Richmond upon Thames · TW12
Worktop installation in Hampton
Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.
Hampton kitchens
What the kitchens here are actually like
The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. The fitting day is planned backwards from all of it, before the first piece comes off the van. The route is walked before the first lift.
In the flood-prone riverside properties the plinths and carcasses are often raised or moisture-resistant, so worktop heights sit higher than standard - confirm before templating. The riverside road is narrow with limited pull-in and floods on high tides, several houses are reached by a footpath from a shared parking area, while the suburban roads inland have driveways and easy standing. Riverside houses with kitchens raised above flood level or set behind a lightwell, small period cottages with sub-2.5m runs, and a large interwar suburban belt inland where the standard job is a rear extension with a 3.6m run and an island of about 2m.
The party wall is the straightest surface in the house and everything else has moved away from it over a century. The day is planned backwards from the hall. The slow parts are slow for a reason.
On these streets the housing is Georgian riverside house, Victorian cottage, 1930s semi, postwar detached and modern riverside flats. That mix is why two jobs on the same road can run completely differently.
True everywhere
Worktop installation, in short
- One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
- Every piece is carried in by hand, and stone does not bend.
- We seat and seal the sink and hob. We do not connect water, waste, gas or electrics.
- Floors and units are protected before anything comes through the door.
Covered from the New Malden patch. Fitted 3–7 working days from template.
period detached houses and villas
What gets asked for here
Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The fitting day is scheduled to suit that rather than to suit the diary. The prep list is not optional.
This is one of the three jobs that come up most here, behind worktop design & quotation. It is the same template visit, the same workshop and the same installers either way.
period detached houses and villas
The building, and what it does to the job
The hallway turn and the door width, which cap the longest single piece we can physically get to the kitchen regardless of what the run measures.
Access
Getting stone into a Hampton kitchen
The riverside road is narrow with limited pull-in and floods on high tides, several houses are reached by a footpath from a shared parking area, while the suburban roads inland have driveways and easy standing.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
Hampton is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop installation in Hampton
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Hampton, or just list it?
Yes. Hampton is on the patch, and the postcodes we work here are TW12. It is run from the New Malden side, covering South West London & Surrey. Gravel and block paving both look like hard standing and neither takes a loaded trolley, so the run from tail lift to door gets boarded. We aim for the first slot of the day where parking is tight, because that is when the street is emptiest. The day is built around that window. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop installation in Hampton?
A semi has a side passage, and whether it is wide enough to carry a piece flat and turn it in at the back door is the first thing worth measuring. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. That is the shape of the day. In the flood-prone riverside properties the plinths and carcasses are often raised or moisture-resistant, so worktop heights sit higher than standard - confirm before templating.
Is access a problem in Hampton?
The riverside road is narrow with limited pull-in and floods on high tides, several houses are reached by a footpath from a shared parking area, while the suburban roads inland have driveways and easy standing. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. We walk the route with a tape and protect it end to end before the first piece is lifted. That is what the morning is planned around. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is worktop installation common in Hampton?
It is one of the three we do most here, behind worktop design & quotation. Same template visit, same workshop, same installers either way. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. One visit, with the sink and hob seated and sealed before we leave. Sealed before we leave. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The fitting day is scheduled to suit that rather than to suit the diary. The prep list is not optional.
What decides the price of a worktop in Hampton?
Seating overhangs past roughly 300mm will not carry on the carcass alone, so flat steel bar or a plywood substrate has to be built into the units first. Joins are pulled with suction clamps and finished flush, then colour-matched, which is the last thing done rather than the first. Dry-lay first, always. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
The stone carries the scribe because the wall cannot be persuaded, so back edges are cut oversize and eased in rather than dropped straight down. Rushing that is what leaves a gap you look at every morning for fifteen years. Dry-lay, mark, cut, then bond. Clear the full hall and stairs route of furniture, bikes, coats and stair-gates, and keep the front door propped and unobstructed for the carry. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A half-day of access is not a fitting day, and it is better to say so at booking than to find out at eleven. One visit, our own installers.
Related
More around Hampton
Other work we do in Hampton
Next step
Worktop installation in Hampton, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.