Greenwich · SE9
Worktop installation in Eltham
Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.
Eltham kitchens
What the kitchens here are actually like
Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. The fitting day is planned backwards from all of it, before the first piece comes off the van. Sink and hob seated and sealed before we go.
Overwhelmingly 1930s semis — a kitchen of roughly 2.4m by 3m at the back with a garden door and a separate dining room in front. The standard job is a rear or side-return extension that merges the two into one long room with a 3.5m to 4m run and an island.
The classic Eltham job is templating a new extension where the old back wall has come out — get the steel-supported opening measured properly, it is rarely square to the new build.
Where the side return has been filled in, the old external wall is now an internal one and still carries its render, its gutter line and its old fixings. The day is planned backwards from the hall. That is the shape of the day.
On these streets the housing is 1930s semi, Edwardian terrace, postwar infill and 1960s flats. That mix is why two jobs on the same road can run completely differently.
True everywhere
Worktop installation, in short
- One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
- Every piece is carried in by hand, and stone does not bend.
- We seat and seal the sink and hob. We do not connect water, waste, gas or electrics.
- Floors and units are protected before anything comes through the door.
Covered from the New Malden patch. Fitted 3–7 working days from template.
1930s and inter-war semis
Getting stone into the room
Suburban streets with front drives and dropped kerbs on most roads, so the van usually gets within a few metres of the door; the stretches around the High Street and the station are the exception.
1930s and inter-war semis
What gets asked for here
Of everything we do around here, this is the one that comes up most, with worktop design & quotation and worktop templating behind it.
1930s and inter-war semis
The building, and what it does to the job
Where a column lands in the run the template plots its actual outline so the stone is cut to fit around it rather than stopped short and filled. The back edge is eased in progressively rather than offered up once and forced. Eased in, never forced.
The hallway turn and the door width, which cap the longest single piece we can physically get to the kitchen regardless of what the run measures.
Access
Getting stone into a Eltham kitchen
Suburban streets with front drives and dropped kerbs on most roads, so the van usually gets within a few metres of the door; the stretches around the High Street and the station are the exception.
Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.
3–7 working days
From template to fitted, working days from template. The same on this patch as every other.
New Malden patch
Eltham is worked from our New Malden run, covering South West London & Surrey.
We come to you
Templated in your kitchen, cut in our workshop, fitted by our own installers.
Access told straight
If the route forces an extra join, you hear that at quote stage, not on the day.
Questions
Worktop installation in Eltham
If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.
Do you actually work in Eltham, or just list it?
Yes. Eltham is on the patch, and the postcodes we work here are SE9. It is run from the New Malden side, covering South West London & Surrey. A drive that shelves towards the house needs the van chocked and the trolley controlled, since a loaded A-frame gathers speed quickly on a slope. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. We would rather ask than guess. We template in your kitchen and fit in your kitchen, so there is nothing to visit and nothing to collect.
What is different about worktop installation in Eltham?
The back addition is a narrow two-storey outrigger with a single external wall, and the kitchen galley runs the length of it. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. Walked, measured, protected, then lifted. The classic Eltham job is templating a new extension where the old back wall has come out — get the steel-supported opening measured properly, it is rarely square to the new build.
Is access a problem in Eltham?
Suburban streets with front drives and dropped kerbs on most roads, so the van usually gets within a few metres of the door; the stretches around the High Street and the station are the exception. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. We walk the route with a tape and protect it end to end before the first piece is lifted. It gets checked before the first piece is lifted. Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it.
Is worktop installation the job you do most in Eltham?
Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop design & quotation and worktop templating. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. Where the window is fixed there is no second day to fall back on, so the prep list matters more than usual. One visit, done properly. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. The fitting day is scheduled to suit that rather than to suit the diary. The prep list is not optional.
What decides the price of a worktop in Eltham?
On a heavily veined stone the island and the run behind it are nested off the same area of slab so the movement relates across the room. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. Dry-lay first, always. Material is £110-£550 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines.
What do I need to sort out first?
An intruding steel column, a brick pier or a downstand breaks a run that would otherwise have been one clean piece. The back edge is eased in progressively rather than offered up once and forced. It is the slow part of the day and it should be. Clear the full hall and stairs route of furniture, bikes, coats and stair-gates, and keep the front door propped and unobstructed for the carry. Where ownership is split across a building, the common parts belong to someone else and the carry route is negotiated rather than assumed. A half-day of access is not a fitting day, and it is better to say so at booking than to find out at eleven. One visit, our own installers.
Related
More around Eltham
Other work we do in Eltham
Next step
Worktop installation in Eltham, priced properly
Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.
25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.