Greenwich · SE9

Worktop installation in New Eltham

Fitting day: protected route, back edges scribed to the real wall line, joins pulled flush, sink and hob sealed.

  • 25-year material · 5-year workmanship
  • Fitted 5-10 working days from template

Get a fixed quote +44 7830 847489

Induction hob set into an Enzo run below a full-height matching splashback, under the painted mantel canopy

New Eltham kitchens

The kitchens we meet in New Eltham

Before we quote any of the installations in New Eltham we want to know what the kitchen actually is, because the answer changes more than the price. Wider interwar plots than Eltham proper with more detached houses and chalet bungalows, so kitchens are square rather than long, usually reworked into a U with a peninsula. A fair number of bungalow kitchens have low ceilings and window sills that sit close to the worktop. You do not have to work out which of those you have. We will look at it with you when we come to New Eltham.

The old larder leaves behind a thick cold shelf and a vent brick through the outer wall, and both have to go before that wall reads flat. Protection down, dry-lay, scribe, then bond: the order matters more in a difficult room than an easy one. Sink and hob seated and sealed before we go.

The roof space above carries services, so a boiler flue or a soil vent can drop into a corner of the kitchen and stay exactly there. The side route is boarded where it crosses a soft path or a border, and the gate is measured rather than assumed. Movement joints in the shell stay movement joints.

What the surveys keep coming back to is 1930s semi, interwar chalet bungalow, 1960s detached and postwar infill. The join count is decided by which of those the room sits in.

Mitred waterfall edge detail on a quartz island
  • 1930s semi
  • interwar chalet bungalow
  • 1960s detached
  • postwar infill

True everywhere

Worktop installation, in short

  • One visit. A straightforward run is a morning; an island and splashbacks take most of the day.
  • A granite top is treated with sealer on the day it goes down.
  • Workmanship is guaranteed for five years, the material for 25.
  • Every piece is carried in by hand, and stone does not bend.
Borough
Greenwich
Postcodes
SE9
Covered on
our south east London run
Fitted
5–10 working days from template

The place

Why New Eltham is its own job

People who have already had stone fitted in New Eltham will know most of what follows, and will know why we ask. Good: nearly every house has a drive or hardstanding, the roads are wide and turning space is easy, with pinch points only around the station and the shops. Low sills under the sink window are common in the bungalows, check upstand height at template stage or you'll be cutting on site. That is why the quote is itemised: you can see what the building is costing you and what the stone is.

The work

What worktop installation involves

Installation assumes the pieces already fit. It is not a fitting service for stone somebody else cut, because the day depends on the template and the machining having been done to the same drawing. The run is set out from a fixed point, a corner or the wall the sink sits against, and worked outward, so what tolerance the room has ends up at the open end where it can be absorbed. You end up with a run fitted by the same firm that templated it, and with the offcuts, packaging and old sealant taken away rather than left in the front garden.

A straightforward run is a morning. An island, a set of splashbacks, or both, is most of a day. The hall, the stair nosings and the door architraves take more damage on a fitting day than the kitchen does, so those are what get boarded. Solid brick with a sand and cement render is firm to fix against and reliably out of plumb along the length of a run. Fitted by the people who measured it.

Waterfall ends See the options

The money

What it costs in New Eltham

Two identical kitchens fit at different prices when one is up a stairwell and the other is through a back door. A U is three runs and two corners, so the join count and the edge metreage both rise faster than the floor area does. Two quotes can agree on a supply rate of £110 to £550 per square metre and still land a long way apart, because the cut-outs, the joins and the edge profile are priced after it. Access is quoted honestly or not at all.

1930s and inter-war semis

What New Eltham asks for

The housing here generates this more than any other job we do, ahead of worktop replacement.

1930s and inter-war semis

The carry, and what it rules out

A gate post set narrower than the opening looks generous from the road and stops a wide piece a metre in. A van that has to move mid-fit costs the best part of an hour and takes a man off the tools to do it. A drive and a red route make two different fitting days.

1930s and inter-war semis

New Eltham in the housing figures

On these streets bay-fronted inter-war housing sets the pattern. The slow part is the scribe, and it is slow for a reason. The route is walked before the first piece moves.

Access

Getting stone into a New Eltham kitchen

Tell us what the approach looks like when you book the template and it gets built into the day rather than discovered on it. Where the route is genuinely tight, it changes how the pieces are cut, which is a fabrication decision rather than a delivery one.

5–10 working days

From template to fitted is 5–10 working days from template. The same on this patch as every other.

South east London patch

New Eltham is covered on our south east London run, along with the rest of Greenwich.

We come to you

Templated in your kitchen, cut in our workshop, fitted by our own installers.

Access told straight

If the route forces an extra join, you hear that at quote stage, not on the day.

Questions

Questions we get asked in New Eltham

If yours is not here, ring and ask. You get a straight answer rather than a call-back from a salesperson.

01

Is New Eltham far enough out to be a problem for you?

Yes. New Eltham is on the patch, and the postcodes we work here are SE9. It is worked on our south east London run, along with the rest of Greenwich. Overhanging branches clear the roof of a car and catch the roof of a van, so the drive is looked at from the driver seat rather than from the doorstep. The fitting slot is set around it, which is why we ask about it when the date is booked and not before we leave the yard. The first hand off the van is the one holding the clock. Both visits happen in your kitchen, the template and the fit, so there is nothing to visit and nothing to collect.

02

What do the kitchens in New Eltham do to worktop installation?

Everything on one level means no stairs, no landings and no turns, which is about the easiest carry there is in domestic work. Access is usually the easy part here, as most of these have a side gate and a back door straight into the kitchen, so we carry down the side alley rather than through the house and keep the mess outside. A structure this old is worked with, not corrected. A window board sitting below finished worktop height leaves two choices, drop the top under it or notch the stone around it, and both cost more than a straight run. On the day it means dry-laying, marking, and cutting the scribe on site before anything is bonded. The awkward corner goes in first, not last.

03

Do you have trouble getting long pieces into New Eltham kitchens?

A loading bay or a red route puts a clock on the unload, so the pieces come off in the order they will be fitted rather than the order they were loaded. The fitting day is planned backwards from that point, before anything comes off the van. Every piece is staged to it before fitting starts. On a drive that only takes one vehicle nose-in, the van has to reverse the whole length of it to get back out, which decides which way it goes in. We aim for the first slot of the day where parking is tight, because that is when the street is emptiest. It is why the arrival time is what it is.

04

Does worktop installation come up more than anything else in New Eltham?

Yes. On the research for this patch it is the first of the three jobs listed, ahead of worktop replacement. A new extension slab is not automatically level, and that wants checking before templating rather than after the stone is cut. The fitting day is scheduled to suit that rather than to suit the diary. Booked around the turnaround, not our diary. The junction between the original room and the extension is the point to watch, because the two floors rarely sit at the same height. Where the window is fixed there is no second day to fall back on, so the prep list matters more than usual. The prep list is not optional.

05

What decides the price of a worktop in New Eltham?

The two returns in a U are close to the same size and it is tempting to nest them side by side, except that the veining then mirrors across the room and reads as deliberate for the wrong reason. On the day that means dry-laying the whole layout first and only then pulling and bonding the joins. Scribed one piece at a time. Reckon on £110 to £550 per square metre for the material supply only, with templating, fabrication and fitting itemised separately.

06

What do I need to sort out first?

A cill projecting forward of the plaster line pushes the back edge out, and the units then stand off the wall by that amount for the whole length. Rushing that is what leaves a gap you look at every morning for fifteen years. Fixings find the studs or they find nothing. Unlock and clear the side gate and back door, and move bins, planters and washing lines out of the alley run. An owner living in the house makes the decisions and lives with them, so the specification tends to go towards the material rather than towards the lowest total. The fitting day is arranged with whoever can actually give us access for the whole slot. A rolling programme loses a flat to one missing key.

07

Will you fit stone onto units that are not level?

Packing takes up small variation. It is not there to hide something that belongs in the units. Units have to be fitted, fixed and level before templating, and it is better to hear that at the template than on the fitting day. Levelling belongs in the carcasses, on their own legs and packers. Where the sill lands inside the height an upstand would occupy there is no upstand, and the stone either dies into the reveal or stops short of it. The back edge is eased in progressively rather than offered up once and forced. A bonded mitre goes down on one plane or not at all.

08

What do you need from me for the sink and hob cut-outs?

We seat and seal the sink and hob on the day; water, waste, gas and electrics are for your plumber and electrician. The tap hole is drilled in the workshop too, and its position depends on how far the tap has to swing. Nothing is cut out in the kitchen. Cutting a bowl on site is how worktops get cracked. Three runs is three scribes and three separate lifts, so a U takes longer on site than its metreage suggests even on a day when nothing goes wrong. A layout that has been packed and levelled run by run instead of to one datum shows as a step where two pieces meet. One datum for every run in the room.

09

How much upkeep is a stone worktop?

Bleach and limescale remover harm a polished finish rather than clean it, whichever material is on the units. Sealing is the one maintenance job that genuinely differs by material, and it is worth knowing which you are buying before the slab is chosen. Marble is the one people underestimate. It is porous, like granite, and wants sealing. Bungalow kitchens are frequently extended into the rear or opened into the roof space, so the room is part original and part new build. The fitting itself is slower than the carry: original plaster on the party wall and around the old chimney breast is rarely square to the run, so back scribes get cut on site, and where a return wraps into a breast recess we template that shoulder tight and ease it in. The tops go on level even when nothing else is.

10

Can you machine drainer grooves into the stone?

Which side of the bowl they go is about how you stand at the sink, and it is settled before cutting. The grooves sit inside the depth of the top with stone left either side, so a shallow run limits them. Where the side return has been filled in, one side of the new room is old brick and the other is new blockwork, and the two do not behave alike. The fitting day is planned backwards from all of it, before the first piece comes off the van. Levelled under the units first.

Reviews

5.0 from 26 Google reviews

Every one of these is on our Google profile under the reviewer’s own name. Nothing here is written by us, and the link goes straight to the source.

Read all 26 See them on Google

★★★★★
“We have a new kitchen. Our builder recommended Worktop Worx for our worktop. Now we have an amazing worktop very good price too. Really recommend. They were really good to us. 10/10”
j thomasGoogle review
★★★★★
“We recently had the Arctic Starburst worktop installed by Worktop WorX and it looks amazing. The subtle sparkle really catches the light and gives the kitchen a clean, modern feel. The Arctic Starburst surface feels high quality, durable, and is easy to keep clean. The finish and installation from Worktop WorX were spot on. Really happy with the result and would definitely recommend both Arctic Starburst and Worktop WorX to anyone upgrading their kitchen.”
Han LeeGoogle review · Arctic Starburst
★★★★★
“Great work, super helpful team. I'd definitely recommend!”
Andreea TanaseGoogle review

Next step

Worktop installation in New Eltham, priced properly

Plans, a sketch or photographs with rough run lengths is enough to start. You get an itemised written quote and the template dates we can offer on this patch.

25-year material warranty and a 5-year workmanship guarantee, both stated on your quote.