The building, and what it does to the job
Around Stoke Newington, almost nothing dates from between the wars, which leaves the stock either older or newer and rarely in between. The awkward moment is nearly always the same one on this plan, so it is dealt with early. The route is walked before the first piece moves.
Sash windows sit in deep reveals with a working box behind the lining, so a run dying into one has to clear more than the plaster. The finish time is set by the block rather than by the work, so the sequence is planned to end early rather than to run late. Carried once, and carried properly.
Long side-return runs usually need a join, so place it at a cabinet break and batch-match, because an island and a 4m run cut from different blocks will not look right in this much daylight.
