Greenwich · SE9

Kitchen worktops in Eltham

Overwhelmingly 1930s semis, a kitchen of roughly 2.4m by 3m at the back with a garden door and a separate dining room in front. The standard job is a rear or side-return extension that merges the two into one long room with a 3.5m to 4m run and an island.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Kitchen worktop fitted by Worktop WorX

The housing stock

What we are usually working with in Eltham

Lath and plaster, a settled floor and a hall with a turn in it are the three things that decide how this job runs. Almost everything that makes a fitting day hard is a property of the building rather than of the stone. The join is polished flat before we call it done.

The classic Eltham job is templating a new extension where the old back wall has come out, get the steel-supported opening measured properly, it is rarely square to the new build.

The original scullery gully is still live in the yard outside the back door, and new waste from the sink joins a drain laid for a copper and a stone sink. The units are levelled and packed before a top goes near them, because a settled floor shows immediately in a long straight edge. Carried once, and carried properly.

The fabric of the place is 1930s semi, Edwardian terrace, postwar infill and 1960s flats. Knowing which one it is before we arrive is half the survey done.

Access. Suburban streets with front drives and dropped kerbs on most roads, so the van usually gets within a few metres of the door; the stretches around the High Street and the station are the exception.

There is nothing to visit in Eltham. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.

Borough
Greenwich
Postcodes
SE9
Covered on
our south east London run
Lead time
5–10 working days from template

Get a fixed quote Free samples

  • 1930s semi
  • Edwardian terrace
  • postwar infill
  • 1960s flats

Greenwich

The building, and what it does to the job

A side alley and a back door mean most pieces go in whole, and it is the alley width rather than the front door that decides it. The carry is the easy part; the plaster around the old breast and the packing over a moved floor are not. Settlement is packed out, never levered out.

What gets asked for here

Where an overhang is too deep for steel on its own the choice is a leg at the end or a bracket underneath, and a bracket that lands where a knee goes is worse than no bracket at all. Scribes are cut and eased one piece at a time, and a piece is only offered up to its final position once the pieces either side of it are down. The return is offered up last.

Getting stone into the room

Eltham in the housing figures

In the streets around Eltham, the inter-war semi is the dominant house type. The awkward moment is nearly always the same one on this plan, so it is dealt with early. The room decides the order of work.

Corners and joins See the options

Nearby

We also work around Eltham

Eltham is one of 20 places we cover in Greenwich. All 20 Greenwich neighbourhoods

The whole New Malden patch

Questions

Working in Eltham

01

Do you take on Eltham kitchens?

Yes. Overwhelmingly 1930s semis, a kitchen of roughly 2.4m by 3m at the back with a garden door and a separate dining room in front. The standard job is a rear or side-return extension that merges the two into one long room with a 3.5m to 4m run and an island. On a drive that only takes one vehicle nose-in, the van has to reverse the whole length of it to get back out, which decides which way it goes in. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. The parking dictates the sequence, not the kitchen.

02

What is the housing like from a worktop point of view in Eltham?

1930s semi, Edwardian terrace, postwar infill and 1960s flats. The rear door swings inward across the end of the run, so the last few hundred millimetres of worktop are only reachable with the door shut. The day is planned backwards from the hall. Old floors get packed, not argued with.

03

Is getting the worktop in the hard part in Eltham?

Suburban streets with front drives and dropped kerbs on most roads, so the van usually gets within a few metres of the door; the stretches around the High Street and the station are the exception. A loading bay or a red route puts a clock on the unload, so the pieces come off in the order they will be fitted rather than the order they were loaded. Finding it out on the morning costs the whole slot, because there is no second route to fall back on. The last piece off the van is the first one fitted.

04

What do you get asked for most in Eltham?

Worktop installation, in that order. Extension kitchens are usually specified long before they are buildable, so the run lengths on the drawing and the run lengths in the room are different numbers. The fitting day is scheduled to suit that rather than to suit the diary. Six flats, six days, one kitchen at a time. The classic Eltham job is templating a new extension where the old back wall has come out, get the steel-supported opening measured properly, it is rarely square to the new build.

05

Why do Eltham quotes vary so much?

A corbel on show under an overhang is a decision about how the piece looks from a stool, so it gets settled alongside the edge profile rather than left to whoever fits it. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Mitres are pulled together, never pushed. Encased steel is always bigger than the steel inside it, so the casing is what gets plotted, and a casing is rarely square to the wall it sits against. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. Level is checked across the room, not along one wall. Material runs from £110 per square metre supply only, and templating, fabrication and fitting are quoted on their own lines rather than rolled into one figure.

06

Is a leasehold flat in Eltham any harder to do?

The same building type can arrive as a careful one-off kitchen or as a fast turnaround, and the honest answer is that they are priced differently. The fitting day is arranged with whoever can actually give us access for the whole slot. Booked with whoever actually holds the keys. Tell us the building when you book and the lift, the stair turn and any freeholder notice get built into the day rather than found on it.

07

Can you machine drainer grooves into the stone?

Grooves are machined into the surface rather than applied to it, so there is nothing to come loose later. Grooves are machined in the workshop at the same time as the bowl cut-out, because they cannot be done well in a kitchen. A hundred and forty years of alterations sit under the current kitchen, and the worktop is what has to sit flat on top of all of it. The fitting day is planned backwards from all of it, before the first piece comes off the van. Old plaster gets scribed to, never fought with.

08

How much upkeep is a stone worktop?

Granite tells you when the seal wants topping up: water stops beading on the surface and starts darkening it instead. Topping a seal up is a wipe-on job with a cloth. Quartz carries resin, so a hot pan wants a trivet, while granite and sintered stone will take one without complaint. Sash windows in the addition sit low and the sill can land under standard worktop height, so the top is notched round it or the run stops short of it. We measure the front door, the hall width and the turn into the kitchen before anything comes off the van, because a 3m piece has to swing through that corner on edge and stone does not bend to help you. The units are shimmed to one datum before stone touches them.

09

What if the base units are out of level?

Packing takes up small variation. It is not there to hide something that belongs in the units. An island is where this usually shows, standing free with no wall to level against. Where a run meets an appliance, level decides whether that appliance door still clears the stone above it. A brick pier standing into the run divides it in two, and the join goes against the pier where a clear wall would have needed no join at all. Rushing that is what leaves a gap you look at every morning for fifteen years. The notch is eased until it drops, then bonded.

10

What if something breaks during the fit?

A remade piece is cut from the same slab run wherever the slab allows, because a replacement from another batch will not match across a join. The rest of the kitchen still goes in. One damaged piece does not hold up the pieces either side. The van gets close to the door and the stone comes off the tail lift onto a trolley, which is about the shortest carry we ever get. We walk the route with a tape and protect it end to end before the first piece is lifted. A carry that needs six hands gets six hands.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“Professional, polite and friendly service. Very pleased with finished product.”
costas andrewsGoogle review
★★★★★
“I used Karem’s services 5 years ago for purchasing and fitting the quartz worktop in my then brand new kitchen. The price was reasonable and the service reliable and spot on, no delays in fitting, misunderstanding or excuses. I recommended him to a friend, who also used his services and they were happy too! If I need to order new kitchen work top again, I would definitely use him again. Thanks Karem!”
shoshencenceGoogle review · quartz
★★★★★
“Karem did an excellent job on my kitchen. He was professional, reliable, and paid great attention to detail. The finish looks amazing and has completely transformed my kitchen. Thank you! Would highly recommend his work!”
Catalina RaduGoogle review

Next step

Get your Eltham kitchen priced

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.