The building, and what it does to the job
On the Higham Hill streets we cover, the bands run low by London standards. The sink and hob are seated and sealed before we leave; we do not connect water, waste, gas or electrics. What the figures predict, the fitters still verify.
Windows went in on a programme with plastic frames set into the original openings, so the frame is thicker, the glass area smaller and the reveal has a liner over the concrete. Plaster bonded straight onto concrete comes away with the bottom course of tiles, leaving a band behind the upstand. The old top hid it; the new one will not.
Side access to the rear is the norm, so long single pieces are achievable and the design does not have to be broken up for the hallway.
