Richmond upon Thames · TW12

Worktop replacement in Hampton

Taking out a tired laminate worktop and fitting stone on the units you already have, in a single day.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

Hampton kitchens

The kitchens we meet in Hampton

We plan the replacements in Hampton around access, ceiling height and what the kitchen has already been through, none of which shows up in a phone call. Riverside houses with kitchens raised above flood level or set behind a lightwell, small period cottages with sub-2.5m runs, and a large interwar suburban belt inland where the standard job is a rear extension with a 3.6m run and an island of about 2m. The survey answers it, the drawing records it, and you sign off the drawing before a single sheet is cut.

A picture rail, a deep skirting and a moulded architrave all sit in the way of anything that assumes flat wall from floor to ceiling. A kitchen that has stood twenty years has settled into a shape of its own, and the new stone is cut to that shape rather than the original one. Whatever the old top hid comes to light.

The larder under the stairs is usually still there and still opens into the kitchen, so the run stops at a door that cannot be moved. Carcasses are checked for square and fixed back before a stone top goes on them. The wall behind the old top has not been seen in years.

The building types here are Georgian riverside house, Victorian cottage, 1930s semi, postwar detached and modern riverside flats. Which one you have changes the order of the day more than the design does.

Undermounted sink cut-out in a quartz worktop
  • Georgian riverside house
  • Victorian cottage
  • 1930s semi
  • postwar detached
  • modern riverside flats

True everywhere

Worktop replacement, in short

  • The units stay. Only the surface changes.
  • Up to four quartz samples are posted free before you commit to a colour.
  • The new material is guaranteed for 25 years and the labour for five.
  • New stone is fitted five to ten working days after the measure.
Borough
Richmond upon Thames
Postcodes
TW12
Covered on
our south west London run
Fitted
5–10 working days from template

The place

Why Hampton is its own job

Most of the work of a fit in Hampton happens before the van is loaded, in what we have already checked and allowed for. The riverside road is narrow with limited pull-in and floods on high tides, several houses are reached by a footpath from a shared parking area, while the suburban roads inland have driveways and easy standing. In the flood-prone riverside properties the plinths and carcasses are often raised or moisture-resistant, so worktop heights sit higher than standard - confirm before templating. You see the drawing before we cut, and if we have read the room wrong, that is the moment to say so, not the morning the fitters arrive.

The work

What worktop replacement involves

The service assumes the units stay in place, so it is not a route to changing the layout. Moving a sink or a run of cabinets makes it a kitchen job with a worktop in it. The surface is cleared and the route out protected before anything is unfixed, because a top that has been sealed and screwed down for years leaves the house in pieces with edges on them. You end up with tiling, sealant and the wall line all finished against the new surface, so there is no strip of old grout left showing where the previous top used to sit.

Replacement is the job where the tiling, the sink and the wall behind them all get settled at the same time as the worktop. What comes off is loaded into the van and gone the same day, and its weight is costed before the work starts rather than after. The back addition wall is soft lime plaster over brick, so tiles above the old top rarely come away without bringing the face with them. The old surface leaves in our van, not your garden.

Sink cut-outs See the options

The money

What it costs in Hampton

A replacement is the cheapest way to change how a kitchen looks, provided the units underneath are sound. An island is a yield question before it is a design one: it either comes out of the same slab as the perimeter or it needs a second. The rate is £110 to £550 per square metre supply only, though what you buy is slabs rather than square metres, which is why the material line follows the yield and not the tape. What is found underneath is raised before it is charged.

period detached houses and villas

The carry, and what it rules out

The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. With no room to turn, the old top gets cut up in the kitchen instead, which is dusty work and needs the room emptied first. Disconnection happens before the old top is lifted, not during.

period detached houses and villas

What Hampton asks for

Rear and side-return extensions are where the islands appear, and an island is the piece that decides whether one slab does the kitchen or two. The units stay and only the surface changes, so the whole job is one day rather than a kitchen refit. A builder-finish kitchen upgrades in a morning.

The stock here does not generate much of this. What it generates is worktop installation. The job itself is surveyed, quoted and fitted exactly as it would be anywhere else we work.

Access

Getting stone into a Hampton kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South west London patch

Hampton is covered on our south west London run, along with the rest of Richmond upon Thames.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in Hampton

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Are you set up to work in Hampton, or is it a subcontractor?

Yes. Hampton is on the patch, and the postcodes we work here are TW12. It is worked on our south west London run, along with the rest of Richmond upon Thames. Drives with a dropped kerb and a tight turn-in take a long van at an angle, and that angle decides which side the tail lift can work from. A replacement is a two-way job, with old tops going out and new stone coming in, so the van needs to stay put across the whole day. The old tops have to go somewhere as well. The work comes to you. We template in your kitchen and fit in your kitchen, with nothing to visit or collect.

02

What do the kitchens in Hampton do to worktop replacement?

Where a side return has been infilled, the join between old brick and new blockwork lands mid-run and the two faces are never in one plane. In most Victorian terraces the kitchen sits in the back addition, so you get a narrow galley with one outside wall and nothing square to work off. Old tops were scribed to a wall that has moved since. A room can be out of square in both directions at once, so the wall that leans is also the wall that runs downhill, and one scribe cannot answer both. The old top has been hiding it, so the first honest look at it happens when the laminate comes off. Same footprint, different tolerances.

03

Do you have trouble getting long pieces into Hampton kitchens?

A short hard approach with no steps means a full-length piece can be walked in flat by two people rather than turned up on edge. Worth remembering that the old tops have to come out the way the new ones come in, and a laminate run is easier to remove in one length than to carry in one. The strip-out is planned around it. Where the drive is too short for the van the back end overhangs the footway, and a footway is a route people are using rather than spare space. We stage the strip-out so the old tops leave in one trip rather than trickling out across the afternoon. Access out counts as much as access in.

04

Does Hampton actually ask for worktop replacement?

Not particularly, and it would be easy to pretend otherwise. What the research on this patch actually lists is worktop installation. That is a point about the buildings round here, not about the job. The quoting, the cutting and the fitting are identical here to anywhere else we work. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The carcasses have to be sound, because stone is several times the weight of what is coming off. The doors are staying, so the colour answers to them. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Old tops out in the morning, new stone down and sealed the same afternoon. Between tenancies is the only window there is.

05

What decides the price of a worktop in Hampton?

If the island is a few hundred millimetres longer than the usable length of a slab, a second slab gets bought to gain that overhang, and the whole slab is paid for rather than the part used. The existing layout is being kept, so the question is whether the old carcasses will take stone in that shape without more support. Joins move onto the gables this time round. The material band is £110 to £550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.

06

What do I need to sort out first?

Plaster thickness varies over the height of a wall, so the line at worktop height is not the line at skirting level, and the units decide which one matters. This is the commonest reason a replacement turns out to need more than a straight swap. The sill was always low. Nobody had to care until now. Have a plumber booked to disconnect the sink, tap and waste first thing and reconnect after we have gone, and clear the hallway and stairs completely so we can carry slabs through the house. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. If the carcasses are tired the honest answer is that stone will find that out, and it is better said before than after. Notice goes out before the crew is booked.

07

What do you need from me for the sink and hob cut-outs?

The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. We seat and seal the sink and hob on the day; water, waste, gas and electrics are for your plumber and electrician. On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. Old laminate has often been holding a run square for years, and taking it off shows what the units were really doing. The return is remeasured even where it looks unchanged.

08

How much upkeep is a stone worktop?

Granite is porous to varying degrees, so it is sealed when we fit it and topped up over the life of the worktop. A seal is not waterproofing. It only buys time to wipe a spill up. Day to day all three want soap and water; abrasive creams and scouring pads are what dull a polished surface. A semi has a side passage, and whether it is wide enough to carry a piece flat and turn it in at the back door is the first thing worth measuring. Lath-and-plaster and bowed brickwork mean we template for scribes rather than straight cuts, and each piece is offered up and eased in rather than dropped straight down. What the last fitter did to the wall shows up on strip-out.

09

Who removes the old worktop in a Hampton kitchen?

The sink and hob are lifted out with the old top and kept aside if you are reusing them. Tiling bonded to the wall behind usually comes away with the old top, so that wall is agreed beforehand. The tap and waste have to be disconnected by a plumber before we start and reconnected once the stone is in. Having the van on the drive means the load can be staged, so the heavy pieces come off last and go straight in instead of standing outside. Two loads share the one space here, the old tops waiting to go and the new stone waiting to come in. Waste needs a space of its own and the street rarely offers one.

10

Do you take on fitting-only work in Hampton?

The quote is itemised, so a job where you already hold the slab is the same job with the material line taken off it. How the slab has been stored is worth telling us, because stone kept flat is not stone off a rack. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. A surface swap is the fastest upgrade available on a kitchen that is otherwise sound. One plot replaced years on, matched or otherwise.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review
★★★★★
“I used Karem’s services 5 years ago for purchasing and fitting the quartz worktop in my then brand new kitchen. The price was reasonable and the service reliable and spot on, no delays in fitting, misunderstanding or excuses. I recommended him to a friend, who also used his services and they were happy too! If I need to order new kitchen work top again, I would definitely use him again. Thanks Karem!”
shoshencenceGoogle review · quartz
★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review

Next step

Worktop replacement in Hampton, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.