwards from that before anything comes off the van. Any adjustment happens before adhesive, never after.
Where the side return has been filled in, the old external wall is now an internal one and still carries its render, its gutter line and its old fixings. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. Fixings go into what the wall actually is.
Rear extensions here are frequently new build butted against old brick, so allow a movement gap at the junction rather than running one uninterrupted top across the old and new wall line.
