The building, and what it does to the job
Across this patch a large share of the housing went up between the wars. The awkward moment is nearly always the same one on this plan, so it is dealt with early. Fitted to the survey, checked against the room.
These kitchens have been retiled at least twice, and stripping the tiles takes the bottom band of plaster with them because the old laminate ran underneath rather than up to them. Where a return wraps into a recess, the piece is offered in dry, marked and eased rather than pushed. The slow parts are slow for a reason.
Islands out here are frequently sited over a raised floor slab in the new extension, so check the finished floor level and unit height against the rest of the kitchen before templating.