Bexley · DA16

Splashbacks and upstands in East Wickham

Stone taken up the wall, cut from the same slab run as your worktop so the batch actually matches.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Induction hob set into an Enzo run below a full-height matching splashback, under the painted mantel canopy

East Wickham kitchens

The kitchens we meet in East Wickham

Understanding splashback and upstand work in East Wickham means understanding the kitchens it happens in, which is a more interesting subject than most people expect. Interwar semis mixed with postwar estate housing where the kitchens are noticeably smaller, 2.1m to 2.6m single runs with a boiler cupboard, and the usual job is a straight replacement into the existing units. Ring us with the rough dimensions and we will tell you what is likely, then confirm it properly at the East Wickham survey.

The carry is the constraint: a single stair with tight half-landings, or deck access with a long walk from the lift. Socket positions, sill heights and wall flatness are the three things that settle this, and all three are properties of the building. Height is taken at the shortest point of the run.

Windows and doors were replaced across whole streets on one programme, so the kitchen window is a plastic frame in the old opening with a deep lined reveal. Where the wall carries a service duct the panel stops at the boxing, and that edge is finished as an edge. Decided before fabrication starts.

The buildings themselves are mostly 1930s semi, postwar council estate and 1960s terrace. The join count is decided by which of those the room sits in.

Mitred waterfall edge detail on a quartz island
  • 1930s semi
  • postwar council estate
  • 1960s terrace

True everywhere

Splashbacks and upstands, in short

  • Cut from the same slab run as the worktop, at the same time.
  • The joint to the worktop is siliconed, never grouted.
  • Upstands are small pieces, so they usually come out of the offcut the worktop leaves.
  • Dekton and sintered stone are stable in heat and daylight, which is why they suit a wall behind a hob.
Borough
Bexley
Postcodes
DA16
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why East Wickham is its own job

In East Wickham, the things that make a fit straightforward or awkward are known before we cut, not discovered while we carry. Quiet residential grid with front gardens, drives on the private housing and parking courts on the estate sections; vehicle access is easy throughout. Postwar units here are often 500mm deep rather than 600mm, so check before ordering standard-width worktop. That is a survey question, not a fitting-day question, and we treat it as one.

The work

What worktop splashbacks & upstands involves

What these pieces do is protect the wall where water and heat land: behind the tap, behind the hob, and along the back edge where a cloth never quite reaches. Nothing is trimmed on site. The openings and the returns are machined at the workshop, so the drawing has to carry every dimension the wall is going to demand of the piece. You end up with sockets and switches sitting in openings machined for them, which is the difference between a panel made for the wall and one cut to clear whatever was on it.

The panels are machined at the works and arrive finished, so nothing about them can be persuaded into place with a grinder on the day. Every outlet on that wall is recorded at its finished face beforehand, since a machined opening in a sheet of stone has no tolerance to move into. Concrete panel construction in these blocks will not accept a plug, so bonding a sheet to it suits the building better than fixing through would. A hand's width, or all of it.

Waterfall ends See the options

The money

What it costs in East Wickham

Upstands and splashbacks are priced by the metre of finished edge and the number of cut-outs, not by the area of wall they cover. Short lengths nest well and waste little, so the material line is usually the kindest part of a galley quote. Colour and finish account for most of the distance between £110 and £550 per square metre. Everything decided after that is labour, and labour is quoted by the operation. Priced by the edge and the openings, not the wall.

1930s and inter-war semis

What East Wickham asks for

This is not the local speciality and there is no point saying otherwise: worktop replacement and worktop fabrication is what the housing here actually asks for. It is quoted, cut and fitted exactly the same way regardless.

1930s and inter-war semis

East Wickham in the housing figures

In this neighbourhood almost nothing has gone up in the last fifteen years, which makes the carcass check the first question rather than the last. Ordered later, from a different batch, the match is not reliable where the pieces meet. Returns and reveals set out at finished size.

1930s and inter-war semis

The shape of the run

Where a run finishes hard against a wall the last few millimetres are scribed, and where it finishes in open floor it is cut square and polished, which is two different jobs on one length. Where the run carries a join, the panel behind it is broken in the same place, so the two seams line up instead of sitting a hand-width apart. Long walls break where the worktop breaks.

Access

Getting stone into an East Wickham kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

East Wickham is covered on our south east London run, along with the rest of Bexley.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in East Wickham

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Do your own fitters come out to East Wickham?

Yes. East Wickham is on the patch, and the postcodes we work here are DA16. It is worked on our south east London run, along with the rest of Bexley. A visitor or a neighbour parked on the drive is a five-minute problem at eight in the morning and an hour-long one at eleven. Panels come off the van in one trip where possible, since a tall piece handled repeatedly is a piece asking to be chipped. Kerb to kitchen is measured before the panels are unstrapped. There is nothing to drive to and nothing to pick up, because both visits are to the property itself.

02

What should I expect from worktop splashbacks & upstands in an East Wickham kitchen?

The window cill clears a worktop by very little, which settles how tall the upstand under it can be before anyone has drawn a thing. The rear kitchen wall in ex-council flats and maisonettes is commonly dense in-situ concrete or blockwork with a thin skim, which means mechanical fixings are hard work and the splashback is held on adhesive rather than screwed. Height, returns and sockets, all settled on site. Boxing built in plasterboard on a light frame will take no useful fixing, so nothing bears on it and the stone is carried off the carcasses either side. It is usually what pushes a job towards a 100mm upstand instead of a full-height panel, because an upstand rides what a panel exposes. Mitred returns come from one place in the slab.

03

How would you get a worktop into a property in East Wickham?

A height barrier on the car park entrance rules out a tail-lift van outright, and the stone then transfers to a trolley at the barrier itself. Splashback panels are lighter than a worktop and far more awkward, because a tall thin piece has to be carried on edge and cannot be tilted to clear a turn. Suction lifters take a panel where hands cannot get a grip. Where the front garden has been paved over completely the van stands close to the house, and the route in is still a standard front door. Splashbacks are normally the last thing off, so a short parking window is exactly when they get rushed. Wind on an open street matters more than the walk does.

04

Does East Wickham actually ask for worktop splashbacks & upstands?

Not particularly. It would be easy to say yes and leave it there. What the research on this patch actually lists is worktop replacement and worktop fabrication. That is about what people have here rather than how it gets done. It is quoted, cut and fitted exactly the same way here as anywhere else on the patch. Where kitchens turn over between tenancies the priority is a surface that survives a decade of being treated as a chopping board. Splashbacks and upstands are cut from the same slab run at the same time, which is the only way the batch actually matches. Same batch, or the join will say so. Landlord work is scheduled around void periods, so the whole thing is a fixed window and the template date matters as much as the fitting date. Socket and switch positions have to be final before templating, because a cut-out in the wrong place means a new piece. Ordered together, or the match is luck.

05

What moves the number on a quote around here?

A doorway partway along one wall breaks that side into two separate pieces, and two short pieces cost more between them than the single long one they replace. The same shape decides where splashback pieces break, and a joint in a corner reads as a detail while one in a clear run reads as a mistake. Upstands follow the return round the corner. Material runs £110 to £550 per square metre supply only, and templating, fabrication and fitting each get their own line.

06

What state does an East Wickham kitchen have to be in before you template?

A stack boxed diagonally across a corner leaves a triangle of dead space, and the top is cut to that triangle rather than to a square return. A tall panel that fits at the worktop will stand off the wall at the top unless the wall is dubbed out or the panel is scribed. The pier takes a joint against it, not across it. Any surface trunking or conduit has to be rerouted or accepted and boxed before templating, because the stone cannot be scribed around a live conduit on site. Where a landlord or housing provider is involved there is a specification to meet and a process to follow, and both are settled before a date is offered. A 100mm upstand is the low-maintenance answer, and full-height stone is the one that has to be committed to early. A second visit needs a second permission.

07

Can you fit stone I have already bought for an East Wickham kitchen?

Sinks, taps and hobs are yours to buy in any case, and they only have to be in the room for the template. If your own slab breaks there is no matching replacement to hand, and that is the real difference. Quartz suits let property well: no sealing, no annual maintenance, and nothing an incoming tenant has to be told to look after. Upstands are the cheapest way to finish several kitchens consistently, and they come out of the offcuts the tops leave behind. Sockets final before template.

08

Can the sink be undermounted rather than sat on top?

A boiling tap needs a hole of its own and a cupboard below for the tank, so the units change too. The sink, tap and hob have to be physically in the room at the template, not merely ordered, because the cut-out is machined to the item itself. Handles on opposing runs meet in the middle of the aisle, so a deep edge profile specified on both sides takes width out of the standing space twice over. Long runs almost never take a single panel, so the joint positions want agreeing before anything is templated. The hob panel is sized after the extractor, not before.

09

Where will the joins be?

Each join is an item on the drawing, so the layout and the figure move together. A mitred join at a corner is a different job from a butt join along a run, and they are not priced the same. There are only ever a few legal positions, and the one taken is furthest from the light. Older houses put the boiler or the meter on one of the two walls, and whatever is boxed in around it sets the point where that run has to stop. Upstands follow the run exactly, so every internal and external corner is a separate mitred or butted piece. A joint behind a tap is a joint on show.

10

Can you get a full-length top into an upstairs kitchen in East Wickham?

A join forced by the route still sits over a gable, so it is no poorer a join for that. Every piece goes in by hand and stone does not bend, so the tightest turn on the route sets the longest piece. Concierge buildings want the goods entrance, a booked lift and proof of insurance, all of which is straightforward when it is asked for a week out. It is usually the full-height panels rather than the tops that will not make the turn, and that only shows up when they arrive. Nothing is leaned anywhere it could slide down.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Really impressed with the quality and finish of these worktops. Great range of materials, precise fabrication, and smooth communication throughout. The whole process was easy and the final result looks fantastic. Highly recommend!”
Nastasia DragoGoogle review
★★★★★
“We installed new kitchen and got the worktop and splash back from them. Their professional work and commitment was wonderful. Quality of work compared to price was way too good. Thank you guys.”
MD Matinur RahmanGoogle review
★★★★★
“I am really happy with my worktop. It is beautiful and the service provided was second to none. I totally recommend.”
Magaly RGoogle review

Next step

Splashbacks and upstands in East Wickham, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.