Richmond upon Thames · TW12

Worktop installation in Hampton

Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Hampton kitchens

The kitchens we meet in Hampton

The part of worktop installation in Hampton that surprises people is how much of it is decided before anyone touches a slab. Riverside houses with kitchens raised above flood level or set behind a lightwell, small period cottages with sub-2.5m runs, and a large interwar suburban belt inland where the standard job is a rear extension with a 3.6m run and an island of about 2m. A worktop that fits is a worktop that was measured. The description is background, the template is the actual instruction.

A picture rail, a deep skirting and a moulded architrave all sit in the way of anything that assumes flat wall from floor to ceiling. Pieces come in the order they go down, because there is rarely anywhere to stand the second one while the first is bedded. Older buildings get the extra hour.

The rear room is generous with a chimney breast in one corner, so the run gains a return and two scribed ends whatever the plan drew. The day is planned backwards from the hall. A dry-lined wall hides a void, and the void gets bridged.

What the job sheets keep listing is Georgian riverside house, Victorian cottage, 1930s semi, postwar detached and modern riverside flats. That mix is why two jobs on the same road can run completely differently.

Polished stone edge profile close up
  • Georgian riverside house
  • Victorian cottage
  • 1930s semi
  • postwar detached
  • modern riverside flats

True everywhere

Worktop installation, in short

  • One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
  • A granite top is treated with sealer on the day it goes down.
  • Workmanship is guaranteed for five years, the material for 25.
  • Every piece is carried in by hand, and stone does not bend.
Borough
Richmond upon Thames
Postcodes
TW12
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Hampton is its own job

There is nothing clever about a fit in Hampton going smoothly, only a survey that asked the right things beforehand. The riverside road is narrow with limited pull-in and floods on high tides, several houses are reached by a footpath from a shared parking area, while the suburban roads inland have driveways and easy standing. In the flood-prone riverside properties the plinths and carcasses are often raised or moisture-resistant, so worktop heights sit higher than standard - confirm before templating. Templating in the room after the units are level takes the guesswork out of all of it.

The work

What worktop installation involves

Fitting covers the stone and everything holding it down: the pieces are set, the joins pulled up, and the sink and hob bedded into their openings before the run is sealed. The run is set out from a fixed point, a corner or the wall the sink sits against, and worked outward, so what tolerance the room has ends up at the open end where it can be absorbed. You end up with the fitting day behind you in one go. There is no second appointment for a piece that did not fit and no trades left waiting on each other to come back.

Installation is one visit: the pieces arrive cut and finished, and they leave the van in the order they will be set. Anything found on the day that changes the job is raised before it is fixed, not itemised afterwards. In a house of this age the wall behind the run is the least straight thing in it, so the scribe is the long part of the day rather than the fixing. You watch it go down before it is fixed, not after.

Edge profiles See the options

The money

What it costs in Hampton

The fitting line on a quote is manpower and time, which is why it responds to the route into the kitchen rather than to the size of it. An island is a yield question before it is a design one: it either comes out of the same slab as the perimeter or it needs a second. Thickness on its own can move the supply figure a long way inside the £110 to £550 range, and it changes the machining as well, which is why the two are never given as one number. Nothing about the fit is left to the day to decide.

period detached houses and villas

What Hampton asks for

The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. We will work around whoever is still in the building, but that has to be known beforehand rather than discovered on the morning. Handover day is a hard stop.

Ahead of everything else in how often we are asked for it around here.

period detached houses and villas

The shape of the run

A pop-up socket in the surface is one more cut-out through the full thickness, and it wants the same clear space beneath it that a sink does. Support goes in before stone does, so whatever steel, plywood or extra noggin the shape calls for is fitted while the room is still empty. The step between rooms is packed out first.

Access

Getting stone into a Hampton kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

Hampton is covered on our south west London run, along with the rest of Richmond upon Thames.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Hampton

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is Hampton far enough out to be a problem for you?

Yes. Hampton is on the patch, and the postcodes we work here are TW12. It is worked on our south west London run, along with the rest of Richmond upon Thames. Drives with a dropped kerb and a tight turn-in take a long van at an angle, and that angle decides which side the tail lift can work from. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. Slack in the day gets spent on the street or on the fit. Everything that involves you happens in your kitchen, so there is nothing to visit and nothing to collect.

02

What is different about worktop installation in Hampton?

The party wall is the straightest surface in the house and everything else has moved away from it over a century. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. Movement joints in the shell stay movement joints. A run can measure dead right at both ends and still belly out in the middle, which only appears once the template plots the intermediate points. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. A scribe is a cut. It is not an adjustment.

03

Is access a problem in Hampton?

Even an easy kerbside carry wants the pavement clear at the tail lift, because a three-metre piece on edge has a swing radius nobody expects until it is swinging. The fitting day is planned backwards from that point, before anything comes off the van. That is what the morning is planned around. Where the drive is too short for the van the back end overhangs the footway, and a footway is a route people are using rather than spare space. We aim for the first slot of the day where parking is tight, because that is when the street is emptiest. The parking dictates the sequence, not the kitchen.

04

Is Hampton mostly worktop installation work for you?

Yes. On the research for this patch it is the first of the three jobs listed. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The fitting day is scheduled to suit that rather than to suit the diary. The annexe and the main kitchen go in together. Extension work runs late far more often than it runs early, and the worktop is close to the last thing in, so the date agreed at the start is rarely the date that happens. Where the window is fixed there is no second day to fall back on, so the prep list matters more than usual. One kitchen out of use, never the whole house.

05

What makes one Hampton kitchen dearer than the next?

On a book-matched pair the halves are laid out so the mirror line runs down the length of the piece, and once that line is set the top cannot be turned round to suit anything else. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Nothing is cut on site if the bench can do it. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What holds a template up more often than anything else?

Where a corner is a couple of degrees off, a mitre cut to a theoretical ninety degrees opens on the wall side and there is no closing it afterwards. Rushing that is what leaves a gap you look at every morning for fifteen years. The last hundred millimetres decide how it reads. Clear the full hall and stairs route of furniture, bikes, coats and stair-gates, and keep the front door propped and unobstructed for the carry. Two flats with an identical layout can want entirely different things from the same run of worktop, which is why the quote follows the run rather than the address. The fitting day is arranged with whoever can actually give us access for the whole slot. A void between tenancies has no spare days in it.

07

What is the order of events on a Hampton kitchen?

Templating and fitting are two visits, not one, and the gap between them is when the stone is actually cut. The fit follows 5 to 10 working days after the template, and nothing is cut before that visit because nothing is cut from a plan. No payment is due before the template. The rear wall of the addition carries both the back door and the window, which leaves very little unbroken wall for a run to sit against. The fitting day is planned backwards from all of it, before the first piece comes off the van. Access, floor and wall in that order, then stone.

08

What happens to the worktop that comes off?

Old tops are screwed or glued from underneath, so the drawer boxes come out before the worktop does. Disposal means it goes in the van, not into the garden to wait for a collection. The sink and hob are lifted out with the old top and kept aside if you are reusing them. Having the van on the drive means the load can be staged, so the heavy pieces come off last and go straight in instead of standing outside. Two men and a long carry is a different day from two men and a drive, and the crew is sized on that. Where there is no space, the plan starts the night before.

09

What maintenance does a worktop need in a Hampton kitchen?

Where a top takes wine, oil and lemon most days, the non-porous materials ask least of the household. Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. Topping a seal up is a wipe-on job with a cloth. These were built with a scullery that has since been swallowed by an extension, leaving a change of floor level roughly where the run crosses. Scribing takes longer than the carry does, so the quiet half of the day is the half that runs over. A structure this old is worked with, not corrected.

10

What if I have already sourced the slab?

Supply through us runs £110 to £550 per square metre for the slab alone, which is the line you would be removing. Templating, fabrication and fitting are the same three lines whether the stone came from us or from you. Where a family has been living around a building site for months, the finish date carries more weight than any other part of the specification. One visit, with the sink and hob seated and sealed before we leave. Plot after plot, the same fitting sequence.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Great experience from this company, I am happy with the materials, fitting and the team.”
Rrahim BratiGoogle review
★★★★★
“Absolutely delighted with our new worktop from Worktop WorX. The Capri White finish looks incredible, clean, modern, and really brightens up the whole kitchen while pairing beautifully with the darker cabinetry. The quality of the worktop is outstanding, with a flawless finish and seamless installation that really shows the attention to detail. It’s not only stylish but also feels incredibly durable and practical for everyday use. Cam handled everything from start to finish and made the whole process smooth and stress-free. Professional, reliable, and clearly takes pride in the work. Highly recommend Worktop WorX. We couldn’t be happier with the result!”
Dawid MyszorGoogle review · Capri White
★★★★★
“Excellent service and top quality workmanship. The worktop looks absolutely amazing and the attention to detail is impressive. The team was professional, punctual, and very easy to work with. Highly recommended for anyone looking for a premium kitchen worktop! 👌”
Costin RomanGoogle review

Next step

Worktop installation in Hampton, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.