The housing stock
What we are usually working with in Hackbridge
The kitchen normally sits in the back addition or a later side return, which puts the run against the oldest and least straight wall in the building. Splashbacks come off the same slab run as the tops, which means the decision has to be made before fabrication starts. The batch is held while the tops are cut, or the colour drifts.
New-build kitchens here are already fitted, so a replacement top means lifting out an existing worktop with a sealed sink and tiled splashback without damaging the cabinets underneath.
The original larder or store cupboard usually survives in a corner, and that alcove is deeper than the units and squarer than the walls around it. Sockets and switches are cut to measured positions with the faceplates off, not to the positions shown on a drawing. The tile bed comes off before anything is measured.
What the street keeps repeating is Victorian terrace, inter-war semi, 2000s eco-development and recent flatted development. The template reads them differently even where the layout looks identical.
Access. Flat ground with reasonable parking on the older streets, but the newer developments have podium parking, controlled entrances and a lift booking process, and the Wandle crossings limit which way a van can approach.
There is nothing to visit in Hackbridge. Samples are posted free, the template is taken in your kitchen and the stone is fitted there too.